Skip to main content
تشغيل أي مهارة في Manus
بنقرة واحدة

bottleneck-first-scheduling

النجوم٦
التفرعات٠
آخر تحديث٤ يوليو ٢٠٢٦ في ١٣:٣٧

Run BEFORE planning or launching a batch of work in this repo — a train/cert/eval sweep, a multi-PR push, a judge-farm run, or any "let's parallelize this / run these N things" moment, and whenever a queue is backing up, throughput has stalled, GPU/CI/merge is idle-but-blocked, or a measured delta can't be attributed. This cluster has exactly ONE shared Spark GPU, a serialized Mac judge, a human merge gate, and an append-heavy ledger — pushing more work at a saturated constraint only grows queue and mixes variables. Use to find the current constraint, cap work-in-progress at its capacity, subordinate everything else to it, and change ONE variable at a time so deltas stay attributable. The LLM is never the constraint.

التثبيت

التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.

SKILL.md
readonly