| name | division-25-integrated-automation-bid-scope |
| description | Whole-division starter rules for CSI Division 25 - Integrated Automation. Use when starting, triaging, validating, or packaging a commercial building automation or integration bid. |
Division 25 - Integrated Automation Bid Scope
Company: Your Company
CSI division(s): 25
Spec section hints: 25 00 00, 25 05 00, 25 08 00, 25 10 00, 25 30 00, 25 50 00, 25 90 00
Scope Rule
Base bid is limited to CSI Division 25 - Integrated Automation work specifically assigned to the bidder: building automation integration, networking, controllers, programming, sequences, analytics, and system interfaces. Mechanical controls in Division 23, electrical power, low-voltage cabling, cybersecurity requirements, and owner platform work must be explicitly included, excluded, or flagged before pricing.
Base Scope
- integrated automation controllers
- building automation software when assigned
- integration gateways and interfaces
- sequences and programming
- automation network coordination
- graphics and trend setup when assigned
- commissioning support when assigned
Terms That Usually Identify This Scope
- integrated automation
- building automation
- BAS
- BMS
- DDC
- controls integration
- gateway
- sequence of operation
- 25 00
Adjacent Scope To Exclude By Default
- electrical power
- mechanical equipment
- low-voltage cabling
- fire alarm
Adjacent Scope To Flag Before Pricing
- owner platform
- cybersecurity
- network
- commissioning
- training
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-25-integrated-automation.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-25-integrated-automation before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.