Shape Up — Cycle Execution
Skill metadata: version "1.0"; tags [shapeup, cycle-work, hill-charts]; recommended tools [].
A Shape Up cycle is a fixed time box (typically 6 weeks) in which a team builds the pitched
solution. The team owns how they get there; the key disciplines are scope management and progress
visibility.
When to use
- Managing in-cycle scope during a Shape Up cycle
- Using hill charts, applying scope hammering, or deciding whether to invoke the circuit breaker
When NOT to use
- When writing a pitch — prefer
shapeupPitching
- When running the betting table — prefer
shapeupBetting
Hill Charts
Hill charts track tasks on two halves:
- Uphill (left): figuring out — the task still has unknowns.
- Downhill (right): executing — the approach is settled, the team is building.
Tasks move uphill as design and unknowns are resolved, then downhill as implementation proceeds.
A task stuck on the uphill side is a risk signal.
Use hill charts to:
- Surface hidden unknowns early
- Identify tasks that are stalling before they become blockers
- Distinguish "we know what to do" from "we know how to do it"
Scoping During a Cycle
Scope is not fixed at the start of a cycle. The team scopes as they discover the real shape of
the work:
- Break the pitch into tasks at the start.
- Expect the task list to change — that is normal.
- When scope grows, apply scope hammering: ask "is this strictly necessary to ship?"
- Move non-essential work to future pitches. Do not silently expand cycle scope.
Scope Hammering Questions
- Is this required for the core use case described in the pitch?
- Does removing this break anything the user explicitly needs?
- Can we ship without it and add it later without penalty?
If the answer to the last two is "yes", cut it.
Circuit Breaker
Shape Up uses a circuit breaker instead of deadlines: if work is not done at the end of the
cycle, it does not automatically roll over. The team stops, the work is evaluated, and only
a re-bet puts it back into a cycle.
Invoke the circuit breaker when:
- The cycle ends and the work is significantly incomplete
- New scope has expanded the work beyond the original appetite
- A rabbit hole was hit that would require a new bet to resolve
Cooldown
The two weeks between cycles are for slack, fixes, and exploration — not continuation of cycle
work. Do not use cooldown to finish incomplete cycle work without a new bet.