| description | Plan stage orchestrator that runs all three Plan sub-steps (spec → project-plan → tasks) in sequence with governance gates. Stops on rejection, continues through approvals. Use this skill when you need to run the full Plan stage, navigate planning sub-steps, or resume after a rejection. |
Plan Stage Orchestrator Skill
Purpose
Orchestrates the full Plan stage by running spec → project-plan → tasks in sequence. After each sub-step completes and its governance review passes (APPROVED), the orchestrator automatically advances to the next sub-step. If any review returns CHANGES_REQUESTED or BLOCKED, the orchestrator stops and reports the rejection so the user can fix and re-run /aod.plan to resume.
With 1M context, all three artifacts and their reviews fit comfortably in a single session.
How It Works
Step 1: Determine Feature Context
- Get branch:
git branch --show-current → extract NNN prefix
- If on
main and a PRD exists (e.g., docs/product/02_PRD/{NNN}-*.md), automatically create the feature branch (git checkout -b {NNN}-{kebab-name}) per git workflow rules. Do NOT ask the user — feature branches are mandatory, not optional.
- Open Draft PR: After creating the branch, push it and open a draft PR so work is visible early:
git commit --allow-empty -m "chore({NNN}): open feature branch"
git push -u origin {NNN}-{kebab-name}
gh pr create --draft \
--title "{NNN}: {Feature Name}" \
--body "Draft PR for feature {NNN}. Opened automatically at plan stage."
If gh is unavailable, skip silently (graceful degradation). Store the PR number for later use.
- Derive specs directory:
specs/{NNN}-*/
- If no specs directory found, check
.aod/spec.md as fallback
- If no feature context found: warn and suggest
/aod.define first
Step 2: Read Artifact States
For each artifact (spec.md, plan.md, tasks.md), determine its approval status:
- Check file existence — if file cannot be read (missing, permissions, encoding), treat as "does not exist"
- Parse YAML frontmatter — extract the
triad: block between --- delimiters
- Extract sign-off status — read
triad.{role}_signoff.status for the required reviewers
Step 3: Evaluate Frontmatter (with error handling)
For each artifact file, apply these rules in order:
- File does not exist → status =
missing
- File exists but has no
--- frontmatter delimiters → status = not_approved, emit: "Note: {file} has no frontmatter. Running {sub-step} for review."
- File has frontmatter but no
triad: key → status = not_approved, emit: "Note: {file} frontmatter missing triad block. Running {sub-step} for review."
triad: exists but required sign-off field is null or missing → status = not_approved
- Sign-off status is not a recognized value → status =
not_approved, emit: "Warning: Unexpected status '{value}' in {file}. Re-running {sub-step}."
- YAML parse error → status =
not_approved, emit: "Warning: Could not parse frontmatter in {file}. Re-running {sub-step}."
Recognized approved statuses: APPROVED, APPROVED_WITH_CONCERNS, BLOCKED_OVERRIDDEN
Step 3b: Read Governance Tier
Read .aod/memory/constitution.md and extract the governance tier:
- Look for the
## Governance Tiers section
- Find the configuration block:
governance: → tier: value
- Valid values:
light, standard, full
- If not found or invalid: default to
standard
Tier affects Step 4 decision table — specifically the spec PM sign-off check.
Step 4: Apply Decision Table
Standard and Full tiers (default behavior):
| spec.md exists? | spec PM approved? | plan.md exists? | plan dual-approved? | tasks.md exists? | tasks triple-approved? | Action |
|---|
| No | — | — | — | — | — | Invoke /aod.spec |
| Yes | No | — | — | — | — | Invoke /aod.spec (needs PM sign-off) |
| Yes | Yes | No | — | — | — | Invoke /aod.project-plan |
| Yes | Yes | Yes | No | — | — | Invoke /aod.project-plan (needs dual sign-off) |
| Yes | Yes | Yes | Yes | No | — | Invoke /aod.tasks |
| Yes | Yes | Yes | Yes | Yes | No | Invoke /aod.tasks (needs triple sign-off) |
| Yes | Yes | Yes | Yes | Yes | Yes | Report "Plan stage complete" |
Light tier (reduced gates):
| spec.md exists? | plan.md exists? | plan dual-approved? | tasks.md exists? | tasks triple-approved? | Action |
|---|
| No | — | — | — | — | Invoke /aod.spec |
| Yes | No | — | — | — | Invoke /aod.project-plan (skip PM spec sign-off) |
| Yes | Yes | No | — | — | Invoke /aod.project-plan (needs dual sign-off) |
| Yes | Yes | Yes | No | — | Invoke /aod.tasks |
| Yes | Yes | Yes | Yes | No | Invoke /aod.tasks (needs triple sign-off) |
| Yes | Yes | Yes | Yes | Yes | Report "Plan stage complete" |
In Light tier, when spec.md exists but has no PM sign-off, the router skips the PM spec sign-off check and proceeds directly to /aod.project-plan. Emit: "Note: Light governance tier — PM spec sign-off skipped."
Full tier uses the same table as Standard. The difference between Standard and Full is that Full requires a separate PM spec sign-off step (the PM reviews spec.md independently before plan creation). This distinction is enforced within /aod.spec itself, not in the router.
Approval checks per artifact:
- spec.md (Standard/Full):
triad.pm_signoff.status is approved
- spec.md (Light): existence is sufficient — PM sign-off not required
- plan.md:
triad.pm_signoff.status AND triad.architect_signoff.status are both approved
- tasks.md:
triad.pm_signoff.status AND triad.architect_signoff.status AND triad.techlead_signoff.status are all approved
Invariant: Triple sign-off on tasks.md is the governance floor for ALL tiers, including Light.
Step 5: Execute Orchestration Loop
Based on the decision table, determine the starting sub-step (the first one that needs work). Then run sub-steps in sequence, advancing automatically on approval.
Loop logic:
- Invoke the current sub-step using the Skill tool (
aod.spec, aod.project-plan, or aod.tasks)
- After the sub-step completes, check the governance outcome:
- APPROVED (or APPROVED_WITH_CONCERNS): Display a brief progress line, then re-read artifact states (Step 2) and re-apply the decision table (Step 4) to determine the next sub-step. Continue the loop.
- CHANGES_REQUESTED or BLOCKED: Stop the loop. Display the rejection details and instruct the user to fix the issues, then re-run
/aod.plan to resume.
- If the decision table returns "Plan stage complete": Exit the loop and display:
PLAN STAGE COMPLETE
All artifacts approved:
- spec.md: PM sign-off ✓
- plan.md: PM + Architect sign-off ✓
- tasks.md: PM + Architect + Team-Lead sign-off ✓
Next: Run /aod.build to start implementation.
Progress display between sub-steps:
After each approved sub-step, display a brief status line before advancing:
✓ spec.md — PM approved. Advancing to project-plan...
✓ plan.md — PM + Architect approved. Advancing to tasks...
Important: Re-read artifact states after each sub-step. Do NOT assume the next sub-step — the decision table handles edge cases (e.g., plan.md exists but lost dual approval).
Edge Cases
No PRD exists
If the user runs /aod.plan but there is no approved PRD for the current feature (no docs/product/02_PRD/{NNN}-*.md), warn:
No approved PRD found for this feature.
The Plan stage requires a PRD as input. Run /aod.define first to create one,
then return to /aod.plan.
Direct sub-command invocation
The orchestrator does NOT block direct invocation of /aod.spec, /aod.project-plan, or /aod.tasks. Those commands work independently — the orchestrator is a convenience layer, not a gatekeeper.
Re-run after rejection
If a governance gate rejects (e.g., PM requests changes to spec.md), the user fixes issues and re-runs /aod.plan. The orchestrator detects the missing/rejected sign-off and re-invokes the correct sub-step, then continues the loop from there.
Mid-stage resume
If the user previously completed spec.md and plan.md (both approved) and runs /aod.plan, the orchestrator skips directly to /aod.tasks — it only runs what's needed.
Integration
Reads
specs/{NNN}-*/spec.md — check existence and PM sign-off
specs/{NNN}-*/plan.md — check existence and dual sign-off
specs/{NNN}-*/tasks.md — check existence and triple sign-off
docs/product/02_PRD/{NNN}-*.md — check PRD existence (edge case)
Invokes (in sequence, advancing on approval)
/aod.spec — when spec needs creation or PM approval
/aod.project-plan — when plan needs creation or dual approval
/aod.tasks — when tasks need creation or triple approval
Updates
- None (orchestrator reads artifact state, sub-commands write artifacts)
Common Rationalizations
| Rationalization | Reality |
|---|
| "I know what's done, I'll skip re-reading state between sub-steps" | Step 5 Loop point 3 mandates re-read after each sub-step — assumed-state advancement misses lost approvals. |
| "This branch is small, I'll commit straight to main" | Step 1 point 2 auto-creates the feature branch on main — bypassing it skips the draft PR opened in point 3. |
| "spec.md exists, the gate must already be green" | Step 4 decision table requires pm_signoff.status approved per Step 2 — existence alone routes back to /aod.spec. |
| "Light tier means skip triple sign-off on tasks too" | Step 4 invariant (line 100) keeps tasks.md triple sign-off as the floor for ALL tiers, including Light. |
| "Approved with concerns is close enough — I'll fix later" | Step 4 recognized list (line 52) treats it as approved, but the concerns must still be addressed before delivery. |
Red Flags
- Agent advances past an approved sub-step without re-running Step 4's decision table.
- Agent invokes
/aod.tasks directly when plan.md lacks dual sign-off per the Step 4 plan row.
- Agent skips the draft PR open in Step 1 point 3 because
gh "felt slow."
- Agent treats a missing
triad: block as approved instead of not_approved per Step 3 rule 3.
- Agent reports "Plan stage complete" without all three artifacts hitting the Step 4 final row.
- Agent ignores the Light-tier note in Step 4 and re-runs
/aod.spec for a PM sign-off the tier doesn't require.