بنقرة واحدة
implement-feature
Coordinate feature delivery with dependency-aware implementation, task-level QA, and final live QA.
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
القائمة
Coordinate feature delivery with dependency-aware implementation, task-level QA, and final live QA.
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
استنادا إلى تصنيف SOC المهني
Execute live manual QA from written cases or an inline repro case, capture verifiable artifacts, and write a structured result report.
Convert a manual QA Markdown result into a standalone HTML evidence report with clickable proof links for JSON, images, and code snippets.
Reproduce a bug locally, trace intent and history, propose the smallest safe fix, then implement and verify the repair.
Turn a technical spec or concrete problem statement into a concrete implementation and test plan formed of small, traceable tasks.
Review PR discussions to identify improvements to agents, templates, or instructions; write a retro report to rnd/retros.
Convert product specs into a repo-grounded technical specification / high-level design.
| name | implement-feature |
| description | Coordinate feature delivery with dependency-aware implementation, task-level QA, and final live QA. |
Coordinate feature delivery with dependency-aware implementation, task-level QA, and final live QA.
{{rnd/agents/implement-feature.md}} {{rnd/agents/shared/command-hygiene.md}}
Drive a feature from tech spec to verified implementation by coordinating build-plan generation when needed, dependency-aware task execution, task-level QA gates, written test cases, and final live QA.
rnd/tech_specs/.../<date>-tech-spec-<feature-id>.md-T<n>-build-plan.md file per taskrnd/test_cases/...AGENTS.md / CLAUDE.md filesrnd/agent_runs/<feature-id>/implement-feature-<timestamp>/dependency-plan.jsonexecution-plan.jsontask-results-*.jsontask-qa-*.jsonqa-result-cycle-*.jsonrun-summary.mdPASS.Before starting any work, create a persistent phase checklist using the environment task tracker or /tmp/implement-feature-<feature-id>-phases.md.
Required checklist:
- [ ] Phase 0: Resolve context (separate context required; no phase skill exists; no distinct agent brief exists)
- [ ] Phase 1: Build-plan assurance (required skill: `create-build-plan`; fallback: `rnd/agents/team-lead.md`)
- [ ] Phase 2: Dependency plan (separate context required; no phase skill exists; no distinct agent brief exists)
- [ ] Phase 3: Execution plan todo (separate context required; no phase skill exists; no distinct agent brief exists)
- [ ] Phase 4: Task execution (required skills: `implement-build-plan` + `run-e2e-tests`; fallbacks: `rnd/agents/developer.md` + `rnd/agents/e2e-engineer.md`)
- [ ] Phase 5: Test cases (required skill: `create-test-cases`; fallback: `rnd/agents/qa-team-lead.md`)
- [ ] Phase 6: Final live QA (required skill: `run-manual-qa-tests`; fallback: `rnd/agents/manual-qa-tester.md`)
- [ ] Phase 7: Fix loop (required skills: `implement-build-plan` + `run-e2e-tests` + `run-manual-qa-tests`; fallbacks: `rnd/agents/developer.md` + `rnd/agents/e2e-engineer.md` + `rnd/agents/manual-qa-tester.md`)
- [ ] Wrap-up: Interaction log written
Rules:
Separate context required. No phase-specific skill exists. No distinct agent brief exists.
AGENTS.md / CLAUDE.md files before scheduling work.When plans are missing:
create-build-planrnd/agents/team-lead.mdWhen plans already exist:
If task build-plan files are missing:
Separate context required. No phase-specific skill exists. No distinct agent brief exists.
Separate context required. No phase-specific skill exists. No distinct agent brief exists.
Create a coordinator todo list with per-task gates:
[ ] Tn implement[ ] Tn task-qa-gateDo not begin dependent work until the corresponding Tn task-qa-gate item is PASS.
Required skills: implement-build-plan for implementation, then run-e2e-tests for the task gate
Fallback teammate briefs: rnd/agents/developer.md, then rnd/agents/e2e-engineer.md
For each dependency-ready task:
Required skill: create-test-cases
Fallback teammate brief: rnd/agents/qa-team-lead.md
If no written test-case file exists:
rnd/test_cases/.Required skill: run-manual-qa-tests
Fallback teammate brief: rnd/agents/manual-qa-tester.md
rnd/manual-qa-results/.Required skill sequence: implement-build-plan -> run-e2e-tests -> run-manual-qa-tests
Fallback teammate briefs: rnd/agents/developer.md -> rnd/agents/e2e-engineer.md -> rnd/agents/manual-qa-tester.md
On task-gate or final live-QA failure:
PASS or a hard blocker is identified.rnd/tech_specs/, rnd/build_plans/, rnd/test_cases/, the current codebase, and repo/app/module-scoped AGENTS.md / CLAUDE.md files.rnd/agent_runs/<feature-id>/implement-feature-<timestamp>/.rnd/manual-qa-results/ for the final live-QA report and artifacts.{{rnd/agents/summary.md}}