Skip to main content

awh-gate

Out-of-band verification gate for the testing to done transition. Independently reruns the Task's section-1 cited tests plus its module suite via `awh eval` against a sealed, read-only baseline, and blocks the transition on any regression. Emits an awh-eval@1 artefact: per-task pass@1, the weighted aggregate, the sealed-baseline hash, and a GREEN or RED verdict. Used by chief-technology-officer/ship-tasks at step 28, after the post-implementation Task-audit (step 27) and before the done flip (step 30). GREEN is required to reach done; RED routes the task back to ready_to_implement per STATUS-REFERENCE section 1.3. Use when the user asks to "run the awh gate", "verify this task out of band", or "gate testing to done". Do NOT use for spec correctness (that is task-audit, during draft to ready_to_implement) or for in-context coverage (that is coverage-gate-author); this skill is the independent rerun those two are not, because an agent grading its own work is not a check.

الانتقال إلى التثبيت

معلومات المصدر

المستودع
cyberskill-official/cyberos
آخر نشاط في المصدر
٢٠ يوليو ٢٠٢٦ في ٠٢:٤٢
لغة SKILL.md المكتشفة
الإنجليزية
النجوم
٦٠
التفرعات
٢

خيارات التثبيت

يُحدَّد Prompt الذي يراجع المصدر أولًا بشكل افتراضي. يمكنك التبديل إلى أمر مباشر أو تنزيل نسخة محلية.

مراجعة ملفات المصدر

اقرأ SKILL.md وأي ملفات مرافقة يعرضها SkillsMP قبل أن تقرر التثبيت.