بنقرة واحدة
weekly-report-standard
在撰写或审阅团队周报时提供格式与内容规范。当用户说"写周报"、"检查周报格式"、 "周报该怎么写"时调用。覆盖结构、量化表达和禁忌项。不适用于日报、月度总结或 绩效自评(各有其模板)。
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
القائمة
在撰写或审阅团队周报时提供格式与内容规范。当用户说"写周报"、"检查周报格式"、 "周报该怎么写"时调用。覆盖结构、量化表达和禁忌项。不适用于日报、月度总结或 绩效自评(各有其模板)。
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
استنادا إلى تصنيف SOC المهني
Author a NEW, ready-to-run prompt or harness for a long-running iterative agent after its goal and load-bearing decisions are settled. Use for iterate-until-passing, multi-session, self-verifying, research, coding, or bulk processing loops that need state, stop conditions, and recovery. If intent is still unsettled, use loop-spec first. If a harness already exists and the user wants it improved or diagnosed, use loop-review first. Use loop-eval for test design, loop-ops for scheduling/unattended operation, and loop-retro after a real run. The deliverable is the smallest sufficient paste-ready harness, not the task itself. Trigger only when the user explicitly wants a reusable loop prompt/harness; direct requests to fix, run, or iterate on the task itself are ordinary execution. Requests that include actual scheduling/operation are led by loop-ops; when called by loop-ops, return only the per-run prompt.
Design success criteria and a small eval set for an agentic loop — so the loop knows when it's done, and so YOU can measure whether the loop is any good. Use this whenever the user asks how to know if their agent/loop is working, how to define or sharpen success criteria, how to write evals/tests/graders for an agent, how to measure agent reliability, or wants pass/fail checks for a long-running task. Also use as the verification step when building a loop with loop-engineering. Covers verifiable criteria, code-based vs model-based graders, reliability metrics (pass@k vs pass^k), and balanced positive/negative cases. For a new unscoped loop, loop-spec owns success-definition intake first. Mining failures from specified run artifacts is led by loop-retro. Whole-harness audits are led by loop-review. This skill owns a standalone eval artifact once scope is settled. Routing tests for this suite are owned by loop-review.
Operate an existing or intent-settled long-running, recurring, or unattended agent loop SAFELY — the scheduling, cost, safety, and rollout layer around a loop. Use this WHENEVER the user wants to RUN/SCHEDULE/OPERATE an agent loop over time rather than author its prompt: "run this agent every day / on every PR / nightly / on a cron", "set up an autonomous agent that keeps running", "babysit my PRs", "auto-triage issues", "sweep CI failures", "draft release notes automatically", "how do I run my loop unattended without it doing damage", or any question about an agent loop's cadence, autonomy level, token/cost budget, safety gates, denylist, human escalation, multi-loop coordination, kill switch, or operational readiness. If the per-run goal, success, safety, or budget is unsettled, loop-spec owns the request first. For a compound build-and-schedule request, loop-ops is lead and calls loop-engineering once for the per-run prompt. Produces an operating plan (pattern + cadence + autonomy level + budget + safety g
Post-run retrospective for an agent loop — close the improvement flywheel. Reads the ACTUAL run artifacts (structured event log / progress view / state files / PLAN history / loop-docs) and produces: an evidence-cited diagnosis, concrete harness revision proposals, gotcha eval cases from real failures, and SPEC/STANDARDS revision proposals for human ratification. Trigger AFTER a loop has run: "loop 跑完了帮我复盘", "看看运行记录哪里出问题", "这个循环为什么 thrash / 超预算了", "分析一下 run log", "post-mortem my loop", "did my loop actually do a good job". Not for auditing a loop prompt BEFORE it runs (loop-review), operating/scheduling a loop (loop-ops), or building one (loop-spec / loop-engineering).
Audit and harden an EXISTING agentic-loop prompt or harness against loop-engineering best practices. Use this whenever the user has an agent/loop iterative/autonomous prompt and wants it reviewed, critiqued, scored, or made more reliable — or when they describe loop misbehavior and want to know why: "my agent runs forever / never stops", "it quits too early", "it says it's done but it isn't", "it keeps redoing the same thing", "it forgets progress after a restart", "it edits the tests to pass", "review/improve my iterative agent prompt", "why is my loop flaky". It produces a scored report — critical gaps first, each with a concrete fix — and can rewrite the prompt to close them. Exclude one-shot chatbot/system prompts. If symptoms belong to a completed run or run artifacts, loop-retro diagnoses first. Whole-harness audits are led here even when criteria are the suspected defect. This skill also owns maintenance audits of this six-skill router.
Clarify and scope a NEW agent loop before its harness is authored. Use when the user wants to create an autonomous/repeating agent, asks to turn a vague idea into a loop, or has not yet settled success criteria, boundaries, risk, or budget. First test whether a loop is justified; route one-shot or deterministic tasks to a simpler workflow. Use proportionate intake: confirm only load-bearing decisions, offer visible reversible defaults for minor details, and write durable SPEC/STANDARDS/GOALS artifacts only when the loop's scale or lifespan benefits from them. Hands settled intent to loop-engineering. Not for reviewing an existing harness (loop-review), measuring it (loop-eval), running it on a schedule (loop-ops), or post-run analysis (loop-retro).
| name | weekly-report-standard |
| version | 1.0 |
| description | 在撰写或审阅团队周报时提供格式与内容规范。当用户说"写周报"、"检查周报格式"、 "周报该怎么写"时调用。覆盖结构、量化表达和禁忌项。不适用于日报、月度总结或 绩效自评(各有其模板)。 |
规则未覆盖的情况从这里推导。
| 规则 | 正确 ✅ | 错误 ❌ | 原因 |
|---|---|---|---|
| 三段结构 | 进展 / 风险 / 下周计划 | 流水账混排 | 读者 30 秒定位所需信息 |
| 进展量化 | "完成迁移 340/500 表" | "迁移进展顺利" | 形容词无法对齐预期 |
| 风险给动作 | "延期风险:需 DBA 本周三前批权限" | "有一些风险" | 没有动作的风险=没说 |
| 计划可验收 | "下周五前出压测报告" | "继续推进压测" | 可验收才能被跟进 |