| name | work-on |
| description | skill to "execute a task", "work on task N", or "implement TASK-NNN" - orchestrates worktree isolation, TDD implementation, validation, and merge. |
| requires | plan-task, implement-task, validate |
| argument-hint | [task-number] |
Execute Task Skill
Thin orchestrator that delegates to plan-task, implement-task, and validate skills for the three phases of task execution.
Token Discipline
This skill orchestrates long multi-agent workflows. Every turn re-reads the full context window, so unnecessary turns are expensive.
- No narration turns. Do not output text-only turns like "Let me load the task" or "Now I'll launch the plan agent." Combine text with a tool call in the same turn, or skip the text entirely.
- Batch tool calls. When multiple tool calls are independent, issue them all in one turn.
- No waiting updates. Do not output "Waiting for results..." turns. Wait silently until results arrive.
- Keep context lean. Do not read file contents you won't use directly. Pass file paths to subagents and let them read in their own context windows.
Pre-flight: Model Recommendation
Your current effort level is {{effort_level}}.
Skip this step silently if effort is high, xhigh, or max (the scale is low < medium < high < xhigh < max, so xhigh and max are already above high) AND you are Sonnet or Opus.
If effort is low or medium (i.e. below high), you MUST show the recommendation prompt — regardless of model.
If you are not Sonnet or Opus, you MUST show the recommendation prompt — regardless of effort level.
Otherwise → use AskUserQuestion:
{
"questions": [{
"question": "Task execution benefits from consistent multi-domain reasoning.\n\nRecommended: Sonnet or Opus at high effort.\n\nTo switch: cancel, run `/effort high` (and `/model sonnet` if on Haiku), then re-invoke.",
"header": "Effort check",
"options": [
{ "label": "Continue anyway" },
{ "label": "Cancel — I'll switch first" }
],
"multiSelect": false
}]
}
If the user selects "Cancel — I'll switch first": output the switching commands and stop. Do not proceed with the skill.
Plan Mode Handling
-
Execute Steps 0-2 below as normal (they are read-only — planning produces a plan file).
-
After Step 2 produces the plan file, write the plan mode output:
## Task: [TASK-NNN] [Title]
### Execution Context
**Working Directory:** .worktrees/TASK-NNN
**Branch:** task/TASK-NNN
**Base Branch:** [current branch]
## Implementation Plan
**IMPORTANT: DO NOT just execute the plan below.** Re-invoke `groundwork:work-on` which will use the saved plan. Set:
- `GROUNDWORK_EXECUTE_SKIP_TO_STEP_SEVEN=true`
- `GROUNDWORK_EXECUTE_PLAN_FILE=<absolute path to plan file>`
Then invoke `groundwork:work-on` with the same task ID.
-
Call ExitPlanMode()
Step 0: Resolve Context
-
Check skip flag: If session context contains GROUNDWORK_EXECUTE_SKIP_TO_STEP_SEVEN=true, set plan_file_path = $GROUNDWORK_EXECUTE_PLAN_FILE and skip directly to Step 3 (Implementation). Do NOT read the plan file's contents into this orchestrator's context — the implement-task skill will pass the path to the executor agent.
-
Monorepo check: Does .groundwork.yml exist at the repo root?
- If yes → Is
{{project_name}} non-empty?
- If empty → Invoke
Skill(skill="groundwork:select-project") to select a project, then restart this skill.
- If set → Project is
{{project_name}}, specs at {{specs_dir}}/.
- If no → Continue (single-project repo).
-
CWD mismatch check (monorepo only):
- Skip if not in monorepo mode or if the project was just selected above.
- If CWD is the repo root → fine, proceed.
- Check which project's path CWD falls inside (compare against all projects in
.groundwork.yml).
- If CWD is inside the selected project's path → fine, proceed.
- If CWD is inside a different project's path → warn via
AskUserQuestion:
"You're working from <cwd> (inside [cwd-project]), but the selected Groundwork project is [selected-project] ([selected-project-path]/). What would you like to do?"
- "Switch to [cwd-project]"
- "Stay with [selected-project]"
If the user switches, invoke
Skill(skill="groundwork:select-project").
- If CWD doesn't match any project → proceed without warning (shared directory).
Step 1: Parse Task Identifier
Parse the task identifier from the argument:
- Numeric (e.g.,
4): Interpret as TASK-004 (zero-padded to 3 digits)
- Full format (e.g.,
TASK-004): Use as-is
- No argument: Run
/groundwork:work-on-next-task to determine the next workable task, then use that ID. If it returns nothing workable, report and stop.
Error: Invalid format → "Please specify a task number, e.g. /groundwork:work-on 4 or /groundwork:work-on TASK-004"
Batch Mode Detection
If session context contains GROUNDWORK_BATCH_MODE=true, batch mode is active. In batch mode:
- All
AskUserQuestion calls are skipped
- On completion or failure, output a structured result line (Step 7)
Step 2: Plan → plan-task
Call Skill(skill="groundwork:plan-task") with the task ID from Step 1 in the conversation context.
Parse the output:
RESULT: PLANNED | plan_file_path=<path> | identifier=<id> | branch_prefix=<prefix> → Save plan_file_path, identifier, branch_prefix, then continue to Step 2.5 in this same turn.
RESULT: FAILURE | ... → Report failure. In batch mode output RESULT: FAILURE | [TASK-NNN] <reason> and stop. In interactive mode, report the failure and stop.
Do NOT stop after planning. Planning is only the first of three phases in work-on. The "DO NOT proceed past this step" note inside plan-task applies to plan-task itself, not to this orchestrator — when control returns here with RESULT: PLANNED, you are NOT done. Never end your turn on a bare plan summary; the very next action after a successful plan is the Step 2.5 question.
Step 2.5: Confirm Start (Interactive Only)
Batch mode (GROUNDWORK_BATCH_MODE=true): Skip to Step 3.
Interactive mode: This question is mandatory — if you reached here with a plan, you must ask it rather than stopping. Use AskUserQuestion:
"[TASK-NNN] [Title] — plan ready. Proceed to implementation?"
- Option 1: "Yes, begin implementation"
- Option 2: "Stop here — I'll review the plan first"
If "Stop here": Print the plan file path and resume instructions, then STOP:
Plan saved to: <plan_file_path>
To resume implementation later:
/groundwork:implement-task <task-number>
Step 3: Implement → implement-task
Call Skill(skill="groundwork:implement-task") with task_id and plan_file_path in the conversation context.
Parse the output:
RESULT: IMPLEMENTED | worktree_path=<path> | branch=<branch> | base_branch=<bb> → Save values. Proceed.
RESULT: FAILURE | ... → Report failure. In batch mode output RESULT: FAILURE | [TASK-NNN] <reason> and stop. In interactive mode, report and stop.
Step 3.5: Optional Context Clear Pause (Interactive Only)
Skip this step entirely if GROUNDWORK_BATCH_MODE=true — proceed directly to Step 4.
In interactive mode, the orchestrator's context now holds the plan summary and the executor result. Validation runs 9 reviewer agents and may iterate through a fix loop, which compounds context further. Offer the user a chance to stop here so they can clear context before validation begins.
Use AskUserQuestion to ask:
"Implementation complete for [TASK-NNN]. Validation runs 9 reviewer agents next and can compound context. Clear context before validation?"
- Option 1: "Continue to validation now"
- Option 2: "Stop here — I'll clear and resume manually"
If "Continue to validation now": Proceed to Step 4.
If "Stop here": Print the resume instructions below and STOP. Do NOT call validate. Do NOT proceed to Steps 4, 5, 6, or 7.
## Paused before validation
Implementation is committed in:
- **Worktree:** `<worktree_path>`
- **Branch:** `<branch>`
- **Base branch:** `<base_branch>`
To resume validation in a clean context:
1. Run `/clear` to clear Claude Code context
2. `cd <worktree_path>`
3. Run `/groundwork:validate`
After validation passes, merge manually from the project root:
cd <project_root>
git checkout <base_branch>
git merge --no-ff <branch>
git worktree remove <worktree_path>
git branch -d <branch>
Then mark **TASK-NNN** as `Complete` in the tasks file.
This is a hard stop. The user explicitly chose to take over the rest of the workflow.
Step 4: Validate
Call the validate skill directly. Do NOT wrap this in a subagent — this skill runs in the main conversation, which CAN spawn the 9 validation subagents it needs.
cd into the worktree path from Step 3
- Call:
Skill(skill="groundwork:validate")
- The validate skill will run 9 verification agents in parallel and fix issues autonomously.
After validate completes:
- All agents approved → Proceed to Step 5
- Validation failed → Report failure; in batch mode output
RESULT: FAILURE | [TASK-NNN] Validation failed: ... and stop
- Stuck on recurring issue → Report the stuck finding and stop
Step 5: Merge
From the project root (NOT the worktree), handle merge:
Determine merge action:
| Condition | Behavior |
|---|
GROUNDWORK_BATCH_MODE=true | Auto-merge immediately |
GROUNDWORK_AUTO_MERGE env var is true | Auto-merge immediately |
| Otherwise | Prompt user for decision |
If prompting user:
Use AskUserQuestion to ask:
"Implementation and validation complete for [TASK-NNN]. Would you like me to merge this into [base-branch] now?"
- Option 1: "Yes, merge now"
- Option 2: "No, I'll merge manually later"
Wait for user response before proceeding.
If merging:
- Ensure you are in the project root (cd out of worktree if needed)
- Checkout base branch:
git checkout <base-branch>
- Merge:
git merge --no-ff <branch> -m "Merge <branch>: [Task Title]"
- If success: Remove worktree and delete branch:
git worktree remove .worktrees/TASK-NNN
git branch -d <branch>
- If conflicts: Report conflicts and keep worktree for manual resolution
If not merging or conflicts occurred:
Report worktree location and manual merge instructions:
## Implementation Complete in Worktree
**Location:** .worktrees/TASK-NNN
**Branch:** task/TASK-NNN
When ready to merge:
```bash
git checkout [base-branch]
git merge --no-ff <branch>
git worktree remove .worktrees/TASK-NNN
git branch -d <branch>
To continue working:
cd .worktrees/TASK-NNN
## Step 6: Complete Task
After successful merge or user acknowledgment:
1. **Update status** — Change task file to `**Status:** Complete` and update the status table in `{{specs_dir}}/tasks/_index.md` or `{{specs_dir}}/tasks.md` (change the task's row to `Complete`)
## Step 7: Report
**Batch mode (GROUNDWORK_BATCH_MODE=true):** Output the structured result as your final line:
RESULT: SUCCESS | [TASK-NNN] [Task Title] - [one-line summary of what was done]
If the task failed at any step, output:
RESULT: FAILURE | [TASK-NNN] [reason for failure]
**Interactive mode:** Output exactly one line:
Done: [TASK-NNN] merged → . Validation passed in N iter(s).
If the merge did not happen, replace `merged → <base>` with `pending at <worktree_path>`.
---
## Reference
### Task Status Values
- `**Status:** Not Started`
- `**Status:** In Progress`
- `**Status:** Complete`
- `**Status:** Blocked`
### Dependency Handling
Task is blocked if `Blocked by:` lists any task not Complete.
### Final Checklist
Before marking complete, verify ALL:
- [ ] Working in worktree (`.worktrees/TASK-NNN`)
- [ ] Plan agent was used (not your own plan)
- [ ] TDD was followed
- [ ] All acceptance criteria verified
- [ ] validate returned PASS (via direct Skill call)
- [ ] All validation fixes were applied by the validation-fixer subagent — zero `Edit`/`Write`/`NotebookEdit` calls and zero file-mutating `Bash` calls (`sed -i`, `awk -i`, `tee`, `>`, `>>`, etc.) by this orchestrator during the validation phase. If you fixed anything yourself instead of dispatching to validation-fixer, that is a violation of the validate hard rule and the task is NOT complete.
- [ ] Merge completed or user acknowledged worktree location
If any unchecked: task is NOT complete.