| description | Write the canonical engineering record of a fixed bug or resolved incident — root cause, mechanism, fix, validation, and how it slipped through — for other engineers and future-you. Refuses to draft until the bug is fixed and the fix is validated. Use after a debug/diagnose session lands a verified fix (pairs with diagnose), or when asked to write a post-mortem / postmortem / RCA / root-cause analysis, document a fix, or close out a bug with a writeup. For a customer-visible outage it switches to incident mode (timeline, 5 Whys, severity, action items). Blameless throughout. |
Post-mortem
Overview
The canonical engineering record of a bug fix. Written after debugging lands a real, validated fix, for the next engineer (and future-you, who will have forgotten everything in six months). Code identifiers are first-class here — this is the artifact that lets the next person recover the mental model fast and grep their way back to the offending lines.
Core principle: Record what happened, not a hypothesis of what happened. No root cause without evidence; no validation claim broader than what you actually ran; no blame. If the facts aren't there, ask — don't fill the gap with plausible prose.
This pairs with diagnose: diagnose lands and verifies the fix, post-mortem records it. Pull the diagnose session's repro, rejected hypotheses, and the confirming experiment straight into the writeup.
Two modes
| Mode | When | Shape |
|---|
| Bug fix (default) | A bug was found, fixed, and the fix validated | The structure below — root-cause-centric engineering record |
| Incident | A customer-visible outage / degradation | Timeline-centric: timeline reconstruction → 5 Whys → severity + blast radius → action items |
If it's an outage (users affected, downtime, data loss), confirm and switch to incident mode — it needs a timeline and blast radius the bug-fix shape doesn't capture.
Required inputs — refuse to draft without these
Before writing a line, confirm all four. If any is missing, list what's missing and stop:
[ ] Reliable repro — deterministic or high-rate, runnable by the next person (not "happens sometimes")
[ ] Root cause known — the mechanism is identified, not a hypothesis
[ ] Fix identified — PR / commit / branch pointer
[ ] Fix validated — the original repro now passes; the failing workload/test now succeeds
A post-mortem of a hypothesis is worse than no post-mortem. Don't draft one.
Skip it entirely for trivial fixes (typo, obvious one-liner) — the PR description is the record. Don't manufacture ceremony.
Structure (bug-fix mode)
Use these blocks in order. Summary, Root cause, Fix, Validation are mandatory; the rest are usually present.
- Summary (mandatory) — one paragraph: what broke in workload terms, what fixed it in one sentence, plus ticket/PR/owner. A reader who stops here has the right answer.
- Symptom — what was actually observed: test output, error, log line, perf number, customer report. Concrete identifiers, not paraphrase.
- Root cause (mandatory) — the actual bug mechanism, code identifiers expected (functions, files, fields, branch conditions, the offending commit SHA). Walk the cause chain end to end. This is why the document exists.
- Why it produced the symptom — link cause to symptom when it's non-obvious (the bug is in
prepare() but the visible failure is a hang hours later). Let a reader who only knows the symptom connect it back without re-deriving.
- Fix (mandatory) — what changed and why it addresses the root cause rather than hiding the symptom. Link the PR. If a prior fix papered over the symptom, name it and what was wrong with it.
- How it was found — short: the repro that made it deterministic, the tools that cracked it, hypotheses tried and the one-line reason each was rejected, and the single experiment that confirmed the cause. For the next debugger — make it learnable.
- Why it slipped through — the real reason it reached the branch/release/customer: CI gap, latent code broken by a later change, workload gap, incomplete prior fix, or review miss. If the honest answer is "we should have caught this," say so. Describe the gap, never the person.
- Validation (mandatory) — how you know it works: failing test now passes (name/link), workload completes (id/link), perf number before→after, soak/stress duration. State coverage honestly — "validated on config X; not retested on Y" is information, not a hole. Implying broader coverage than you ran is the failure mode that breeds repeat regressions.
- Action items — concrete follow-ups not already in the fix PR, each with what + owner (role) + tracking artifact. If there are none, write "None — fix is sufficient." Don't invent items to look thorough.
Structure (incident mode)
- Header — severity (P1/P2/P3), duration, impact (users/systems/data/revenue).
- Timeline — chronological
HH:MM — event (source), reconstructed from git log --since/--until, CI runs, monitoring, and manual notes.
- Root cause — 5 Whys — Problem → Why 1 (immediate) → … → Why 5 (systemic). Action items aim at the deepest Why, not the symptom.
- Action items — each: action + owner (role) + deadline + which Why it prevents. Categorize: Detection / Prevention / Response / Recovery.
- What went well / what to improve — what limited the blast radius, what systemic gaps remain.
Tone
- Code identifiers are first-class — keep function names, paths, fields, SHAs. They're the index the next engineer greps.
- Mechanism over narrative — say which function skipped which step under which condition, not "a synchronization issue."
- No hedging — drop "we believe / appears to / may have." State it or leave it out.
- Blameless — describe the bug, the gap, the fix. Never "X should have caught this." The CI gap is the failure mode, not the person.
- No advocacy — a post-mortem records what happened and what's next. Arguing for a refactor is a separate proposal; link to it from the action items.
Output flow
- Confirm readiness. Bug-fix mode: confirm the four required inputs; if any is missing, list them and stop. Incident mode: confirm the incident is resolved or stabilized and the timeline/root cause rest on evidence (monitoring, git log, notes), not reconstruction-by-guess; if the cause is still a live hypothesis, say so and write only the confirmed timeline and open questions — do not assert a root cause.
- Confirm the destination (PR description,
docs/postmortems/<id>.md, ticket comment, wiki). The shape is the same; only the wrapping changes.
- Produce the draft as one block.