| name | SI-13(3)_manual-transfer-between-components |
| description | Manually initiate transfers between active and standby system components when the use of the active component reaches [organization-defined] of the me |
| category | input-validation |
| version | 5.2.0 |
| author | cyberstrike-official |
| tags | ["nist","sp800-53","rev5","si-13-3","si","enhancement"] |
| tech_stack | ["aws","azure","gcp","linux","windows"] |
| cwe_ids | ["CWE-20"] |
| chains_with | [] |
| prerequisites | ["SI-13"] |
| severity_boost | {} |
SI-13(3) Manual Transfer Between Components
Enhancement of: SI-13
High-Level Description
Family: System and Information Integrity (SI)
Framework: NIST SP 800-53 Rev 5
For example, if the MTTF for a system component is 100 days and the MTTF percentage defined by the organization is 90 percent, the manual transfer would occur after 90 days.
What to Check
How to Test
Step 1: Review Documentation
Examine the System Security Plan (SSP) and related artifacts for SI-13(3) implementation details. Verify the organization has documented how this control is satisfied.
Step 2: Validate Implementation
# For cloud environments, use cloud-audit-mcp tools
# For on-premises, review system configurations directly
# Example: Check if account management policies exist
grep -r "account.management\|access.control" /etc/security/ 2>/dev/null
Step 3: Test Operating Effectiveness
Verify the control is actively functioning, not just documented. Check logs, configurations, and operational evidence.
Tools
| Tool | Purpose | Usage |
|---|
| cloud-audit-mcp | Check integrity monitoring | cloud_audit_monitoring |
| AWS CLI | Review GuardDuty/Inspector | aws guardduty list-detectors |
Remediation Guide
Control Statement
Manually initiate transfers between active and standby system components when the use of the active component reaches [organization-defined] of the mean time to failure.
Implementation Guidance
For example, if the MTTF for a system component is 100 days and the MTTF percentage defined by the organization is 90 percent, the manual transfer would occur after 90 days.
Risk Assessment