建築執照申請文件
⚠️ UNVERIFIED — DO NOT QUOTE NUMBERS AS FACT. The numeric values in this file (fees, penalties, deadlines, thresholds) were drafted from general knowledge and have not been verified clause-by-clause against current Taiwan regulations. Before citing any figure: (1) verify the current provision via MCP taiwan-building-code_search_building_code or the Laws & Regulations Database (law.moj.gov.tw); (2) never output a penalty or threshold amount without its governing article number. Methodology: see raw/建築顧問方法論/不確定性標示與來源管控/uncertainty-and-source-control/SKILL.md.
Overview
This skill provides comprehensive information about the standard building permit application documents required in Taiwan. It covers document types, formatting requirements, submission guidelines, and template specifications.
Technical Specifications
Document Types
- Site plan and layout drawings
- Architectural drawings (floor plans, elevations, sections)
- Structural calculations and engineering reports
- Mechanical, electrical, and plumbing (MEP) drawings
- Fire safety and life safety system designs
- Accessibility compliance documentation
- Environmental impact assessment reports
- Zoning compliance certificates
Template Requirements
- All drawings must be in A1 or A0 format (scale 1:50 or 1:100)
- Digital submission in PDF format required
- All documents must be signed and sealed by licensed professionals
- Structural calculations must include soil bearing capacity reports
- Fire safety designs must include evacuation paths and emergency lighting plans
Submission Guidelines
- Online submission through municipal building permit portal
- Hard copy submission at local building department
- Required number of document sets: 3 sets (1 original, 2 copies)
- Submission deadline: 10 business days before construction start
- Document review and feedback cycle: 15-20 business days
Integration Points
Taiwan Building Code Search
taiwan-building-code_search_building_code(query="申請文件")
taiwan-building-code_search_building_interpretations(query="文件格式")
PCC Specification Downloads
pcc-downloader_download_specification(chapter="09", keyword="申請文件", format="pdf")
pcc-downloader_download_specification(chapter="09", keyword="設計圖說", format="pdf")