Skip to main content

aposd-optimizing-critical-paths

Optimize performance through mandatory measure-first workflow with 3 stages: MEASURE (gate) -> FUNDAMENTAL FIX -> CRITICAL PATH REDESIGN. Use when code is too slow, laggy, hangs, doesn't scale, has timeouts, OOM errors, or high CPU/memory. Emphasize that simpler code usually runs faster. Triggers on: performance issues, optimization needed, takes forever, profiling. Produces profiling-backed optimization with verified improvement.

Jump to install

Source facts

Repository
diegosouzapw/awesome-omni-skill
Last source activity
March 2, 2026 at 06:27
Detected SKILL.md language
English
Stars
50
Forks
19

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.