| name | disaster-response |
| description | Generate disaster response reports for Polish areas. Use when user describes a disaster (flood, storm, industrial accident, infrastructure failure) affecting a selected area with known coordinates and infrastructure data. |
Disaster Response Report Generator
You have access to detailed area data including coordinates, buildings (houses, schools, hospitals), infrastructure (roads, railways, power plants), and critical facilities. When a user describes a disaster affecting this area, generate a comprehensive response report.
When to Use This Skill
Use this skill whenever:
- User describes a disaster event (flood, tornado, chemical spill, power plant failure, etc.)
- The affected area data is already available from user selection
- User needs damage assessment and action recommendations
- Important: Only handle disasters occurring in Poland
Disaster Validation
Before generating the report, verify the disaster is realistic:
- Cross-reference with real-world disaster patterns and historical data
- Reject implausible scenarios (e.g., earthquakes in seismically stable regions)
- Consider geographic and climatic appropriateness for Poland
Report Structure
ALWAYS use this exact template:
# Disaster Response Report
## 1. Executive Summary
- Disaster type and severity
- Affected area overview
- Immediate priorities
## 2. Disaster Details
- Type: [flood/storm/industrial accident/etc.]
- Description: [user-provided details]
- Validation: [assessment of realism based on real-world data]
## 3. Damage Assessment
### Critical Infrastructure
| Infrastructure Type | Status | Impact |
|-------------------|--------|--------|
| Power Plants | [damaged/operational/critical] | [details] |
| Hospitals | [affected/functional] | [capacity impact] |
| Schools | [damaged/usable as shelter] | [details] |
| Roads | [blocked/partial/clear] | [affected routes] |
| Railways | [operational/suspended] | [details] |
### Residential Impact
- Houses affected: [estimated number]
- Evacuation needed: [yes/no, estimated population]
- Safe zones identified: [locations]
### Economic Impact
- [High-level estimate of economic damage]
## 4. Recommended Actions
### Immediate (0-24 hours)
1. [Priority action with responsible entity]
2. [Evacuation routes if needed]
3. [Emergency resource deployment]
### Short-term (24-72 hours)
1. [Damage assessment teams]
2. [Resource allocation]
3. [Temporary infrastructure]
### Medium-term (3-14 days)
1. [Recovery priorities]
2. [Infrastructure repair sequence]
3. [Community support]
## 5. Resource Allocation
- Emergency services needed: [types and quantities]
- Equipment required: [list]
- Personnel estimates: [numbers by category]
## 6. Risk Assessment
- Secondary hazards: [what else might happen]
- Ongoing threats: [continued risks]
- Safety warnings: [for responders and residents]
Analysis Guidelines
- Leverage area data: Use the known infrastructure layout to make specific, location-aware recommendations
- Be comprehensive but concise: High-level overview, not building-by-building detail
- Prioritize human safety: Evacuation and rescue always come first
- Consider cascading effects: Power outages affect hospitals, road closures affect emergency response
- Reference real-world precedents: Draw from similar Polish or European disasters when relevant
- Be specific to Poland: Use Polish emergency service names (Straż Pożarna, Pogotowie, etc.)
Output Format
- Structured markdown with clear headings
- Tables for infrastructure status
- Bullet points for recommendations
- Actionable, prioritized content