Skip to main content

environment-to-production-release-protocol

Use this skill when a Power Platform or Dynamics 365 solution must progress through a structured dev-to-test-to-production release pipeline using managed solutions and Power Platform pipelines, when rollback readiness must be verified before go-live, or when a deployment approval gate must be enforced. Defines the full ALM release flow — solution packaging, pipeline stage progression, pre-deployment validation, approval, deployment, rollback verification, and post-deployment confirmation. Does not authorize production deployments directly; all production-impacting actions require human approval from the environment owner or release manager. Does not replace a qualified Power Platform admin or ALM specialist.

الانتقال إلى التثبيت

معلومات المصدر

المستودع
Raishin/vanguard-frontier-agentic
آخر نشاط في المصدر
١٧ يونيو ٢٠٢٦ في ٠٧:٠٧
لغة SKILL.md المكتشفة
الإنجليزية
النجوم
١٨
التفرعات
٣

خيارات التثبيت

يُحدَّد Prompt الذي يراجع المصدر أولًا بشكل افتراضي. يمكنك التبديل إلى أمر مباشر أو تنزيل نسخة محلية.

مراجعة ملفات المصدر

اقرأ SKILL.md وأي ملفات مرافقة يعرضها SkillsMP قبل أن تقرر التثبيت.