Skip to main content
مستودع GitHub

vibe-innovation-lab

يحتوي vibe-innovation-lab على 18 من skills المجمعة من periodicpoint، مع تغطية مهنية على مستوى المستودع وصفحات skill داخل الموقع.

skills مجمعة
18
Stars
9
محدث
2026-04-26
Forks
4
التغطية المهنية
5 فئات مهنية · 100% مصنفة
مستكشف المستودعات

Skills في هذا المستودع

chaos
الفنانون التشكيليون بمن فيهم الرسامون والنحاتون والرسامون التوضيحيون

Run the divergent, psychodelic, chaos protocol. A deliberate cognitive jolt that emits heterogeneous fragments (facts, poetry, multilingual shards, silence, non-sequiturs) to dissolve calcified thought patterns and surface genuinely new associations. Use when divergence has collapsed, the user is stuck, convergent thinking has locked the option space, all ideas sound alike, or the team is going in circles. Trigger phrases include "ich komme nicht weiter", "wir drehen uns im Kreis", "alle Ideen klingen gleich", "I am stuck", "break the pattern", "shake things up", "we need a jolt".

2026-04-26
innovate-phase
متخصصو إدارة المشاريع

Run a specific phase (0 through 5) of the Vibe Innovation Framework. Reads the current ICD, executes the full phase prompt, writes the structured output back to the ICD. Use when the user wants to advance to the next phase, re-run a specific phase, or jump directly into Phase N because their starting TRL maps there. Trigger phrases include "Phase 2 starten", "weiter mit Phase 3", "run phase 1", "ideation phase", "do phase 4 build", "advance to validation".

2026-04-26
innovate
محللو الإدارة

Start the Vibe Innovation Framework. Runs entry diagnostic, session planning, ICD initialization, and phase dispatch from the user's current uncertainty level (TRL -2 to 4). Use when the user wants to begin a new innovation project, has only a vague idea or none at all, asks where to start, needs the framework's entry routing, or wants to resume from an existing ICD. Trigger phrases include "start innovation", "ich habe eine Idee", "wo fange ich an", "let us begin", "neues Projekt", "framework run starten", "I want to ideate".

2026-04-26
innovate-status
متخصصو إدارة المشاريع

Show current innovation project status: TRL, active phase, open assumptions, loop-back budget, and recommended next step. Use when the user wants a quick situational read, asks where the project stands, needs a status report between sessions, or before deciding the next move. Trigger phrases include "status", "wo stehen wir", "was ist offen", "current TRL", "what is next", "Lagebild".

2026-04-26
chaos
محللو أبحاث السوق ومتخصصو التسويق

Run the divergent, psychodelic, chaos protocol. A deliberate cognitive jolt that emits heterogeneous fragments (facts, poetry, multilingual shards, silence, non-sequiturs) to dissolve calcified thought patterns and surface genuinely new associations. Use when divergence has collapsed, the user is stuck, convergent thinking has locked the option space, all ideas sound alike, or the team is going in circles. Trigger phrases include "ich komme nicht weiter", "wir drehen uns im Kreis", "alle Ideen klingen gleich", "I am stuck", "break the pattern", "shake things up", "we need a jolt".

2026-04-26
innovate-phase
متخصصو إدارة المشاريع

Run a specific phase (0 through 5) of the Vibe Innovation Framework. Reads the current ICD, executes the full phase prompt, writes the structured output back to the ICD. Use when the user wants to advance to the next phase, re-run a specific phase, or jump directly into Phase N because their starting TRL maps there. Trigger phrases include "Phase 2 starten", "weiter mit Phase 3", "run phase 1", "ideation phase", "do phase 4 build", "advance to validation".

2026-04-26
innovate
محللو أبحاث السوق ومتخصصو التسويق

Start the Vibe Innovation Framework. Runs entry diagnostic, session planning, ICD initialization, and phase dispatch from the user's current uncertainty level (TRL -2 to 4). Use when the user wants to begin a new innovation project, has only a vague idea or none at all, asks where to start, needs the framework's entry routing, or wants to resume from an existing ICD. Trigger phrases include "start innovation", "ich habe eine Idee", "wo fange ich an", "let us begin", "neues Projekt", "framework run starten", "I want to ideate".

2026-04-26
innovate-status
مديرو العلوم الطبيعية

Show current innovation project status: TRL, active phase, open assumptions, loop-back budget, and recommended next step. Use when the user wants a quick situational read, asks where the project stands, needs a status report between sessions, or before deciding the next move. Trigger phrases include "status", "wo stehen wir", "was ist offen", "current TRL", "what is next", "Lagebild".

2026-04-26
innovate-experiment
متخصصو إدارة المشاريع

Design a single validation experiment. One assumption, one experiment, one numeric threshold defined upfront. Use when the team needs to test an assumption between phases, refine a Phase 3 experiment design, or design a follow-up experiment after a Phase 4 inconclusive result. Enforces Principle 7 (one experiment, one assumption).

2026-04-26
innovate-export
متخصصو إدارة المشاريع

Render derived artifacts from the Innovation Canvas Document. Produces the two-page executive summary, an extracted decision log, the artifact specification handoff, or a status report suitable for sharing outside the team. Use at Phase 5 exit, before a stakeholder presentation, or whenever a derived view is needed.

2026-04-26
innovate-icd
متخصصو إدارة المشاريع

Manage the Innovation Canvas Document (ICD). Initialize, validate against the JSON schema, render a Markdown view, diff against a previous version, or save. Use whenever the user asks to start, check, sync, or persist their ICD between sessions.

2026-04-26
innovate-loopback
متخصصو إدارة المشاريع

Run the Vibe Innovation Framework mini-gate assessment to scope, justify, and execute a loop-back. Use when evidence in the current phase suggests an earlier phase's output is wrong, when a red-team challenge cannot be addressed in the current phase, or when an assumption from an earlier phase has been falsified.

2026-04-26
innovate-redteam
متخصصو إدارة المشاريع

Run the Vibe Innovation Framework red team protocol on any artifact (problem statement, concept, business model, experiment design, prototype, decision). Use when stress-testing an artifact against adversarial framings outside the usual phase Step 7 moment, or as a standalone sanity check before locking an output.

2026-04-26
innovate-experiment
متخصصو إدارة المشاريع

Design a single validation experiment. One assumption, one experiment, one numeric threshold defined upfront. Use when the team needs to test an assumption between phases, refine a Phase 3 experiment design, or design a follow-up experiment after a Phase 4 inconclusive result. Enforces Principle 7 (one experiment, one assumption).

2026-04-25
innovate-export
متخصصو إدارة المشاريع

Render derived artifacts from the Innovation Canvas Document. Produces the two-page executive summary, an extracted decision log, the artifact specification handoff, or a status report suitable for sharing outside the team. Use at Phase 5 exit, before a stakeholder presentation, or whenever a derived view is needed.

2026-04-25
innovate-icd
متخصصو إدارة المشاريع

Manage the Innovation Canvas Document (ICD). Initialize, validate against the JSON schema, render a Markdown view, diff against a previous version, or save. Use whenever the user asks to start, check, sync, or persist their ICD between sessions.

2026-04-25
innovate-loopback
متخصصو إدارة المشاريع

Run the Vibe Innovation Framework mini-gate assessment to scope, justify, and execute a loop-back. Use when evidence in the current phase suggests an earlier phase's output is wrong, when a red-team challenge cannot be addressed in the current phase, or when an assumption from an earlier phase has been falsified.

2026-04-25
innovate-redteam
محللو الإدارة

Run the Vibe Innovation Framework red team protocol on any artifact (problem statement, concept, business model, experiment design, prototype, decision). Use when stress-testing an artifact against adversarial framings outside the usual phase Step 7 moment, or as a standalone sanity check before locking an output.

2026-04-25