| description | Use when a validated spec exists but no validated plan yet โ to translate the spec into a micro-stepped, parallel-grouped implementation plan and pass it through an adversarial plan gate before any code is written. Symptoms - "write the plan", "how do we build this", supervisor Phase 2, a plan.md that has not yet passed plan-validation. |
Phase 2 โ Planning (Plan + Plan Gate)
Overview
Produce a validated plan.md. Delegate authoring to architect (which maps the spec onto the real
codebase and writes a micro-stepped plan with safe parallel groups and test-first steps), then attack
the plan with plan-validator, whose skeptics assume the plan will fail and read the
source to find the first domino. No execution until the plan gate is clean and the user approves.
Precondition
spec.md exists and the spec gate is clean (validation/spec-validation.md), or a documented trivial
fast-path. See Supervisor โ Contract 1 & Contract 3.
Inputs
plans/active_milestones/{moniker}/spec.md
plans/active_milestones/{moniker}/context.md
Steps
- Delegate
architect (Supervisor โ Contract 2). Provide the spec.md and context.md paths. It
investigates the codebase read-only and writes:
plans/active_milestones/{moniker}/plan.md โ analysis, parallel task groups (tasks in a group
must not touch the same files), and explicit step-by-step details with exact paths + test commands;
- optionally
data-model.md / api-contracts.md.
- Plan gate (Supervisor โ Contract 3). Delegate
plan-validator with the plan.md
path and the repository root (its skeptics must open the files the plan assumes). Aggregate the
2-of-3 verdict and persist it to plans/active_milestones/{moniker}/validation/plan-validation.md,
recording the first_domino.
- For each confirmed finding, loop back to
architect to apply its fix (reorder steps, insert a
missing prerequisite, correct a false assumption about existing code), then re-run the gate once.
- Surface unconfirmed findings to the user.
- Hand to the ๐ Planning gate (Supervisor โ Contract 4). Once the plan gate is clean, STOP and let
the Supervisor present
spec.md + plan.md for explicit user approval.
Exit Gate
plan.md exists and validation/plan-validation.md is clean (the first_domino and all confirmed
findings resolved). User approval is then pending at the Supervisor's Planning gate.
Hand-off
construction reads plan.md once the user approves.
Constraints
- READ-ONLY codebase โ
architect plans, it never edits source.
- No commits in this phase.
- Explicit verification โ every task carries a concrete test command, never "ensure it works".
- Safe parallelism โ tasks within a group must be independent (no shared files).
Red Flags
| Thought | Reality |
|---|
| "Plan reads cleanly, skip the gate." | Clean prose hides dead assumptions. Run plan-validator. |
| "A skeptic says step 3 is wrong but cited no line." | Unverified prediction = guess. Require file:line or re-check before reordering. |
| "Let me start coding to save time." | No execution before the plan gate is clean and the user approves. |
| "I'll group everything into one big step." | Micro-step it; group only independent tasks for parallelism. |