Spec-Driven Collab Board
Authoritative inputs
docs/todos/README.md
docs/todos/templates/change_execution_todo_template.md
docs/guides/Team_Agent_Collab_Playbook.md
docs/todos/project_overall_todos.md
docs/design/TODO_INDEX.md
openspec/changes/<change-id>/tasks.md
docs/features/<change-id>.md when present
Core rule
Treat Claim Ledger as the outer ownership record and docs/todos/YYYY-MM-DD_<change-id>_execution_todos.md as the inner coordination board for an active change.
Do not turn docs/todos/project_overall_todos.md into a work-package task board.
Do not claim work directly from docs/design/TODO_INDEX.md.
Workflow
- Confirm the change state before editing any board.
- Read
openspec/changes/<change-id>/tasks.md.
- Read
docs/features/<change-id>.md when it exists.
- Read the matching initiative entry in
docs/todos/project_overall_todos.md when one exists.
- Read the corresponding
Claim Ledger entry and confirm the TODO scope is already claimed.
- If tasks are complete and the feature or roadmap status is
done, do not create a new active board for that change.
- Decide whether an execution board is needed.
- If the change is single-owner, has no shared-contract risk, and does not need Gate sequencing, report that no execution board is required and stop.
- Otherwise continue and choose exactly one board action.
create: no execution board exists for an active change.
refresh: an execution board exists but its gates, work packages, or evidence links are stale.
historical-reference: the change is completed or superseded and the old board should remain only as reference.
- Create or refresh the board from the template.
- Use
docs/todos/templates/change_execution_todo_template.md as the structural baseline.
- Name the file
docs/todos/YYYY-MM-DD_<change-id>_execution_todos.md.
- Keep the status explicit:
active, blocked, archived, or historical reference.
- Prepare the board as part of a docs-only intent PR payload; a local-only board is not sufficient coordination.
- Include these sections unless there is a strong reason not to:
- usage rules
- context and scope boundary
- Gate freeze summary
- work-package coordination board
- subtask acceptance tables
- interface compatibility matrix
- integration and closeout
- maintenance rules
- Split work at the work-package level, not at the bullet level.
- Create
2-5 work packages for one change.
- Target
0.5-2 days of work per package.
- Give each package one owner, one main goal, one declared touch scope, and one freeze boundary.
- Keep subtasks small for acceptance and evidence mapping, but do not use them as the default claim unit.
- Apply Gate rules before allowing parallel work.
- Shared contracts must freeze before downstream packages begin dependent implementation.
- A package should cross at most one Gate.
- If two developers need the same schema, payload, enum, state machine, or audit contract, split into upstream freeze work and downstream implementation work.
- Keep the board synchronized with the surrounding governance documents.
project_overall_todos.md remains roadmap plus outer Claim Ledger; it must not absorb work-package detail.
TODO_INDEX.md remains backlog-only.
- The execution board must link back to the OpenSpec change and reflect the same completion state as
tasks.md.
- The execution board should be ready before the docs-only intent PR is raised, and that intent PR must merge before implementation starts.
- If a package moves to
review or done, update evidence on the same day.
- Downgrade completed boards instead of pretending they are still active.
- Change the title and status to make the historical role obvious.
- State why the board is no longer active.
- Point future coordination to the currently active change when one is known.
Board quality checks
Before claiming the board update is complete, verify:
- the chosen change is still active if the board is marked
active
- the outer
Claim Ledger entry exists and names the same TODO scope / change-id
- each work package has
WP, Goal, Owner, Depends On, Touch Scope, Freeze Gate, Status, Branch/Worktree, PR, Evidence, and Last Updated
- subtask tables map back to OpenSpec task IDs, gap IDs, or testable acceptance points
- the board does not duplicate work-package detail into
project_overall_todos.md
- the board and
openspec/changes/<change-id>/tasks.md do not contradict each other
- the board is suitable to ship in a docs-only intent PR without implementation code
Output expectations
Report:
- which action was taken:
create, refresh, or historical-reference
- why this change is the correct active or historical board target
- which files were created or updated
- whether an execution board was actually required
- what still needs owner assignment, evidence, Gate freeze, or intent-PR merge
Examples
Use these boards as references when the structure is unclear:
docs/todos/agentscope_domain_execution_todos.md
docs/todos/templates/change_execution_todo_template.md