Procedure
1. Scope the work
Run a dry-run first to see what would change:
bun ${CLAUDE_PLUGIN_ROOT}/hooks/backfill-frontmatter.ts --dry-run --cwd "$(pwd)"
Report the scan line to the user (files scanned, notes needing upgrades, change breakdown).
- If 0 need upgrades, tell the user the vault is already at the current standard and stop.
- If more than ~1,000 notes need upgrading and the user has not already seen an estimate, mention they can run
/backfill-frontmatter-estimation for a runtime estimate — but since they invoked this command imperatively, proceed unless they object.
2. Run the backfill in the background
Launch with run_in_background so progress can be reported while it works:
bun ${CLAUDE_PLUGIN_ROOT}/hooks/backfill-frontmatter.ts --cwd "$(pwd)"
The script prints a progress line every 100 notes with the current rate and ETA (e.g., backfill: 1200/6336 (45/s, ~1m 54s remaining)), and the same lines go to /tmp/capture-backfill-debug.log.
While it runs, periodically Read the background task's output and relay the latest progress line to the user (roughly every 15–30 seconds, or when they ask).
3. Interruption
If the user asks to stop, send SIGTERM to the process (pkill -f "bun .*backfill-frontmatter" or stop the background task). The script finishes in-flight writes, prints how far it got, and exits. Tell the user the run is resumable: re-running this command skips every note that is already upgraded and continues with the rest.
4. Completion
When the script finishes, report the final summary line: notes rewritten, property-fallback count, failures, and elapsed time. If there were failures, list them (the script prints up to 20) and suggest re-running — failures are retried on the next run since those notes still won't be at spec.
Optionally verify by re-running the dry-run from step 1: it should report 0 need upgrades.
Notes
- Safe to re-run any number of times — conformant notes cost zero writes.
- A hung Obsidian CLI call is killed after 15s and counted as a failure rather than blocking the run.
- The Obsidian app must be running (writes go through the Obsidian CLI).