| tools | [{"name":"view","description":"Read the live closeout artifacts and contract language","when":"When checking whether plan, state, or spike artifacts satisfy the stated closeout requirement"},{"name":"powershell","description":"Inspect tracked status for the files being used as closure evidence","when":"When acceptance depends on whether the evidence is durable in git, not merely present in the worktree"}] |
Context
Use this when a closeout or acceptance note says work is complete because plan/state/spike artifacts now exist. Presence alone is not enough for reviewer acceptance if the evidence files are not versioned with the implementation they certify.
Patterns
- Read the contract and the live artifact content first; reject empty or malformed proof even if the file is tracked.
- After content review, confirm the proving artifacts are actually tracked in git. Closure evidence must be durable.
- Treat scripts and their proving artifacts as one acceptance set: if the script is tracked but the state or spike proof is untracked, the closeout is still incomplete.
- Separate substantive correctness from persistence. It is possible for an artifact to be well-written and still fail acceptance because it is untracked.
- Generate historical dashboard snapshots only after plan/state truth surfaces have moved to the closeout boundary. Otherwise the artifact can freeze a stale live phase (for example
reviewing) into what claims to be closeout evidence.
- On rejection, name the exact files that must be versioned and lock out the original closeout author for the next revision cycle.
- For narrow re-reviews, judge only the cited defect. If the exact evidence files named in the rejection are now tracked, close that defect directly instead of reopening already-cleared content questions.
Examples
scripts\specrew-init.ps1 and the two deployment scripts were tracked, but specs\001-specrew-product\iterations\001\state.md and specs\001-specrew-product\iterations\001\spikes.md remained untracked. Verdict: NEEDS-WORK because the accepted-work evidence was not durable.
- A plan row may truthfully mark a task
done, but if the spike deliverable cited by that row is still outside version control, the closeout record is incomplete.
- Re-reviewing the same closeout later,
git ls-files returned both state.md and spikes.md, and git status --short showed them as tracked additions. Verdict: PASS on the prior rejection reason, because the durability defect was the only remaining acceptance gap in scope.
Anti-Patterns
- Granting PASS because a file exists on disk without checking whether it is part of the repository history.
- Treating a decision memo as a substitute for tracked plan/state/spike artifacts.
- Softening a rejection because only “administrative” tracking work remains; auditability is part of the acceptance requirement.