Overview
Pick the next ready task from .forge/tasks.yaml, load its contracts from .forge/contracts/, implement using tdd discipline (red-green-refactor), verify against acceptance criteria, commit, and mark done. Repeat until all tasks are complete.
When to Use
.forge/tasks.yaml exists with at least one unstarted task
- Dependencies for the next task are complete
- Ready to write code (not planning, not designing)
When NOT to Use
- No task plan exists — run
planning-and-task-breakdown first
- Architecture is unclear — run
architecture-and-contracts first
- Task is XL and not decomposed — spike first, then plan
Common Rationalizations
| Thought | Reality |
|---|
| "I'll implement a few tasks together to go faster" | Mixing tasks blurs acceptance criteria and commit history |
| "I don't need to read the contract — I know the interface" | Contracts encode invariants and error types you'll miss |
| "I'll write tests after the implementation is working" | Then you're testing implementation, not behavior |
| "This small extra thing is obviously correct to add" | Scope creep is always "obviously correct" in the moment |
| "I'll commit everything at the end" | Atomic commits per task make revert and review tractable |
Red Flags
- Implementing a task that has unsatisfied dependencies in
tasks.yaml
- Writing code that touches modules not listed in the task's
files_likely_affected
- Skipping the contract read — implementing to an assumed interface
- Committing with a message that doesn't reference the task ID
- Acceptance criteria not verifiable after implementation
- Task marked done before verification step passes
.forge/tasks.yaml not updated mid-flight when a task is split or blocked (the plan diverges silently)
- Editing
.forge/contracts/<X>.md inline when build reveals the contract is wrong (file /feedback instead)
- Skipping
skills: tag reads — implementing UI without loading design-system, writing migrations without loading database-design
Core Process
Step 1: Select the next task
Read .forge/tasks.yaml. Find all tasks where status: pending (or unset) AND every task in depends_on has status: done. Pick the highest-priority unblocked task (or ask the user if multiple are ready).
Immediately mark the selected task in place:
status: in_progress
started_at: <ISO 8601 UTC with Z>
Write the file back. The mutation is per-task — do not rewrite the whole tasks.yaml. Re-emit only the forge:meta generated_at/content_hash if the file as a whole was touched (status flips count); the depends_on set does not change.
Step 2: Load context
Read the task's acceptance criteria and verification steps. Read each contract listed in the task's contracts field from .forge/contracts/. Load only the files_likely_affected — don't read the whole codebase.
Skill-tagged context load (#41): if the task has a skills: field (e.g., [design-system, accessibility, api-design]), read skills/<each>/SKILL.md BEFORE writing the first test. These tags exist precisely because the task touches a domain whose rules are encoded in another skill. Skipping them means the implementation will recreate problems those skills exist to prevent.
If .forge/testing-strategy.md exists, also read it — per-module coverage decisions there override TDD defaults.
Step 3: Implement with TDD
Follow the tdd skill. For this task's acceptance criteria:
RED: Write a failing test for the first acceptance criterion
GREEN: Write minimum code to make it pass
REPEAT for each acceptance criterion
REFACTOR: Clean up while keeping all tests green
Stay within the task's scope. Do not add features not in the acceptance criteria. Do not touch files outside files_likely_affected without explicit reason.
Step 4: Verify
Run the verification steps listed in the task. All must pass:
- Unit tests green
- Integration tests green (if listed)
- Manual verification step confirmed (if listed)
Step 5: Commit
git add <files>
git commit -m "[T001] <task title>
- Implements: <acceptance criterion 1>
- Implements: <acceptance criterion 2>
- Tests: <what the tests verify>"
Step 6: Mark done
Update .forge/tasks.yaml in place:
status: done
completed_at: <ISO 8601 UTC with Z>
commit: <short sha of the commit from Step 5>
Check if any tasks whose depends_on is now fully satisfied. Report progress to user.
Step 7: Mid-task discoveries — split, block, or feedback
If during Steps 2-4 you discovered the task can't complete as-scoped, do NOT silently continue. Update .forge/tasks.yaml and (if upstream is wrong) file a feedback entry:
- Scope creep discovered → split the task. Mark the original
status: split. Append new task IDs into the notes array describing the split. Add new task entries for the carved-out work. Do not implement the carved-out work in this run.
- Unmet dependency surfaced → set
status: blocked. Append the blocker to notes. Stop work on this task. Pick the next ready task.
- The CONTRACT is wrong (refund endpoint missing, wrong type, missing error case) → run
/feedback to file .forge/feedback/<timestamp>-build.md targeting the broken contract. Do NOT edit the contract inline. Mark the task status: blocked with notes referencing the feedback entry path. The contract update happens via /architect re-run.
- The TEST STRATEGY contradicts what you need to write → file
/feedback targeting .forge/testing-strategy.md. Continue per the strategy's current text for now.
After ≥3 such events in a sprint, forge-sync will flag TASKS_DIVERGED — at that point, run /plan to re-baseline before picking the next task.
Verification
Before marking any task done: