Planning and Task Breakdown
Project structure gate / 文件树结构门禁
只要本工作流将初始化或重组项目,或新建、移动应用、服务、包、模块、页面、API、研究步骤、实验、流水线、测试、文档或多文件产物树,必须先使用 project-structure-architect。
- 开始前:读取适用的
AGENTS.md、PROJECT_STRUCTURE.md、.project-structure.yaml 和现有文件树,锁定项目类型、蓝图及唯一合理路径。
- 运行中:每次新增或移动文件前先判断职责、所有者、复用范围和对应测试;禁止同义目录、根目录堆放、跨层混放及无关重组。
- 阶段收口:纵向切片或阶段完成后检查结构漂移;新项目或重大重组更新结构文档,最终运行结构审计。出现
BLOCK 时停止结构性写入并先修正或询问用户。
纯内容编辑且目标路径已由用户或现有规范唯一确定时,可不重复调用。
Overview
Decompose work into small, verifiable tasks with explicit acceptance criteria. Good task breakdown is the difference between an agent that completes work reliably and one that produces a tangled mess. Every task should be small enough to implement, test, and verify in a single focused session.
When to Use
- You have a spec and need to break it into implementable units
- A task feels too large or vague to start
- Work needs to be parallelized across multiple agents or sessions
- You need to communicate scope to a human
- The implementation order isn't obvious
When NOT to use: Single-file changes with obvious scope, or when the spec already contains well-defined tasks.
The Planning Process
Step 1: Enter Plan Mode
Before writing any code, operate in read-only mode:
- Read the spec and relevant codebase sections
- Identify existing patterns and conventions
- Map dependencies between components
- Note risks and unknowns
Do NOT write code during planning. The output is a plan document, not implementation.
Step 2: Identify the Dependency Graph
Map what depends on what:
Database schema
│
├── API models/types
│ │
│ ├── API endpoints
│ │ │
│ │ └── Frontend API client
│ │ │
│ │ └── UI components
│ │
│ └── Validation logic
│
└── Seed data / migrations
Implementation order follows the dependency graph bottom-up: build foundations first.
Step 3: Slice Vertically
Instead of building all the database, then all the API, then all the UI — build one complete feature path at a time:
Bad (horizontal slicing):
Task 1: Build entire database schema
Task 2: Build all API endpoints
Task 3: Build all UI components
Task 4: Connect everything
Good (vertical slicing):
Task 1: User can create an account (schema + API + UI for registration)
Task 2: User can log in (auth schema + API + UI for login)
Task 3: User can create a task (task schema + API + UI for creation)
Task 4: User can view task list (query + API + UI for list view)
Each vertical slice delivers working, testable functionality.
Step 4: Write Tasks
Each task follows this structure:
## Task [N]: [Short descriptive title]
**Description:** One paragraph explaining what this task accomplishes.
**Acceptance criteria:**
- [ ] [Specific, testable condition]
- [ ] [Specific, testable condition]
**Verification:**
- [ ] Tests pass: `npm test -- --grep "feature-name"`
- [ ] Build succeeds: `npm run build`
- [ ] Manual check: [description of what to verify]
**Dependencies:** [Task numbers this depends on, or "None"]
**Files likely touched:**
- `src/path/to/file.ts`
- `tests/path/to/test.ts`
**Estimated scope:** [Small: 1-2 files | Medium: 3-5 files | Large: 5+ files]
Step 5: Order and Checkpoint
Arrange tasks so that:
- Dependencies are satisfied (build foundation first)
- Each task leaves the system in a working state
- Verification checkpoints occur after every 2-3 tasks
- High-risk tasks are early (fail fast)
Add explicit checkpoints:
## Checkpoint: After Tasks 1-3
- [ ] All tests pass
- [ ] Application builds without errors
- [ ] Core user flow works end-to-end
- [ ] Review with human before proceeding
Task Sizing Guidelines
| Size | Files | Scope | Example |
|---|
| XS | 1 | Single function or config change | Add a validation rule |
| S | 1-2 | One component or endpoint | Add a new API endpoint |
| M | 3-5 | One feature slice | User registration flow |
| L | 5-8 | Multi-component feature | Search with filtering and pagination |
| XL | 8+ | Too large — break it down further | — |
If a task is L or larger, it should be broken into smaller tasks. An agent performs best on S and M tasks.
When to break a task down further:
- It would take more than one focused session (roughly 2+ hours of agent work)
- You cannot describe the acceptance criteria in 3 or fewer bullet points
- It touches two or more independent subsystems (e.g., auth and billing)
- You find yourself writing "and" in the task title (a sign it is two tasks)
Plan Document Template
# Implementation Plan: [Feature/Project Name]
## Overview
[One paragraph summary of what we're building]
## Architecture Decisions
- [Key decision 1 and rationale]
- [Key decision 2 and rationale]
## Task List
### Phase 1: Foundation
- [ ] Task 1: ...
- [ ] Task 2: ...
### Checkpoint: Foundation
- [ ] Tests pass, builds clean
### Phase 2: Core Features
- [ ] Task 3: ...
- [ ] Task 4: ...
### Checkpoint: Core Features
- [ ] End-to-end flow works
### Phase 3: Polish
- [ ] Task 5: ...
- [ ] Task 6: ...
### Checkpoint: Complete
- [ ] All acceptance criteria met
- [ ] Ready for review
## Risks and Mitigations
| Risk | Impact | Mitigation |
|------|--------|------------|
| [Risk] | [High/Med/Low] | [Strategy] |
## Open Questions
- [Question needing human input]
Parallelization Opportunities
When multiple agents or sessions are available:
- Safe to parallelize: Independent feature slices, tests for already-implemented features, documentation
- Must be sequential: Database migrations, shared state changes, dependency chains
- Needs coordination: Features that share an API contract (define the contract first, then parallelize)
Common Rationalizations
| Rationalization | Reality |
|---|
| "I'll figure it out as I go" | That's how you end up with a tangled mess and rework. 10 minutes of planning saves hours. |
| "The tasks are obvious" | Write them down anyway. Explicit tasks surface hidden dependencies and forgotten edge cases. |
| "Planning is overhead" | Planning is the task. Implementation without a plan is just typing. |
| "I can hold it all in my head" | Context windows are finite. Written plans survive session boundaries and compaction. |
Red Flags
- Starting implementation without a written task list
- Tasks that say "implement the feature" without acceptance criteria
- No verification steps in the plan
- All tasks are XL-sized
- No checkpoints between tasks
- Dependency order isn't considered
Verification
Before starting implementation, confirm: