| description | Generate a release timeline for the /spec spine and make it viewable as a GitHub Projects v2 roadmap — turn intended-but-unshipped work into GitHub issues grouped under release milestones with due dates. A thin orchestrator over /steer:issues, /steer:audit spec, and /steer:tracker-sync; the issue + /spec stay canonical, the Project is a derived view, and it never fabricates dates. |
| when_to_use | Use to lay out where the product is going on a timeline — when asked for a roadmap, a release plan, or a Projects v2 timeline, or to turn target features or a spec-vs-implemented gap into milestone-grouped GitHub issues. |
| argument-hint | [from-features | from-gap | sync] |
Generate a release-milestone roadmap for the /spec spine
/steer:roadmap turns intended-but-unshipped work into GitHub issues grouped
under release Milestones, so an existing GitHub Projects v2 roadmap/timeline
view can lay the work out by milestone. It is a thin orchestrator above
/steer:issues and /steer:audit spec — it sequences the timeline; it does not own
domain reasoning and never touches the GitHub API directly. Two invariants from
the issue-workflow reference hold throughout:
/spec is durable product truth; GitHub Issues is the work/decision layer; a
Project is a derived view/overlay (the compatibility boundary in
${CLAUDE_PLUGIN_ROOT}/templates/reference/ISSUE-SCHEMA.md).
- All reads/writes go through
/steer:tracker-sync (MCP-first → gh → manual
floor); this skill never calls the GitHub API directly.
It writes only native issue attributes the Projects-v2 boundary already
sanctions — Milestone, parent/sub-issue links, labels, Type. Priority, Effort,
and Start/Target date are native issue fields (ISSUE-SCHEMA.md), not
Project-item fields — Priority is escalate-only auto-set by /steer:issues triage,
and this skill writes the Start/Target date fields onto issues (human-confirmed)
so a Projects v2 roadmap lays out per-issue Gantt bars with no Project-item
mirroring; only Status, Iteration, and Size remain Project-item-only and out of
scope here. It never fabricates a date: dates come from the human at
confirmation.
First, every run
- Read
/spec/tracker.md. Confirm system: github. On a non-GitHub tracker,
say so and stop — there is no GitHub roadmap path; the manual flows in
/steer:tracker-sync apply. Never fabricate tracker state.
- Locate the spine. If there is no
/spec, redirect to /steer:init
(greenfield) or /steer:adopt (existing code) and stop — there is no work-set
to lay out yet.
- Detect capability via
/steer:tracker-sync (MCP vs gh vs manual) and say
which path you took, so the user knows whether issues/milestones were touched.
Modes
A no-argument run is a read-only preview: resolve the work-set, propose the
milestone plan (below), and stop without writing.
from-features — target features → timeline (forward planning)
The work-set is every spec/features/*/intent.md whose > Status: is not yet
live (draft | approved | implemented | validated). For each feature:
- Find-or-create a feature-level issue via
/steer:issues materialize /
/steer:tracker-sync find-or-create (idempotent on feature-id+kind — a match
updates, never a second issue). Write the ref into the intent's > Tracker: line.
- Fan out implementation sub-issues only where allowed — call
/steer:issues decompose for a feature only when it already meets decompose's
precondition (intent approved and contract readiness ready, the
derivation in SPEC-FRAMEWORK.md). A feature below that bar appears on the
roadmap as its single feature issue, not yet decomposed — never force it past the
gate just to populate the timeline.
from-gap — spec-vs-implemented gap → timeline (the backlog you must still build)
Run /steer:audit spec (read-only) to diff the as-built /spec against the intended
spec, then take only the expected-unbuilt units — 🔴 Missing / 🟠 Partial
whose tracker status is Backlog/To-Do, the "unbuilt roadmap" bucket /steer:audit spec
already separates from Done-but-Missing defects. Do not put Done-but-Missing
or Diverged findings on the roadmap — those are drift to resolve via
/steer:issues publish-drift, not planned work. File the expected-unbuilt units the
same way from-features does — find-or-create via /steer:issues materialize /
/steer:tracker-sync find-or-create (idempotent on feature-id+kind; a match
updates, never a duplicate). These are planned backlog, so they are not
spec-drift-labelled — that label is reserved for actual drift (Diverged /
Done-but-Missing), per /steer:audit and /steer:tracker-sync push.
sync — reconcile the plan with reality (idempotent re-run)
Re-resolve the work-set, verify its issues still exist and their milestone grouping
still matches the spine, and report every disagreement (issue gone, feature now
live but still milestoned as pending, milestone/date changed in the UI). Confirm
once before correcting. Create-or-leave: never overwrite a milestone title or
due date a human edited on GitHub — the human is canonical for the when.
Propose the release plan (human-gated, no fabricated dates)
After resolving the work-set in any writing mode:
- Group the work-set into release milestones, ordered to respect
depends-on/blocks links recorded under issues' Related issues headings —
an item may not land in a milestone earlier than something it depends on.
Surface any dependency cycle or conflicts-with for a human; never
auto-resolve it.
- Propose milestone titles + due dates as a structure only. The skill chooses
neither the dates nor the priority order beyond dependency constraints — those
are human planning calls. Ask the human to supply or confirm each milestone
title and due date.
- Take one confirmation for the whole plan, then materialize via
/steer:tracker-sync:
milestone-ensure <title> [--due <date>] — create each confirmed
milestone if missing (it is confirmation-gated and never invents a date).
set-milestone #N <title> — attach each work-set issue to its milestone.
field-set #N "Target date" <date> (and "Start date" when the human
gave one) — write the human-confirmed dates to the native date issue
fields, so a Projects v2 roadmap can lay out per-issue Gantt bars without any
Project-item mirroring. Use the same dates the human just confirmed — never
fabricate one. Capability-degrades: if issue fields are unavailable, skip the
date fields and rely on the Milestone grouping alone (say so).
- Report the milestone set, the issue refs under each, and the org Project
roadmap URL if
/spec/tracker.md records one. Note that the Projects v2 timeline
axis (group/lay-out by Milestone) is a one-time view setup in the GitHub UI —
this skill produces the milestoned issues the view renders; it does not create
or configure the Project (no per-repo board automation).
Guardrails
- Orchestrate, don't duplicate. Delegate to the owning skill; never restate its
prose. All GitHub I/O goes through
/steer:tracker-sync.
- Idempotent. Find before create (
feature-id+kind / finding-key); a match
is an update. Re-running a mode must not double-file issues or milestones.
- Native attributes only. Writes are Milestone, links, labels, Type, and the
native Start/Target date issue fields — never a Project-item planning field
(Status/Iteration/Size), never mirrored into an issue body.
- Milestone = release, not epic. An epic (a
kind=epic parent grouping features
by goal) is an orthogonal axis to the release Milestone (when work ships). This
skill groups by Milestone exactly as above; it may display epic membership but
never repurposes the Milestone as the epic aggregator — epic grouping is owned
by /steer:issues epic.
- No fabricated planning data. Never invent a date, priority, or effort. Dates
are human-supplied; ordering follows declared dependencies only.
- Authorization & confirmation. Reads (preview) never confirm. The full plan
takes one confirmation before any milestone/issue write; an explicit
per-feature/per-finding request follows the intent rules in
ISSUE-WORKFLOW.md.
This skill restates none of that authority model.
- No code, no spec rewrites beyond pointers. The only spec edit is an intent's
> Tracker: line (via the delegated skills). It never edits /apps, /packages,
or contract.md behavior, and never resolves drift or a product decision.
Recommended next actions
After any mode, emit a ## Recommended next actions block per
${CLAUDE_PLUGIN_ROOT}/templates/reference/NEXT-ACTIONS.md, scoped to this run
(locality rule), recommending the next valid step and delegating it to its owner.
When the user is the PO — see rule 05 (Who you are working with) — render this
readout in plain product language (no safety-level codes, no milestone/ADR/CI
jargon); keep the technical detail for devs.
| Observed state | Category | Action / suggested command |
|---|
Dependency cycle / conflicts-with among work-set items | Human decision required | Resolve the ordering (no command) |
| Milestone plan proposed, awaiting dates/approval | Human decision required | PO/dev confirm titles + due dates (no command) |
| Plan confirmed; issues not yet milestoned | Recommended | Materialize — /steer:roadmap from-features / from-gap |
ready-for-dev issue on the next milestone | Recommended | Start it — /steer:work start #N |
Feature now live but still milestoned as pending | Recommended | Reconcile — /steer:roadmap sync |
| Done-but-Missing / Diverged drift surfaced | Required before next production release | File it — /steer:issues publish-drift |
| Roadmap current, nothing queued | Complete | No action is currently required. |
Pick one Current recommended action by precedence. Read-only in preview; in a
writing mode it recommends the next transition, it does not perform unapproved
writes.
Coupling rules
The Projects-v2 compatibility boundary and issue format are canonical in
ISSUE-SCHEMA.md; lifecycle/state/authority in ISSUE-WORKFLOW.md; the spec-gap
verdict model in /steer:audit spec; contract readiness + the open-question contract in
SPEC-FRAMEWORK.md; milestone conventions in /spec/tracker.md and rule
35-issue-tracker. GitHub I/O is /steer:tracker-sync's job. This skill only
sequences those into a release timeline.