| description | Implement all items for a specific version in the pg_trickle roadmap. Use when: working through a milestone, implementing a release, or completing planned features. Drives a full implementation loop — reads plan docs, implements each item, keeps status up to date, asks the user when blocked, and reports what remains at the end. |
| argument-hint | Target version (e.g. 0.20.0) |
Implement Roadmap Version
Structured, self-driving workflow for implementing every item in a specific
pg_trickle release milestone. The skill continues working through items
sequentially, updates plan and roadmap status as it goes, surfaces blockers
to the user with concrete questions, and produces a completion report at the
end.
When to Use
- Starting work on a planned milestone
- Resuming an in-progress milestone after a pause
- Verifying how far along a release is and continuing from where it left off
Inputs to Gather First
Before any implementation begins, read these files in parallel:
ROADMAP.md — find the target version section: theme, item list, status
plans/PLAN_0_<version_underscored>.md — implementation order, phases,
item IDs, effort estimates, exit criteria (if the file exists)
CHANGELOG.md (last 200 lines) — avoid re-implementing already-shipped work
AGENTS.md — coding conventions, error handling rules, SPI rules
plans/INDEX.md — cross-reference any linked sub-plans
If plans/PLAN_0_<version_underscored>.md does not exist, create it following
the template in Step 1b before
proceeding.
Procedure
Step 0 — Establish Context
Run the following in parallel:
cat pg_trickle.control | grep '^default_version'
grep '^version' Cargo.toml | head -1
git status --short
git branch --show-current
Determine:
- Target version (from the argument or user's message)
- Current version (from
pg_trickle.control)
- Full details file:
roadmap/v<VERSION>.md-full.md
- Example: v0.34.0 →
roadmap/v0.34.0.md-full.md
- Branch: if on
main, a new branch must be created before making any
changes: git checkout -b <version>-implementation
Step 1a — Parse the Full Details File
Read roadmap/v<VERSION>.md-full.md and extract:
- All item IDs and titles (e.g.
DOG-1, PG17-3)
- Current status of each item in the Implementation Status table
(⬜ Not started / 🔄 In progress / ✅ Done / ⏭ Skipped)
- Phase groupings — respect the recommended implementation order
- Exit criteria — the checklist at the bottom of the full details file
- Items already done — skip these, but record them for the completion
report
Step 1b — Create the Full Details File if Missing
If roadmap/v<VERSION>.md-full.md does not exist:
- Read the roadmap section for the target version from
ROADMAP.md.
- Create
roadmap/v<VERSION>.md-full.md using this skeleton:
> **Plain-language companion:** [v<VERSION>.md](v<VERSION>.md)
## v<VERSION> — <Theme from ROADMAP>
**Status: Planned.** Derived from [ROADMAP.md](../ROADMAP.md).
> **Release Theme**
> <one-paragraph summary>
---
### Correctness
| ID | Title | Effort | Priority |
|----|-------|--------|----------|
<rows>
### Ease of Use
| ID | Title | Effort | Priority |
|----|-------|--------|----------|
<rows>
### Test Coverage
| ID | Title | Effort | Priority |
|----|-------|--------|----------|
<rows>
---
### Recommended Implementation Order
<phases derived from roadmap items, ordered by dependency>
---
### Implementation Status
| ID | Title | Status |
|----|-------|--------|
<one row per item, all "⬜ Not started" initially>
---
### Exit Criteria
- [ ] All P0 items ✅ Done
- [ ] `just test-all` passes
- [ ] `just check-version-sync` exits 0
- [ ] CHANGELOG.md entry written
- [ ] ROADMAP.md v<VERSION> row marked ✅ Released
- Also create the plain-language companion
roadmap/v<VERSION>.md if missing.
- Add both files to git staging:
git add roadmap/v<VERSION>.md roadmap/v<VERSION>.md-full.md
Step 2 — Build the Work Queue
Construct an ordered list of items to implement:
- Take all items from the full details file in phase order.
- Skip items already marked ✅ Done or ⏭ Skipped.
- Mark the first actionable item as
🔄 In progress in the full details file.
- Use
manage_todo_list to track all items, using the item ID as the todo ID.
If no items remain (all ✅ / ⏭), jump directly to Step 6 — Completion
Report.
Step 3 — Implement Each Item (Loop)
For each item in the work queue, repeat this inner loop:
3a. Understand the Item
Read the roadmap description for the item. Identify:
- What code/SQL/test/doc changes are needed
- Which files are affected
- Whether a schema change is required (SQL migration needed)
- Dependencies on other items (check they are ✅ Done first)
If a dependency is not yet done, reorder: implement the dependency first.
3b. Ask Before Ambiguous Work
Before making any irreversible change, if the item is ambiguous or has
multiple valid approaches, ask the user a focused question:
"For item <ID> — <title>, I'm planning to <approach>. Does that match
your intent, or should I <alternative>?"
Keep questions concrete and binary where possible. Never ask about more than
two items at once.
For straightforward, clearly-specified items: do not ask — just implement.
3c. Implement
Apply changes following AGENTS.md conventions:
| Item type | Required steps |
|---|
| New Rust feature | Edit src/, run just fmt, run just lint |
| New SQL function | Edit src/api/*.rs + upgrade migration SQL + full install SQL |
| New/modified SQL | Update sql/pg_trickle--<prev>--<cur>.sql and sql/pg_trickle--<cur>.sql |
| Schema change | Require explicit user confirmation before proceeding |
| New test | Add to tests/e2e_*_tests.rs following naming convention |
| Documentation | Edit the relevant file in docs/ |
| Config/GUC | Add to src/config.rs, document in docs/CONFIGURATION.md |
| Build/CI change | Edit justfile, .github/workflows/*.yml, Dockerfile.* |
After each item's changes are applied:
just fmt
just lint
For items that add or modify SQL-facing code, also run the appropriate tier:
just test-unit
just test-integration
Do not run just test-e2e or just test-all after every item — reserve
these for phase boundaries (see Step 3e).
3d. Update Status
Immediately after each item is implemented and lint passes:
- Update the item's row in the full details file's Implementation Status table:
⬜ Not started → ✅ Done
- If the item was in-progress (
🔄), also update that row.
- Update the Status line at the top of the full details file.
<!-- Example update in Implementation Status table -->
| DOG-3 | Create `pgtrickle.self_monitor()` stream table | ✅ Done |
3e. Phase Boundary Validation
At the end of each phase (not after every item):
just test-unit
just test-integration
If tests fail:
- Fix the failures before moving to the next phase.
- If a failure is in pre-existing code unrelated to the current item, note it
and ask the user: "I found a pre-existing failure in
<test>. Should I fix
it now or log it as a separate issue?"
Step 4 — Handle Blockers
If an item cannot be implemented because:
- Missing information: ask the user one focused question; do not guess.
- External dependency (e.g. a library update, a PostgreSQL version):
mark the item
⏭ Skipped (blocked: <reason>) in the plan file, record
it in the completion report, and continue with the next item.
- Scope unclear: present two concrete options and ask the user to choose.
- Compilation or test failure that is not fixable within the item scope:
pause and ask the user for guidance before continuing.
Never silently skip items without recording the skip reason in the full details file.
Step 5 — Update ROADMAP.md
After all items in the version are either ✅ Done or ⏭ Skipped:
- Find the version section in
ROADMAP.md.
- If all required items (P0/P1) are done, update the status:
- In the overview table:
Planned → ✅ Released
- In the section heading: add
**Status: Released (<date>).**
- If skipped items exist, update the status to reflect the gap:
**Status: Partially implemented — see plan for skipped items.**
- Run:
just check-version-sync
Step 6 — Completion Report
After the implementation loop finishes, output a structured report:
## v<VERSION> Implementation Summary
### Completed (<N> items)
- ✅ <ID>: <title>
- ✅ <ID>: <title>
...
### Skipped (<N> items)
- ⏭ <ID>: <title> — <reason>
...
### Remaining work before release
1. <Exit criterion not yet met>
2. <Exit criterion not yet met>
...
### Recommended next steps
- Run `just test-e2e` to validate full E2E suite
- Run `just test-all` for final gate
- Update CHANGELOG.md with `## [<VERSION>]` entry
- Bump version: `just bump-version <VERSION>`
- Create PR using the `create-pull-request` skill
If all exit criteria in the full details file's checklist are met, add:
Release-ready. All exit criteria satisfied. Ready for create-pull-request.
Status Symbols
| Symbol | Meaning |
|---|
| ⬜ | Not started |
| 🔄 | In progress |
| ✅ | Done |
| ⏭ | Skipped (reason recorded) |
| ❌ | Failed / blocked |
Conventions Reference (from AGENTS.md)
- No
unwrap() or panic!() in non-test code
- All
unsafe blocks must have // SAFETY: comments
- SPI connections are short-lived
- New SQL functions use
#[pg_extern(schema = "pgtrickle")]
- Return
Result<T, PgTrickleError> — convert at API boundary
- Cast
name-typed columns to text in SPI queries
- Tests use Testcontainers — never a local PG instance
- Use
pgrx::log!() / info!() — never println!()
Step 7 — Maintain PLAN_OVERALL_ASSESSMENT.md
After the version implementation is complete (all items ✅ Done or ⏭ Skipped):
-
Verify cross-references are still valid:
- Open
plans/PLAN_OVERALL_ASSESSMENT.md
- Scan all
→ Roadmap: pointers (§2–§9 and tables §10)
- If any roadmap items were renamed, moved between milestones, or had their
IDs change (e.g.
EC01-1 → EC01-2), update the corresponding links
- Run this check:
grep -n "→ Roadmap:" plans/PLAN_OVERALL_ASSESSMENT.md
and verify each link matches the current ROADMAP.md
-
After the version ships, create a post-mortem assessment:
- Once v is released, document what was delivered vs. what slipped
- Create or update
plans/POSTMORTEM_0_<VERSION>.md with:
- Which items were completed on schedule vs. late vs. skipped
- Why items slipped (if any) — blockers, scope underestimation, etc.
- Impact on downstream P1/P2 items (if the v<VERSION+1> roadmap needs
rebalancing)
- This informs prioritization of subsequent releases
-
Note status drift:
- Items marked "Draft" in assessment (e.g.
PLAN_MULTI_DATABASE,
PLAN_PARALLELISM) may be promoted or deprioritized
- After a major roadmap change, scan
plans/PLAN_OVERALL_ASSESSMENT.md
for references to draft plans and update them if the plans changed status
- Example: if
PLAN_PARALLELISM was Draft and is now actively being
implemented in v0.22, update the assessment to reflect that
Important Safeguards
- Never drop tables or columns without explicit user confirmation
- Never push to
main directly — always work on a feature branch
- Never run
git push --force without explicit user confirmation
- Never use shell heredocs for PR body text (Unicode corruption risk)
- Never skip lint —
just lint must pass with zero warnings before
marking any item done
- Never mark an item done if its associated tests are failing
- Keep PLAN_OVERALL_ASSESSMENT.md in sync — after major roadmap edits,
verify all cross-references and status notes are still accurate