assess-epic-readiness
Evaluates whether epics are ready for PI or quarter planning by scoring 7 readiness dimensions.
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
القائمة
Evaluates whether epics are ready for PI or quarter planning by scoring 7 readiness dimensions.
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
استنادا إلى تصنيف SOC المهني
| name | assess-epic-readiness |
| version | 1.0.0 |
| description | Evaluates whether epics are ready for PI or quarter planning by scoring 7 readiness dimensions. |
| category | planning |
| trigger | PI planning preparation, quarterly planning, backlog grooming, epic review. |
| autonomy | supervised |
| portability | universal |
| complexity | intermediate |
| type | evaluation |
| inputs | [{"name":"epics","type":"structured-text","required":true,"description":"List of epics to evaluate. Per epic: title, description, acceptance criteria, child tickets (with estimates if available), linked design artifacts, technical approach notes, identified dependencies, rollout strategy.\n"},{"name":"readiness_standard","type":"text","required":false,"description":"Custom readiness expectations. If not provided, the default 7-dimension framework is used.\n"}] |
| outputs | [{"name":"readiness_report","type":"structured-text","description":"Per-epic scorecard with dimension scores, overall classification (Ready / Partially Ready / Not Ready), and specific gaps to address.\n"}] |
| model_compatibility | ["claude","gpt-4","gemini","llama-3"] |
Evaluate whether epics meet a quality bar for planning commitment. Prevents teams from committing to poorly defined work that will derail mid-sprint.
For each epic, evaluate these dimensions independently. Score each: Ready (2), Partial (1), Missing (0).
Dimension 1 — Problem Statement and User Value
Does the epic clearly articulate what problem it solves and why it matters?
| Score | Criteria |
|---|---|
| 2 (Ready) | Clear problem statement, target user identified, business value articulated, success metrics defined |
| 1 (Partial) | Problem is understood but vaguely stated, or value is assumed but not quantified |
| 0 (Missing) | No description, or description is a technical task with no user context |
Dimension 2 — Acceptance Criteria
Are the conditions for "done" clearly defined?
| Score | Criteria |
|---|---|
| 2 (Ready) | Testable acceptance criteria listed (3+ criteria for a typical epic), edge cases considered |
| 1 (Partial) | Some criteria exist but are vague ("it should work well") or incomplete |
| 0 (Missing) | No acceptance criteria defined |
Dimension 3 — Breakdown and Estimation
Has the epic been decomposed into plannable child tickets with estimates?
| Score | Criteria |
|---|---|
| 2 (Ready) | Child tickets created, 80%+ have story point estimates, total scope is clear |
| 1 (Partial) | Some child tickets exist but <50% estimated, or breakdown is too coarse |
| 0 (Missing) | No child tickets, or epic is a single monolithic item |
Dimension 4 — Design and UX
Are design decisions made and artifacts available?
| Score | Criteria |
|---|---|
| 2 (Ready) | Design artifacts linked (mockups, wireframes, prototypes), design review completed |
| 1 (Partial) | Design direction agreed but artifacts incomplete, or design review pending |
| 0 (Missing) | No design work started, or "TBD" noted |
For backend-only epics with no UI component, score this dimension based on API contract or data model design instead. Note: "No UX component — scored on technical design."
Dimension 5 — Technical Approach
Is the implementation approach understood?
| Score | Criteria |
|---|---|
| 2 (Ready) | Technical approach documented or spiked, major risks identified, architecture reviewed |
| 1 (Partial) | General approach agreed but not documented, or spike needed for a specific area |
| 0 (Missing) | No technical discussion, or approach is "figure it out during the sprint" |
Dimension 6 — Dependencies
Are external dependencies identified and their status known?
| Score | Criteria |
|---|---|
| 2 (Ready) | All dependencies identified, linked, owners confirmed, delivery timelines agreed |
| 1 (Partial) | Dependencies identified but not all confirmed, or timelines are tentative |
| 0 (Missing) | Dependencies not assessed, or "probably no dependencies" without verification |
Dimension 7 — Rollout Strategy
Is there a plan for how this reaches users?
| Score | Criteria |
|---|---|
| 2 (Ready) | Feature flag strategy defined, rollout phases planned, rollback plan documented |
| 1 (Partial) | Will use feature flags but phases not defined, or rollback approach is "revert the PR" |
| 0 (Missing) | No rollout plan, or assumption of big-bang release |
For teams not using feature flags or progressive rollout, adjust this dimension to assess release planning (which version, what release notes, any migration steps).
| Total Score (out of 14) | Classification |
|---|---|
| 12-14 | Ready — can be committed to in planning |
| 8-11 | Partially Ready — can be planned with identified gaps as prerequisites |
| 0-7 | Not Ready — requires significant preparation before commitment |
For each epic scoring below Ready, list the specific gaps that need to be addressed. Be concrete:
Across all evaluated epics:
## Epic Readiness Assessment
**Date**: {date}
**Scope**: {planning period — e.g., "PI 26.3" or "Q2 2026"}
**Epics evaluated**: {count}
### Summary
| Classification | Count | Percentage |
|---------------|-------|-----------|
| Ready | {n} | {%} |
| Partially Ready | {n} | {%} |
| Not Ready | {n} | {%} |
**Planning readiness**: {Ready to proceed | Proceed with caveats | Delay recommended}
**Most common gap**: {description}
---
### {Epic Title}
**Classification**: {Ready|Partially Ready|Not Ready} ({score}/14)
| Dimension | Score | Notes |
|-----------|-------|-------|
| Problem & Value | {0-2} | {detail} |
| Acceptance Criteria | {0-2} | {detail} |
| Breakdown & Estimation | {0-2} | {detail} |
| Design & UX | {0-2} | {detail} |
| Technical Approach | {0-2} | {detail} |
| Dependencies | {0-2} | {detail} |
| Rollout Strategy | {0-2} | {detail} |
**Gaps to address**:
1. {specific gap with recommendation}
2. {specific gap with recommendation}
---
(repeat for each epic)
**Confidence**: {High|Medium|Low} — {justification}
For borderline epics (near the Ready/Partially Ready or Partially Ready/Not Ready threshold), consider whether a slightly different weighting of the dimensions would change the classification. If it would, note the ambiguity and downgrade confidence to Medium.
Generates messages suggesting a ghost-done ticket be transitioned to Done. Helpful tone, evidence-based, always asks rather than commands.
Generates contextual, humble messages designed to unblock stuck tickets. Use when a stuck ticket needs a nudge comment.
Generates a quick morning briefing with what happened, what's stuck, and what needs attention today.
Computes team capacity for a sprint or PI from headcount, PTO, and run-rate buffer.
Estimates completion probability for remaining work using velocity distribution and Monte Carlo-style simulation.
Annotates agent output with inline source citations to eliminate hallucination risk. Ensures every metric, claim, and ticket reference is traceable to a specific data source.