| description | Create detailed, execution-ready implementation plans for complex or high-risk changes without coding. Use for ExecPlan-style work, multi-hour changes, significant refactors, migrations, resumable phase checklists, and work that should be handed off to execute-plan with clear validation. |
| argument-hint | [--non-visualize] [brief description of the change to plan] |
| license | MIT |
Write Plan
Overview
Produce a complete, self-contained implementation plan that can be executed by execute-plan with minimal ambiguity, even after /clear or by another agent.
This skill is for planning only:
- Do not implement code
- Do not modify production files (except plan artifacts)
Workflow
Step 1: Contextualize
Load only the project context relevant to the requested change:
- If
docs/SUMMARY.md exists, read it first.
- Load only task-relevant detail docs.
- Prioritize
Code Standard docs for implementation conventions.
- If docs conflict with code or user intent, use the available input/question tool before broad changes.
Then inspect only the code areas relevant to the requested change.
Capture:
- User-visible purpose and expected outcome
- Existing patterns to follow
- Constraints and dependencies
- Files, modules, commands, and docs that orient the executor
- Risks, assumptions, and unknowns
Step 2: Initialize Plan Artifacts
- Create:
docs/.plans/YYMMDD-HHmm-<plan-slug>/
- Create:
SUMMARY.md
- one phase file per implementation phase with naming convention
phase-XX-<name>.md
- Add
research/ only if needed.
Rules:
- Use timestamp commands from the shared General Principles for folder and document timestamps.
Step 3: Clarify Requirements
Ask clarifying questions to resolve any ambiguity in the request. Focus on:
- Scope and boundaries
- Success criteria
- Constraints and non-goals
- Priorities and trade-offs
Rules:
- If requirements are already clear or come from the brainstorm context, no need the confirmation step.
- Use input/question tool for gathering answers, context.
- State assumptions explicitly in
SUMMARY.md. If multiple interpretations of the request exist, list them and ask — never pick silently.
Step 4: Define Strategy and Phases
Design a phased strategy that is safe and verifiable.
Each phase should have:
- A clear objective
- The complexity and risk level appropriate to the phase with values:
S, M, L, XL
- Ordered tasks
- Verification commands
- Observable acceptance criteria and exit criteria
Granularity rule:
- Tasks should be small, concrete each.
- Prefer phases that can be resumed safely. Document idempotency, recovery notes, or rollback constraints for risky work.
Step 5: Research (Only if Needed)
Research is optional and should be proportional to uncertainty.
Preferred order:
- Existing project docs and code
- Existing skills and local references
- External references (only if available in the current environment)
If external research capability is unavailable, proceed with local evidence and explicitly list assumptions and open questions.
Document findings in:
docs/.plans/YYMMDD-HHmm-<plan-slug>/research/<topic>.md
Step 6: Write Plan artifacts
-
SUMMARY.md format
Follow the template inside references/summary-template.md
-
phase-XX-<name>.md format
Follow the template inside references/phase-template.md
-
Use skill visualize to visualize the plan, otherwise, skip visualization if --non-visualize is present.
Step 7: Review and Refine
Before presenting the plan, verify:
- Paths are exact and consistent
- Phase order is logical
- Tasks are actionable (no vague steps)
- Verification is defined for each phase
- Acceptance criteria are observable
- Risks/assumptions are explicit
- Plan is executable without hidden context from the current chat
Then present for user review.
If multiple viable approaches exist, present options and ask for one of: (use input/question tool for selection)
- Confirm: approve current plan for execution
- Validate: refine via additional clarifying questions
Step 8: Handoff
End with:
Plan `<relative_path_to_plan>/SUMMARY.md` is ready.
If visualization was created, also include:
Visualization `<relative_path_to_plan>/visualize.html` is ready.
Rules
- Never automatically implement or execute the code change in the same session. Optional plan visualization is allowed only after user selection and only for the plan artifacts.
- Prefer explicit file paths and concrete commands
- Align with project standards and existing architecture
- Keep plans self-contained, deterministic, and resumable. A fresh agent should be able to continue from the plan folder alone.
- Plan the minimum viable change: No speculative phases, no "just in case" abstractions, no flexibility that wasn't requested. If a plan can be 3 phases instead of 6, make it 3. Every task should trace directly to a stated requirement.
- Write artifacts in language same with the current session.