| description | Repository-specific multi-agent coordination workflow for Graft. Use when the user explicitly wants subagent delegation, or when the current task cleanly splits into two or more disjoint slices across server, web, docs, or automation, and the main agent should keep ownership of review, validation, and final integration. `graft-boot` should assess whether this skill is justified before delegation starts. |
Graft Multi-Agent Batch
Use this skill when Graft work benefits from bounded parallel subagents.
Treat AGENTS.md as the source of truth. This skill expands the repository's subagent workflow; it does not replace it.
The main agent coordinates the batch wave. Delegated worker subagents keep implementation ownership for their
bounded slices until they emit a final closeout, return an explicit blocked state, report an owned-scope conflict, or
exhaust the retry policy.
Execution Hierarchy
A batch is one execution wave only. It is not a topic lifecycle controller and does not determine whether the caller's
conversation, topic, or loop is complete.
When this skill runs inside graft-multi-agent-loop, the hierarchy is:
topic loop
-> batch wave
-> worker execution
Control returns upward only: worker -> batch coordinator -> outer loop controller. Batch completion returns control
to the outer controller; it never completes or suspends the topic loop. The batch coordinator cannot mutate outer loop
state, choose the next loop batch, resume the current loop batch, dispatch a repaired worker, or terminate the outer
loop. A worker closeout cannot override loop state.
Waiting Terms
Use these terms consistently when deciding whether to wait, checkpoint, retry, or stop a delegated worker:
no visible diff yet
- the main worktree does not yet show a relevant repo-tracked diff in the worker's owned scope
no final closeout yet
- the worker has not yet emitted the required bounded-slice final closeout
no new visible output evidence
- there is no new checkpoint reply, validation output, changed-file report, or other observable progress signal in
the currently exposed tool surface
stronger stalled signals
- evidence materially stronger than the three states above, such as explicit
blocked, can_continue=false,
owned-scope conflict, unsafe worktree, contradictory closeout, retry exhaustion, or repeated prolonged silence
after checkpoint-based health checks
The first three terms are observation states, not stop conditions. A worker is not stalled merely because the main
agent currently sees no visible diff yet, no final closeout yet, or one quiet wait window.
Use When
Use this skill only when all of the following are true:
- the task is large enough that parallel work materially shortens it
- the write sets can stay disjoint
- the current execution owner can keep its immediate blocking step local
- reviewability will still be acceptable after integration
Coordination Workflow
- Run the normal
graft-boot grounding flow first and establish the startup receipt required by AGENTS.md.
- Treat
graft-boot's multi-agent suitability check as the activation gate; do not delegate just because parallelism is available.
- Identify the immediate blocking step and keep it local to the current execution owner.
- when this batch runs inside one
graft-multi-agent-loop round, the current execution owner is the delegated
worker subagent, not the outer loop orchestrator
- return the completed wave and its evidence to that outer controller; do not present the wave as a topic or loop
terminal state
- when the batch is spawned from
$graft-pr-review, keep the exhaustive finding inventory local to the main agent
before delegation; Outside diff range comments, Nitpick comments, and other folded latest-review sections are
mandatory inventory scope and must not be dropped from the dispatch set
- Split only non-blocking work into disjoint slices.
- when this batch runs inside one
graft-multi-agent-loop round, default sidecars to read-only explorer
subagents; add write-capable worker sidecars only when the round remains reviewable and the current worker still
owns final integration, validation, and closeout
- in a PR-review remediation batch, dispatch owned fixes only after every finding has a concrete row in the
inventory; do not delegate only the “high priority” subset while leaving outside-diff or folded-section findings
implicit
- Use
explorer subagents for read-only discovery or comparison.
- Use
worker subagents only for bounded implementation slices with explicit ownership.
- For every subagent, specify:
- governance source
- task class
- recovery source
- objective
- owned files or subsystem
- areas it must not touch
- required validation
- expected output format
- commit authority and expected commit path for write-capable slices
- verified worker model configuration when an override is required
- when using the orchestration API, pass
fork_context=false with explicit model and
reasoning_effort overrides; fork_context=true inherits the parent model and reasoning effort and must not
be combined with either override
parent_model, worker_model, verified model_relation (same or lower), and comparison evidence; a worker
model may never be higher than the model of the agent dispatching it
- if the worker model is higher or the relation cannot be verified, pause dispatch and request explicit user
approval or direction; do not infer model rank from names, availability, or reasoning effort
- Once a write-capable slice is delegated, keep implementation ownership with that same
worker:
- do not reclaim the slice locally just because one wait window elapsed
- do not treat
no visible diff yet as evidence of stall by itself
- do not silently continue the worker's bounded slice in the main agent after a checkpoint reply
- do not close, replace, or locally take over the worker only because the main worktree still shows no diff and the
worker has not emitted final closeout yet
- after required validation passes, let the owning worker evaluate and perform a scoped
graft-commit when commit
authority is explicit and ownership is provable; comment-governance workers must follow the comment skill's commit
gate and return commit evidence or an explicit blocked result
- stage only explicitly owned files or hunks, including a declared worker-owned
SKILL.md when applicable; exclude unrelated topic changes, unrelated skill changes, other-worker changes, and unknown changes
- While subagents run, do only non-overlapping work locally:
- review returned slices
- prepare follow-up validation
- refine the next safe slice
- Treat
timeout != stalled for active worker slices:
- exceeding one wait window is not enough to declare a worker stalled
- absence of visible repo-tracked changes is not, by itself, evidence of no progress
- before judging stall, distinguish
no final closeout yet, no visible diff yet, no new visible output evidence,
and closeout not started
- if observable changes in the worker's owned scope are gradually increasing, treat the worker as progressing and
continue waiting instead of interrupting
- if the current tool surface does not expose direct activity, do not rewrite that into
no activity
- one wait timeout, without stronger stalled signals, is not enough to close, retry, replace, or locally take over
the worker slice
- Use bounded checkpoint requests instead of ad-hoc remote control:
- default
checkpoint_budget=1 per active worker unless the batch budget explicitly raises it
- checkpoint is a health check only; it is not a closeout, not a stop signal, and not permission for the main
agent to finish the slice locally
- the checkpoint precondition is narrow: use checkpoint only when all of the following are true:
- the worker still has
no final closeout yet
- the main worktree still has
no visible diff yet or otherwise lacks new visible output evidence for that owned
scope
- there is currently no stronger stalled evidence proving the worker is truly blocked or unsafe
- use checkpoint as a health check for possible
blocked, architecture decision required, unsafe worktree,
validation failure, or a long quiet window after the active wait window expires
- checkpoint requests must not change the task goal, broaden scope, or append implementation requirements
- do not checkpoint, stop, or retry only because a final closeout is missing while owned-scope changes are still
increasing
- if the only evidence is
no visible diff yet plus no final closeout yet, checkpoint may be used only for
health-checking; that state alone must not trigger stop, retry, replacement, or local takeover
- enforce cooldown before another interrupt against the same worker
- a checkpoint response is not a closeout and must not be interpreted as permission for the main agent to finish the slice
- Use the default wait ladder unless the user or task prompt sets a stronger explicit bound:
- initial wait window:
15 minutes
- if the first wait window expires and the checkpoint precondition above is met, send one checkpoint request
- if that checkpoint returns
can_continue=true, continue the same worker and wait a second window of at least 30
minutes
- if the second window expires without final closeout, checkpoint again instead of closing or replacing the worker
- after the second checkpoint, keep waiting using the worker ETA when credible, or a doubled prior window when ETA
is weak, until the worker reaches final closeout or a real terminal condition applies
- terminal conditions for ending the current worker are limited to: final closeout, explicit
blocked,
owned-scope conflict, unsafe worktree, or retry policy actually triggering after the health-check process
- After a usable checkpoint with
can_continue=true, continue the same worker slice:
- wait at least one post-checkpoint grace window sized from ETA or the batch default wait rule
- if the worker was closed by interrupt handling, reopen it and resume the same goal, scope, and budget
- if the worker later returns a valid final closeout, accept that closeout as the slice result
- If a worker slice cannot produce a usable final closeout:
- retry the same bounded slice once with a fresh worker
- pass the retry worker the previous failure reason, partial owned-scope diff, and relevant validation evidence
- if the second worker still fails, return retry-exhaustion as wave evidence to the caller with its
required_context and recovery_requirements (including the failed round, evidence, repair authority, and safe
retry inputs); the caller may use it as recovery input, but it is not a topic stop or terminal decision
- do not recover the implementation locally and do not silently continue outside the declared batch contract
- Stop the wave when ownership boundaries start to overlap, validation changes strategy, or the batch becomes harder to review than to implement locally.
Acceptance Rules
Before accepting a subagent result, confirm:
- the subagent received the inherited startup context instead of only an objective
- the subagent stayed inside its ownership boundary
- the dispatched model was verified as the same level or lower than the immediate parent, or the user approval for a
higher-level exception was explicitly recorded
- the reported validation is enough for that slice
- the result still follows plugin, DI, and
menu + route + page + api + permission boundaries
- any checkpoint response was treated as a health report, not a handoff or implicit stop signal
- any retry-exhausted slice was reported as wave evidence or recovery input rather than being completed locally by the
main agent or interpreted as a loop stop; only the outer controller may resolve it to a terminal state
- when nested in
graft-multi-agent-loop, the wave returned evidence upward without asserting topic completion or
changing outer controller state
Output Expectations
For every delegated worker, require one of these response shapes:
- Final closeout for the bounded slice:
round_status: complete, blocked, retry-needed, or owned-scope-conflict
implementation_result
changed_scope
commit
validation_evidence
risks
blockers
required_context when retry, repair, or scope recovery needs prior evidence
- optional
recovery_requirements, which describe recovery evidence for the caller and never suspend or transition
the topic
parent_model, worker_model, model_relation, model_rank_verified, and higher_model_approval
- optional
suggested_follow_up, which is advisory evidence for the caller and never a controller decision
- do not emit or infer
continue, pending_batches, next_batch, archive_ready, topic_complete,
stop_loop, suspend_topic, or wait_for_user
- Checkpoint status for a still-running slice:
- begin with
Checkpoint status:
- include
current_phase, changed_files, last_validation, next_action, can_continue,
estimated_remaining_minutes, eta_confidence, and risks_or_blockers
- do not include
Next-session startup prompt:
- do not present the checkpoint as final closeout
Boundaries
- do not use this skill as a substitute for
graft-boot
- do not delegate overlapping write scopes
- do not let checkpoint interrupts turn the batch into real-time remote control of workers
- do not let an active delegated slice silently downgrade into untracked main-agent execution
- do not treat batch completion, worker success, commit success, or validation success as topic completion
- do not treat batch failure, retry exhaustion, wave stop, scope conflict, or a recovery receipt as permission to
suspend or terminate the topic; return evidence to the outer controller
- do not assume a subagent can inherit unstated governance; pass the inherited startup context explicitly
- do not use batch delegation to bypass
$graft-pr-review inventory closure; Outside diff range comments,
Nitpick comments, and other folded latest-review findings remain mandatory dispositions even when repairs are split
across workers
- after changing this skill or the related loop/task worker contract, manually run
python3 scripts/validate_loop_controller_contract.py; it is not a normal repository completion gate