"Done coding" is not "ready to ship." Before a change reaches users, confirm you can release it
safely, see if it breaks, undo it fast, and tell people what changed. The riskier the
change, the more this matters — a silent 100% deploy with no rollback is a bet, not a release.
Launch readiness is the go/no-go gate at the Ship phase. It chains verification from Build and
Review into production safely — not a substitute for [[browser-checks]], [[review-gate]], or
[[pipeline-ops]], but the layer that asks "what happens when this hits real traffic?"
Pairs with [[migration-path]] for deploy order and data rollback limits, [[observability]] for signals
before and after, [[git-flow]] for tags and hotfix branches, [[incident-response]] if launch degrades
prod, [[hardening]] for security-sensitive launches, and [[decision-docs]] / changelog for communicated
changes.
When to Use
- Before deploying a feature, fix, migration, or config change to production
- Expanding rollout — canary → 10% → 50% → 100%
- Cutting a release tag or promoting a build to users
- Anything user-visible, hard to reverse, or on a critical path (auth, payments, checkout)
- Setting up launch conventions for a team
- Go/no-go meeting before a scheduled release window
Light pass for low-risk changes (copy tweak behind flag, internal-only tool). Full pass for
data migrations, payment flows, auth, and large audience flips.
Skip only for changes with zero production surface (local tooling) — rare for this skill.
Process
Work in order. Don't deploy until rollback and observability are in place for the risk level.
1. Classify risk — depth of readiness follows risk
| Tier | Examples | Readiness depth |
|---|
| Low | Copy, CSS behind flag, internal admin | CI green, quick smoke, owner watching |
| Medium | New UI flow, new API field, perf change | Staging verify, metrics, rollback tested, gradual rollout |
| High | Migration, payments, auth, deletion, scale change | Full checklist, canary, exec comms, soak, on-call engaged |
Under-preparing a high-tier launch causes incidents; over-preparing every typo wastes time — classify
first.
2. Confirm it works where it will run
Production differs from your laptop. Before go:
Staging passed is necessary, not sufficient — scale, cache, and data shape differ in prod.
3. Plan deploy order — sequence matters
Wrong order breaks deploys mid-flight ([[migration-path]]):
Typical safe order:
1. Expand DB/schema (backward-compatible migration)
2. Deploy backend that tolerates old + new schema
3. Backfill data (batched, monitored) if needed
4. Deploy frontend / enable flag for new behavior
5. Contract phase later — remove old path when usage zero
Document dependencies: "API v2 before mobile app 2.1", "migration 0042 before app deploy."
Maintenance window only when unavoidable — document start/end and rollback trigger.
4. Plan the rollout — gradual beats instant
Prefer contained exposure over flipping everyone at once:
| Strategy | When | Control |
|---|
| Feature flag | New behavior toggleable | Off → internal → % → 100% |
| Canary | Infra supports traffic split | 1% → 5% → 25% → 100% |
| Staged regions | Multi-region deploy | Region A → B → all |
| Dark launch | Code in prod, behavior off | Validate metrics at zero traffic |
| Blue/green | Instant switch with two pools | Switch + rollback = switch back |
Define steps and pauses:
10:00 — deploy build + flag OFF (dark)
10:15 — enable internal dogfood (flag: staff)
11:00 — 5% users, watch 30 min
12:00 — 50% if metrics green
14:00 — 100% or halt
Who watches each step — name a person, not "the team."
No flag/canary available for high-tier change → smaller audience first (beta group, single tenant)
or explicit risk acceptance documented.
5. Rollback — tested, documented, data-aware
Rollback is not "we'll revert git." Define exact undo for each layer:
| Layer | Rollback action | Data reversible? |
|---|
| Feature flag | Turn OFF | Usually yes |
| App deploy | Redeploy previous artifact / revert commit | Code yes |
| Config | Restore previous config version | Usually yes |
| DB migration | Often not trivial — plan expand-contract ([[migration-path]]) | |
| Cache | Purge or TTL wait | May serve stale briefly |
Test rollback before launch in staging:
- Deploy new → verify → rollback → verify old behavior restored
- If migration can't roll back, forward-fix plan is mandatory — not optional hope
Document in release notes:
Rollback: flip `checkout_v2` flag OFF + redeploy v1.4.2 if needed.
Migration 0042 is expand-only — rollback does NOT remove column.
6. Observability before launch — not after
You must know if the launch broke something ([[observability]]):
Define healthy for this change:
Checkout v2 launch:
- p95 POST /orders latency < 500ms
- error rate on /orders < 0.5%
- conversion rate within 5% of baseline (business metric)
Before go-live:
During launch: same dashboard open; don't discover gaps when users complain.
7. Go / no-go criteria
Explicit hold conditions — anyone can call halt:
GO if:
- CI green, staging sign-off, rollback tested
- On-call aware, dashboard ready
- No open blocker bugs
NO-GO if:
- Unresolved migration risk
- Rollback untested
- Missing alerts on critical path
- Key person unavailable with no backup
Scheduled release with NO-GO → postpone, don't "YOLO" because the calendar says Tuesday.
8. Communicate — internal and external
| Audience | What | When |
|---|
| Engineering / on-call | What's shipping, rollout steps, rollback commands, dashboard link | Before deploy |
| Support / CS | User-visible changes, known issues, macros | Before user exposure |
| Stakeholders | Risk tier, window, success metrics | Before / after go |
| Users | Changelog, in-app notice, status page if risky | When behavior changes |
Launch owner — single name for "is this launch still go?" during the window.
External comms factual — don't promise what isn't shipped yet.
9. Watch through rollout — don't deploy and leave
Active monitoring through each rollout step:
- Error rate, latency, saturation — compare to pre-launch baseline, not zero
- Business metrics lag technical — know the delay (conversion may be T+1h)
- Soak period after 100% — 30–60+ min for high tier; watch for cache refill, retry storms
- Ready to roll back — IC or launch owner can call it ([[incident-response]])
Checklist after each ramp:
5% ramp: errors flat, p95 +12ms (acceptable), proceed
50% ramp: error spike on payment — HALT, flag OFF, incident declared
10. Post-launch — close the loop
Within 24–48 hours:
Launch isn't done at deploy — it's done when stable and documented.
11. Scenario playbooks
Feature behind flag
Deploy dark → internal ON → staged % → full → remove old path in follow-up PR.
Database migration + code
Expand migration deploy → app deploy (dual-read) → backfill job monitored → later contract migration.
Breaking API change
New version live alongside old → migrate clients → deprecate old with metrics ([[interface-design]],
[[migration-path]]).
Payment / checkout change
High tier: canary, payment test cards in prod monitor, rollback = flag + revert, finance notified.
Mobile app + server
Server backward-compatible first → app store release → force-upgrade only if unavoidable.
Config-only change
Diff config in staging → deploy → watch dependency that reads config → rollback = previous config rev.
Hotfix during incident
Branch from prod tag ([[git-flow]]); minimal fix; accelerated launch with single watcher; postmortem
after ([[incident-response]]).
Low-risk copy / UI polish
CI + staging smoke + owner watches deploy — skip full canary if tier is low and flag exists.
Common Rationalizations
- "It worked in staging." — Prod data, scale, and config differ; verify and watch real traffic.
- "We can roll back if needed." — Only if rollback exists, is tested, and handles data.
- "Add monitoring after launch." — You're blind exactly when it matters most.
- "Just ship to everyone." — Canary/flag turns outage into a blip.
- "Rollback is redeploy — easy." — Migrations and cache often make it hard; test it.
- "Alerts exist somewhere." — Confirm they fire on this change's failure mode.
- "Support will figure it out." — Brief them before users hit the change.
- "We'll write release notes after." — Notes before launch clarify what you're risking.
- "Go/no-go is bureaucracy." — Five minutes prevents multi-hour incidents.
Red Flags
- Deploy straight to 100% with no flag, canary, or beta cohort (high/medium tier)
- Rollback never tested; migration with no forward-fix plan
- No metrics/alerts on the changed code path before traffic hits it
- Deploy and walk away — nobody watching dashboard during ramp
- Config/secrets differ between staging and prod untracked
- Deploy order wrong — code before backward-compatible migration
- Release notes / support brief missing for user-visible change
- "Healthy" undefined — no way to know if launch succeeded
- Forced deploy because of calendar despite open NO-GO criteria
- Rollback plan is "fix forward" only with no time estimate
- Launch owner unnamed; on-call unaware
- Post-launch flag and dead code never cleaned up