Skip to main content
تشغيل أي مهارة في Manus
بنقرة واحدة
pmcfadin
ملف منشئ GitHub

pmcfadin

عرض على مستوى المستودعات لـ 18 skills مجمعة عبر 1 مستودعات GitHub.

skills مجمعة
18
مستودعات
1
محدث
2026-07-18
خريطة المستودعات

أين توجد skills

أهم المستودعات حسب عدد skills المجمعة، مع حصتها من كتالوج هذا المنشئ وانتشارها المهني.

مستكشف المستودعات

المستودعات و skills الممثلة

flow-address
مطوّرو البرمجيات

Resolve PR review comments for an in-review issue — fix them in the issue's worktree, re-run the gate + C as needed, push, and reply per thread. Fourth stage of the CQLite delivery pipeline. Use when the owner leaves PR comments and says "address

2026-07-18
flow-groom
مطوّرو البرمجيات

Turn a rough idea into one scoped, labeled GitHub issue (one P0–P3 + status:ready, testable acceptance criteria), and decide oracle-vs-design routing. First stage of the CQLite delivery pipeline. Use when the owner says "groom <idea>", "file an issue for X", or brings a rough idea to scope.

2026-07-18
flow-implement
مطوّرو البرمجيات

Implement an approved issue — spawn sstable-developer (TDD) in the issue's worktree, run rust-reviewer + roborev on the lite-green diff BEFORE any full gate (review-first is default), open the PR, then hand the endgame (the ONE full gate → C → final roborev → merge-on-green → finalize) to a disposable flow-closer agent so gate/review churn never accretes in the lead session. Third stage of the CQLite delivery pipeline. Requires owner approval of the spec (design-driven) first. Use when the owner says "implement

2026-07-18
ci-cd-validation-merge-workflow
مطوّرو البرمجيات

Pre-push validation checklist (cargo fmt, clippy with zero warnings, feature flag testing, test suite), CI monitoring, merge process, and release quality gates. Use when preparing to push code, validating changes before PR, running CI checks, merging PRs, or preparing releases.

2026-07-18
flow-board
مطوّرو البرمجيات

Report status across all in-flight CQLite delivery work — render the shared GitHub Project claim board (item, status, assignee, priority) with drift + abandoned-claim reconciliation, then surface and drive the single furthest-along item waiting on the owner (a green PR to merge, a spec to approve), or offer a claim-aware pick-list. Use when the owner asks "where do things stand", "what's next", "unblock me", or "what needs me".

2026-07-18
flow-activate
مطوّرو البرمجيات

Activate a groomed design-driven issue — create its worktree + branch (1:1:1:1), run OpenSpec propose to produce proposal/design/specs/tasks, render the spec + recommended design INLINE, then STOP for the owner's approval. This is Seam 1; it never implements. Second stage of the CQLite delivery pipeline. Use when the owner says "activate

2026-07-18
flow-finalize
مطوّرو البرمجيات

Finalize a merged issue — archive its OpenSpec change (sync delta specs into openspec/specs/), remove the worktree + branch, and close the issue with a traceable comment. Fifth stage of the CQLite delivery pipeline. Runs after the PR is merged — workers merge autonomously on green (gate PASS + C PASS + roborev clean), so finalize normally follows the worker's own merge. Use right after a merge (or when the owner says "finalize

2026-07-18
ci-cd-validation-merge-workflow
محللو ضمان جودة البرمجيات والمختبرون

Pre-push validation checklist (cargo fmt, clippy with zero warnings, feature flag testing, test suite), CI monitoring, merge process, and release quality gates. Use when preparing to push code, validating changes before PR, running CI checks, merging PRs, or preparing releases.

2026-07-13
عرض أهم 8 من أصل 18 skills مجمعة في هذا المستودع.
عرض 1 من أصل 1 مستودعات
تم تحميل كل المستودعات