Plan Orchestrated
You are generating a high-level implementation plan for a software feature or task. You work collaboratively with the user — every major decision goes through them.
Setup
- Determine the project root directory. If
$ARGUMENTS specifies a directory, use it. Otherwise use the current working directory.
- Read the project's
CLAUDE.md if it exists.
- Read any existing files in
spec/ to understand prior plans and specs.
- Read the plan template from
${SKILL_DIR}/references/plan-template.md.
Author Authority
The plan you produce is agent-generated. There is no guarantee of correctness until decisions have been explicitly made by the author (the user). The author is the authoritative source of truth on all architectural and implementation decisions in the plan.
- Do not introduce approval tracking, sign-off checkboxes, or status fields into the plan document. Authority is social, not procedural.
- Present decisions and recommendations, but frame them as proposals for the author to confirm or override.
- The plan will be revised during spec work if spec-level decisions reveal better approaches. This is expected and correct.
How to Refer to Tasks
Never refer to a task by number or title alone (e.g. "Task 2.1.3" or "the serialization task"). The user does not have the entire plan in memory. Always describe the task's contents and context when discussing it.
How to Present Decisions
Do not use AskUserQuestion for design decisions. Interview-style questions force binary or ternary choices, often based on flawed assumptions, and the answer is most often "none of the above" or "some of each."
Instead, present decisions conversationally:
- Lay out the design space in prose. Describe the options, what each implies, and where the tensions are. Use tables for comparing concrete tradeoffs, but wrap them in explanatory text.
- Be explicit about what's at stake. "If we go with X, that means Y for the rest of the system. If we go with Z, we get A but lose B."
- End with a recap list of the specific questions the user needs to answer, so they can respond point-by-point without re-reading the whole discussion.
This gives the user room to say "actually, a mix of options 1 and 3" or "you're missing an option entirely" — which structured interviews prevent.
Workflow
1. Requirements Gathering
- If
$ARGUMENTS contains a feature description, use it as the starting point.
- Clarify requirements conversationally — lay out what you understand, what's ambiguous, and what you'd like the user to confirm. End with a recap of specific questions.
- Keep the discussion focused and efficient.
2. Plan Development
Work through these elements collaboratively with the user.
Every plan MUST include these mandatory phases:
Mandatory Phase 0: Dead Code Removal
The first phase of every plan is a complete removal of all code, tests, references, and imports that will become dead or stale as a result of the planned work. This phase:
- Runs before any plan-spec agents, so they never see legacy code in their context.
- Identifies all code paths, tests, imports, type references, config entries, and documentation that will be replaced or made obsolete by the planned implementation.
- Removes them entirely. This will break things — that is expected and correct.
- Is a single-wave phase with no dependencies, executed first.
Skipping this step causes planning agents to include legacy code in their context, which waters down plans and leads to backwards-compatibility shims. This phase is non-negotiable.
Mandatory Final Phase: Legacy Reference Review
The last phase of every plan is a complete audit for any remaining legacy references. This phase:
- Runs after all implementation phases are complete.
- Searches the entire repository for stale references to removed code: imports, type annotations, string literals, config values, documentation, test fixtures, and comments.
- No legacy references are acceptable in any form.
- Reports findings and removes any that are found.
Goals: Define concrete, measurable deliverables. Each goal should be something you can point to and say "this exists and works."
Non-Goals: Explicitly exclude things that might seem in scope but aren't. This prevents scope creep during implementation.
Phases: Phases exist to maximise parallel execution and provide clean verification boundaries. They are NOT for narrative grouping, conceptual themes, or "keeping related ideas together." The narrative is the whole plan; phases are an execution-graph tool.
Phase boundaries are decided by two criteria, in this order:
- Parallelisability: Independent work that does not need each other's output goes into sibling phases (same parallel tier in the dependency graph). Sequential work — where Phase B genuinely needs Phase A's output — goes into a downstream phase.
- File locality: The same file should not be touched by more than one phase. Group all changes to a given file into a single phase wherever the dependency graph allows it. Splitting a file across phases multiplies agent context (each phase's agents must re-read the file, re-understand it, and re-coordinate edits) and creates merge friction with no benefit. For sibling phases (same parallel tier), file locality is not just hygiene — it is a hard correctness requirement: siblings run concurrently at implementation time, so a file shared between two siblings means two implementers fighting the same lock.
review-spec fails any plan where sibling phases share a file.
Anti-patterns to avoid:
- "Phase 2: Models, Phase 3: Services, Phase 4: API" when models, services, and API for the same feature could be one phase per feature — splitting by layer scatters every feature across every phase and forces every agent to load every layer.
- "Phase 2: Refactor
foo.py, Phase 5: Add new behaviour to foo.py" — both phases now require deep knowledge of foo.py; collapse them.
- Splitting a coherent change across phases because the changes "feel like different ideas." If they touch the same files and one does not depend on the other's runtime output, they belong together.
The two mandatory phases are the only allowed exceptions. Phase 0 (Dead Code Removal) and the Final Phase (Legacy Reference Review) are themed-by-purpose, not by file locality. They span whatever files contain dead or stale references — file-locality grouping does not apply. Do not try to fold either into a feature phase, and do not split them by file-locality. They are the only phases where "narrative purpose" defines the boundary; every other phase must follow the parallelisability + file-locality rule.
Number phases in execution order. Phases that can start in parallel after the same dependency should have consecutive numbers. For example, if Phases A, B, and C all depend only on Phase 1, they should be numbered 2, 3, 4 — not 2, 3, 7. The numbering must reflect when work can actually begin, so a reader can see at a glance which phases are parallelizable and which are sequential.
Each phase must be independently verifiable — when it's done, you can confirm it works without needing later phases. If a "phase" cannot be verified on its own, it isn't a phase boundary; merge it with the phase that completes its contract.
Include a dependency graph in the plan showing the execution topology. Use a simple ASCII diagram showing which phases depend on which, and which can run in parallel. Example:
Phase 1 (Foundation)
├──→ Phase 2 (Foo) ─── parallel after 1 ──┐
├──→ Phase 3 (Bar) ─── parallel after 1 │
│ │
│ Phase 4 (Baz) ─── after 3 │
│ │
└──→ Phase 5 (Qux) ─── after 4 + 2 ─────────┘
Machine-readable dependencies (mandatory). The dependency graph above is prose; the implementation runtime needs it as data. Every phase MUST carry an explicit, parseable **Depends on**: line naming its direct prerequisite phases, written as a phase-number list (plan-spec transcribes this verbatim into each phase's depends_on array in spec/manifest.json, which drives parallel scheduling). Use the template's form — **Depends on**: Phase 1 — \depends_on: [1]`— on every phase. Phase 0 isdepends_on: []; the Legacy Reference Review phase depends on every other phase. List only **direct** prerequisites, not transitive ones. This is not optional and there is no fallback: a phase without a depends_ondeclaration is an incomplete plan andreview-spec` will fail the manifest.
Waves: Within each phase, group tasks into waves. Tasks within a wave can potentially be implemented in parallel. Tasks in later waves depend on earlier waves completing. At implementation time, the k-th wave of every sibling phase in a tier is merged into a single concurrent batch, so keep wave boundaries genuinely about intra-phase ordering — do not use them for cross-phase coordination (that is what phase tiers are for).
Tasks: Each task is a discrete unit of work. For each task, define:
- A clear description of what to build
- Complexity rating: S (small/simple), M (medium), L (large/complex)
- Key files that will be created or modified
Verification: Define how to confirm each phase is correct. These should be concrete, runnable checks — not vague statements like "it works."
3. Complexity Ratings
Complexity ratings drive implementer model selection during implementation:
- S (Small): Single-file changes, straightforward logic, clear patterns to follow → haiku
- M (Medium): Multi-file changes, some design decisions, moderate complexity → sonnet
- L (Large): Architectural decisions, complex logic, cross-cutting concerns → sonnet
4. Review and Write
- Present the complete plan to the user for review.
- Incorporate any feedback.
- Create
spec/ directory if it doesn't exist: mkdir -p spec
- Write the approved plan to
spec/plan.md using the template format.
- Initialize
spec/progress.md with a header if it doesn't exist.
Output
The plan is written to spec/plan.md following the template in ${SKILL_DIR}/references/plan-template.md.
If spec/progress.md doesn't exist, create it:
# Implementation Progress
Progress is recorded here by implementation agents. Each completed task appends its status below.
Shell Safety (Windows)
This project runs on Windows with Git Bash. All bash commands MUST:
- Double-quote all paths — backslashes are escape characters in unquoted strings.
- Use forward slashes in paths.
- Use
/dev/null, never NUL.
Important
- Present design options in prose with tables for concrete tradeoff comparisons — never as bare structured interviews.
- When describing tasks to the user, always include their content and context, not just their number or title.
- Surface dependencies between tasks explicitly.
- Keep task granularity appropriate — each task should be completable by a single agent in one session.
- Ensure wave ordering respects dependencies (a task can't use something built in a later wave).
- Phase boundaries are an execution-graph tool, not a narrative tool. Group by parallelisability and file locality, not by concept or layer. The same file should appear in at most one phase wherever the dependency graph allows.