| name | ring:running-dev-cycle |
| description | Running the backend dev cycle: implements every task in a rolling-wave plan.md (ring:writing-plans format) for a Go/TS service, driving specialist agents through Gate 0 implementation/TDD, Gate 8 parallel review, and Gate 9 validation per epic, elaborating later phases at each phase boundary. Use when starting or resuming a gated backend dev cycle with a plan.md (legacy tasks.md only for cycles already in flight; new cycles need the canonical plan format). Skip for frontend (use ring:running-dev-cycle-frontend) or docs-only work. |
Development Cycle Orchestrator
When to use
- Starting a new development cycle with a phased plan (plan.md from pre-dev or standalone ring:writing-plans)
- Resuming an interrupted development cycle
- Need structured, gate-based epic execution with quality checkpoints and phase cadence
Skip when
- No plan file exists AND the Lerian Map is not the task source (in
lerian_map mode no local plan is required — the cycle materializes one from the board)
- Task is documentation-only or planning-only
- Frontend project (use ring:running-dev-cycle-frontend instead)
You orchestrate. Agents execute. You NEVER read, write, or edit source code directly.
How This Works
Load the phased plan (plan.md, ring:writing-plans canonical format) and execute the lean backend cycle. Exception — board as source: when cycle-init question 3 (Task source) = Lerian Map (board is the source), do NOT require a plan path — run the Init flow in ## Lerian Map as Task Source (optional) to materialize the derived plan first, then proceed identically against it. The plan is rolling-wave phased: a ## Phase Overview table (phases + milestone + status), phase sections containing ### Epic N.M: headings (each epic carries a **Status:** line: Pending/Doing/Done/Failed), and inline dispatch-ready #### Task N.M.T: blocks written under each epic of the currently-detailed wave. Only the active wave is task-detailed; later phases are epic-level and get elaborated at each phase boundary. Backend implementation owns local runtime and quality so the flow does not dispatch separate QA, SRE, or DevOps gates.
Vocabulary: Phase = independently verifiable checkpoint (internal rolling-wave structure — NOT a Map milestone). Epic (Epic N.M) = value-driven increment, the UNIT this cycle iterates. Task (Task N.M.T) = dispatch-ready unit, the Gate 0 execution unit.
Announce at start: "Using ring:running-dev-cycle lean backend flow (rolling-wave phased plan)."
Gate Map
| Gate | Skill to Load | Agent to Dispatch | Cadence | Mode |
|---|
| 0 | ring:implementing-tasks | ring:backend-go / ring:backend-ts | Per task (Task N.M.T) | Write + Run |
| 8 | ring:reviewing-code | 9 default reviewers + triggered specialists in parallel | Per epic (Epic N.M) | Run |
| 9 | ring:validating-acceptance-criteria | N/A (verification) | Per epic | Run |
| 11.5 | (orchestrator + 1 planning agent) | ring:backend-go / ring:backend-ts / ring:frontend / ring:codebase-explorer (ANALYSIS mode) | Per phase boundary | Plan only |
Gate 0 includes TDD RED/GREEN, coverage threshold enforcement, docker-compose/local runtime updates, basic health/observability verification, and delivery verification. Do not dispatch separate QA, SRE, or DevOps gates as part of this cycle. Step 11.5 (phase cadence) closes the just-finished phase and rolling-wave elaborates the next phase's epics into dispatch-ready tasks — read gates/phase-boundary.md.
Execution Order
for each phase (current wave; starts at Phase 1, the only detailed phase at init):
for each epic in this phase (plan order):
for each task:
Gate 0
[checkpoint if manual_per_task mode]
Gate 8
Gate 9
Final Test Confirmation → Multi-Tenant Verify → Migration Safety (Gate 0.5D, conditional) → dev-report → Final Commit
Gate Execution Workflow
For EVERY gate, follow this exact sequence:
1. Read gate-specific instructions → Gate 0: Read("gates/gate-0-implementation.md"); Gate 8: Read("gates/gate-8-review.md"); Gate 9: Read("gates/gate-9-validation.md"); Phase boundary (Step 11.5): Read("gates/phase-boundary.md")
2. Load sub-skill → Skill("ring:{sub-skill-name}")
3. Follow sub-skill dispatch rules → Sub-skill tells you HOW to dispatch
4. Dispatch agent → Task(subagent_type="ring:{agent}", ...)
5. Validate agent output → Per sub-skill validation rules
6. Update state → Write to current-cycle.json
7. Next gate or checkpoint
Never dispatch an agent without loading the sub-skill first.
Never skip from standards → agent directly. Always: standards → sub-skill → agent.
Standards Loading
At cycle start (Step 1.5), pre-cache Ring standards:
- WebFetch the standards index for the project language (e.g.,
golang/index.md)
- Store cached standards in
state.cached_standards
- Pass relevant modules to agents at dispatch time — do NOT re-fetch per gate
Orchestrator Boundaries
You CAN: Read task/state files, write state files, track progress, dispatch agents, ask user questions, WebFetch standards.
You CANNOT: Read/write/edit source code (*.go, *.ts, *.tsx), run tests, analyze code directly, make architectural decisions.
If a task involves source code → dispatch specialist agent. No exceptions regardless of file count or simplicity.
State Management
State lives in docs/ring:running-dev-cycle/current-cycle.json (or docs/ring:planning-backend-refactor/current-cycle.json).
For state schema, persistence rules, and initialization logic, read gates/state-schema.md from this skill directory.
Critical rule: Write state after EVERY gate completion. If state write fails → STOP. Never proceed without persisted state.
PROJECT_RULES.md Check
Before starting any gate execution, verify docs/PROJECT_RULES.md exists.
For the full verification process and template creation flow, read gates/project-rules-check.md from this skill directory.
If PROJECT_RULES.md doesn't exist → create it using the Ring template before proceeding.
Cycle Completion
When the epic loop finishes the LAST phase (last epic of the last phase passed all its gates AND that phase's boundary at Step 11.5 found no next phase to elaborate), the cycle is NOT done — a completion phase runs once.
Read gates/cycle-completion.md from this skill directory and execute Steps 12.0–12.1 in order:
- Step 12.0 — Cycle Exit Verification (HARD GATE: every Gate 0 handoff has passing tests, coverage ≥ threshold, local runtime; plus multi-tenant dual-mode verified for all units)
- Step 12.0.5b — Gate 0.5D Migration Safety (conditional: runs only when SQL migration files appear in the cycle diff vs
origin/main)
- Step 12.1 — the one-and-only
ring:writing-dev-reports dispatch, then Final Commit (which captures the feedback it generates)
⛔ The cycle is incomplete until Step 12.1 finishes. Do NOT declare the cycle done from the Execution Order summary alone — the detailed, mandatory steps live in gates/cycle-completion.md.
Execution Modes
Ask user at cycle start (independent questions, in the order given at the end of this section):
1. Execution mode (epic/task checkpoint cadence):
| Mode | Behavior |
|---|
automatic | All gates execute, pause only on failure |
manual_per_epic | Checkpoint after each epic completes all gates |
manual_per_task | Checkpoint after each task completes task-level gates |
2. Phase checkpoint (state.phase_checkpoint):
| Value | Behavior |
|---|
manual (default) | At each phase boundary (Step 11.5), AskUserQuestion: Continue / Pause / Adjust plan first |
auto | At each phase boundary, log a phase summary and continue (still elaborates the next phase) |
Mode and phase_checkpoint affect CHECKPOINTS (user approval pauses), not GATES. All listed gates execute regardless of mode. The phase boundary's elaboration step runs in BOTH phase_checkpoint values — only the pause differs.
3. Task source (state.task_source; see ## Lerian Map Sync (optional) and ## Lerian Map as Task Source (optional)):
Ask AFTER execution mode and BEFORE commit timing (the Map decision — esp. Done = push-to-develop — influences how the user thinks about commit cadence). The Map options are opt-in: users who don't use the Map pick Local plan and see zero behavior change (zero Gandalf calls, feature fully off).
⛔ HARD REQUIREMENT: single-select (multiSelect: false), exactly ONE option, explicitly selected by the user — NO silent default applied without asking.
AskUserQuestion:
question: "Where do this cycle's tasks come from?"
header: "Task source"
multiSelect: false
options:
- label: "Local plan"
- label: "Local plan + Map sync"
- label: "Lerian Map (board is the source)"
| Option | state.task_source | Behavior |
|---|
| Local plan | "plan_file" | plan.md is the source. No board involvement — set state.lerian_map_sync.enabled = false (or omit the object), skip the Testing-gate question, zero Gandalf/Map calls ever. Today's default behavior. |
| Local plan + Map sync | "plan_file_synced" | plan.md is the source; Ring PUSHES status + per-task checklist done to the board at the existing hooks (exactly the ## Lerian Map Sync (optional) behavior). Push targets: epic status → the EPIC card; task done → the card's checklist item (merge-by-id). This is the core preserved feature. Set state.lerian_map_sync.enabled = true, then ask the Testing-gate question, and run the discovery handshake before the first Gate 0. Rolling-wave: the handshake ensures checklist items only for tasks known at init; tasks elaborated in later phases get their checklist items ensured at the phase boundary (gates/phase-boundary.md Step 11.5.5b, step 1a) so their done flip has a target. |
| Lerian Map (board is the source) | "lerian_map" | The Lerian Map board IS the task source — see ## Lerian Map as Task Source (optional). DOWNGRADED (structurally forced): the board no longer holds per-task contracts (a Task is a checklist item — text + done only), so the cycle materializes a derived plan SKELETON from the feature's Desenvolvimento cards (epics ← cards + macro body, tasks ← checklist item names, all under a single Phase 1 — the board has NO phase concept, MUST NOT map milestones to phases) and the rolling wave elaborates the per-task contracts INTO the derived plan; a checklist item already done=true = "already complete, skip at Gate 0". Also set state.lerian_map_sync.enabled = true (source mode implies status sync) and ask the Testing-gate question. |
Resume backward compatibility: if an existing current-cycle.json has no task_source field, infer "plan_file_synced" when lerian_map_sync.enabled == true, else "plan_file". NEVER re-ask this question on resume.
4. Testing gate (OPTIONAL — only asked when the task source involves the Map (plan_file_synced or lerian_map); stored in state.lerian_map_sync.testing_gate):
AskUserQuestion:
question: "When a card reaches Testing, wait for your explicit OK before opening the PR (→ develop)?"
header: "Testing gate"
options:
- label: "Gate (wait)"
- label: "Bypass"
⚠️ Does NOT override Gate 9. Gate 9 (validation/acceptance) is a CRITICAL, non-bypassable gate that always requires explicit user approval per epic (Step 11.1). The Testing gate is a SEPARATE, Map-aware control over the manual-test wait before PR/develop — it can only relax that extra Testing wait, never the mandatory Gate 9 acceptance.
5. Commit timing (state.commit_timing ∈ {per_task, per_epic, at_end}): when commits happen during the cycle — see ## Commit Timing for what each value commits at which gate.
Resulting cycle-init question order: execution mode → phase checkpoint → Task source → Testing gate (only when the source involves the Map) → commit timing.
Custom Instructions
If user provides custom context at cycle start, store in state.custom_prompt and inject at the top of every agent dispatch:
**CUSTOM CONTEXT (from user):**
{state.custom_prompt}
---
**Standard Instructions:**
[... agent prompt ...]
Commit Timing
- Gate 0 (implementation): Commit after GREEN phase, coverage, docker-compose/local runtime, and delivery verification pass (
commit_timing == "per_task")
- Gate 8 (review): Commit fixes after all reviewers pass
- Gate 9 (validation): No commit (verification only); epic-level commit at Step 11.1 when
commit_timing == "per_epic"
- Cycle-end: Final commit with cycle metadata
commit_timing ∈ {per_task, per_epic, at_end}. Convention: feat|fix|test|chore(scope): description — keep commits atomic per gate.
Lerian Map Sync (optional)
OPTIONAL and opt-in. When enabled (cycle-init question 3 Task source = Local plan + Map sync, or implied by Lerian Map (board is the source) — see ## Lerian Map as Task Source (optional)), this feature keeps the Lerian Map kanban board in sync as epics/tasks move through the gates. When off (Local plan), the cycle behaves exactly as before — zero Gandalf calls. The feature never blocks gate execution and never weakens any mandatory gate (Gate 9 acceptance still requires explicit user approval per epic, regardless of the Testing-gate setting).
Mapping: Epic → Map task-card (tipo: Task); Task → checklist item ({id, text, done}) inside that card; card body = macro epic overview; checklist item text = task name. The epic card attaches to a milestone chosen by epic NATURE — a dev epic → the feature's Desenvolvimento milestone (resolved BY NAME within the feature). Plan Phase is internal rolling-wave only — NOT a Map entity (MUST NOT map Phase → milestone). See ## Lerian Map as Task Source (optional) → Hierarchy mapping for the full table.
⛔ Two directions of sync — only ONE is the core feature here:
- Ring → Map (PUSH): PRESERVED — the core feature. During the cycle the dev-cycle automatically updates the EPIC card status (
in_progress at epic start → testing → to_review → done at push-to-develop) and flips each checklist item done=true as its task completes. Async, fire-and-forget, idempotent. What is preserved is the ASYNC FIRE-AND-FORGET semantics (idempotent, never-block); the TARGETS moved — status now targets the epic card_id (not a per-task card), and per-task completion is now a checklist item done merge-by-id (not a per-task card update).
- Map → Ring (board-as-source): DOWNGRADED. Only the
lerian_map mode (board-as-source) changes: the board seeds the SKELETON (epic + task names + macro overview); the dispatch-ready contracts come from the derived plan.md, NOT from the Map. See ## Lerian Map as Task Source (optional).
Hard rule: the synced status follows the real board columns exactly — no invented stand-in statuses. Column enum strings are read from the board at runtime via Gandalf, never hardcoded.
Discovery handshake (run once, after the cycle-init questions, before the first Gate 0)
When state.lerian_map_sync.enabled, run a one-time handshake (each Gandalf ask is a fresh, self-contained session carrying the full discovery payload):
- Resolve the acting user (local — no Gandalf call; both Map modes): the human this cycle's board writes are attributed to. Primary source:
git config user.email + git config user.name in the repo (matches who signs the cycle's commits; per-machine, so a different person running the cycle in their clone is attributed automatically). Fallbacks in order: the session user's email when git config is unset; else unresolved. Store state.lerian_map_sync.acting_user = {email, name, source, resolved_at} — or object-level acting_user = null when unresolved (no partial record; see gates/state-schema.md). Best-effort — an unresolved identity NEVER blocks the cycle (see ### Author attribution (on-behalf-of)).
- Anchor on the Feature, resolve
featureId + the Desenvolvimento milestone. Discovery is repo-driven: map the local git remote to a product via the Map's native repositoryUrl field on GET /products (no manual productId/teamId/milestoneId). Normalize the remote first (git@github.com:org/repo.git → https://github.com/org/repo). Then resolve WHICH Feature (GET /features for the product): match by name; if more than one candidate, AskUserQuestion to pick among the product's features. Record featureId. ⛔ The HUMAN creates the Feature (in the Map UI, which copies the fixed milestone template) — the flow MUST NOT create or edit the Feature. From the resolved feature's milestones, resolve the Desenvolvimento milestone BY NAME → dev_milestone_id (+ dev_milestone_name). If Desenvolvimento cannot be resolved on the feature → STOP and surface to the user — MUST NOT create milestones (they come from the template). Fetch any existing cards under (featureId, dev_milestone_id) with each card's body (macro overview), checklist ({id, text, done}[]), and status.
- CREATE one task-card per epic under
(featureId, dev_milestone_id), each carrying a checklist of its task names (+ macro body in lerian_map; in plan_file_synced the body is user-owned, optional). Cards already on the board are MATCHED, not duplicated — the deterministic key is the [map:#<card_id>] tag embedded at the epic level in the plan; title-matching by epic name is the fallback when no tag is present. CREATE only the epics that have no matching card. Each Task maps to a checklist item inside its epic's card, by checklist_item_id (or item text ↔ task name on first match); ensure one checklist item exists per task (merge-by-checklist_item_id, create-if-absent keyed by text = task name, NEVER array-replace) so every Task has a done target. Creating the cards and their checklist items is a Ring → Map PUSH (the preserved write direction) — NOT a contract READ; the Map → Ring downgrade is only about no longer reading dispatch-ready contracts FROM the board.
- Preview the create plan ONCE + confirm. Show ONE preview table of the full create plan — the N cards to create + each card's checklist (and, for already-present cards, the matched local epic ↔ card with its current column) — and ask the user OK. Only AFTER the user confirms: create the missing cards/checklist items. Record each
card_id + checklist_item_id. MUST NOT create the Feature or any milestone in this step.
- Auto-inject tags (with confirmation). After the cards exist, inject the resolved
[map:#<card_id>] tags into the plan at the epic level so future runs are deterministic and rename-proof.
- Persist the mapping (
featureId, dev_milestone_id, epic_matches[] + task_matches[]) + the board's real status enum into state.lerian_map_sync (see gates/state-schema.md). In the same ask, instruct Gandalf to set the product/card repositoryPath to the repo URL — set-if-empty, best-effort, once per cycle (see ### Evidence & enrichment).
Discovery path that works (validated): repo → /products(repositoryUrl) → /features (resolve the feature → featureId) → resolve "Desenvolvimento" milestone (by name → dev_milestone_id) → POST/GET /tasks?featureId&milestoneId (epic-cards, create-with-preview, matched by name + [map:#<card_id>] tag) → card.checklist (items).
Status mapping (dev-cycle stage → real board column)
Status pushes target the EPIC card (card_id). The per-task done=true flip targets the checklist item (checklist_item_id) inside that card.
| Dev-cycle event | Target | Board state | Notes |
|---|
| Epic loaded, not started | epic card | To do | baseline; only set if currently in Backlog |
| Epic Gate 0 start (first task of the epic begins) | epic card | In Progress | epic is actively being built; the push sends the absolute target column In Progress, and the cycle applies a guard so it does not regress a card already further along (only advances from Backlog/To do). Pushed ONCE per epic — the once-per-epic local guard is tracked via epic_matches[].status_dispatch |
| Epic validated (Gate 8 review + Gate 9 pass), awaiting user manual test | epic card | Testing | the "Em Teste" the user actually tests; STAYS here through approval. Gate 8 is an INTERNAL dev-cycle review — it does NOT get its own board column. |
| User approved → PR opened, awaiting human merge-review | epic card | To Review | matches the board order Testing → To Review → Done |
PR merged → committed AND pushed to repo (≥ develop) | epic card | Done | ⭐ the ONLY trigger for Done — the push-to-develop / PR-merge event, NOT Gate 9 |
Per-task completion at push-to-develop (≥ develop) | checklist item | done=true | flip the completed task's checklist item; MERGE-BY-checklist_item_id (read-modify-write), NEVER replace the array. Same terminal trigger as the epic done status, NOT Gate 9. |
| A gate fails hard / external blocker | epic card | Blocked | off-path |
| Cycle parked for non-blocking reasons | epic card | On Hold | off-path / optional / manual |
| Epic dropped | epic card | Canceled | off-path / optional / manual |
Lifecycle (monotonic, matches board column order): To do → In Progress → Testing → To Review → Done on the epic card, with Blocked/On Hold/Canceled off-path.
The Testing → To Review hop depends on the Testing gate (cycle-init question 4):
gate (wait): card parks in Testing; the cycle waits for the user's OK, then opens the PR → To Review. (SLC rule — human tests the epic before the PR.)
bypass: the card still passes through Testing (status is set) but the cycle does not block; it auto-opens the PR → To Review. Gate 9 acceptance still applies — bypass only relaxes the manual-test wait, never Gate 9.
Gandalf integration mechanics
All Map I/O goes through the Gandalf webhook (ring:delegating-to-gandalf) — never a direct Map API call from dev-cycle. This keeps the dev-team plugin free of Map credentials / instance coupling and works for any Map instance. No new agent and no new credential are introduced; the existing webhook is reused.
- Self-contained prompts: every ask is a fresh Gandalf session — each message carries the discovery payload (repo, epic/card name, task names, card_id, checklist_item_id) and the absolute target column (or the checklist item to flip).
- Fetch + enum read: the first ask returns both the matched cards AND the list of valid status values for that board (so column strings are never hardcoded).
- Status push — ASYNC FIRE-AND-FORGET (never blocks dev): at each checkpoint the dev-cycle sends ONE webhook POST and immediately gets back a
task_id; Gandalf's background worker performs the actual board update. The dev-cycle does NOT poll or wait — it records the dispatch and continues to the next gate/task. The slow work lives on Gandalf's side, off the critical path.
- Checklist push — MERGE-BY-ID (idempotency, MANDATORY): the per-task
done=true flip is a read-modify-write on the card's checklist array — instruct Gandalf to locate the item by checklist_item_id, set its done, and PATCH the array. ⛔ It MUST NEVER replace the whole array (that would drop sibling items). A retried push re-asserts the same item id safely. Status pushes, by contrast, are absolute-column on the card (status = X).
- Visible dispatch log line: when the hook fires, log a line so the user sees it working in the background, e.g.
🔄 Lerian Map Sync: dispatched Epic 1.1 → In Progress (card #1222, gandalf task a1b2c3, background)
and record {task_id, dispatched_at, state: "dispatched"} in current-cycle.json.
- Author attribution: every write ask carries the acting-user attribution line — see
### Author attribution (on-behalf-of).
Author attribution (on-behalf-of)
Without attribution, every board write shows Gandalf's own Map account as the author instead of the person running the cycle. The Map API supports impersonation (X-On-Behalf-Of header + an impersonate-scoped key — validated via live probe) and has user-lookup endpoints to resolve email → userId. The key/auth is Gandalf's internal concern — Ring never sees or stores any secret.
Rule — EVERY write ask (epic-card status pushes, checklist done flips, date stamps, repositoryPath, macro-body write-backs, comment POST/UPDATE) includes one line:
Attribute this write to the user with email {acting_user.email} ({acting_user.name}) — resolve to the Map user and write on their behalf (X-On-Behalf-Of). If impersonation is unavailable, write under your own identity and — for comments only — prepend the first line _em nome de {name} <{email}>_ yourself.
When name is null (session source), omit the parenthesized name and use the email alone — in both the attribution line and the em-nome-de line (_em nome de <{email}>_).
Email → Map userId resolution is Gandalf's job at write time — Ring stores NO Map userId, keeping it free of Map user-table coupling. The acting user comes from state.lerian_map_sync.acting_user, resolved once at handshake step 0. This rule lives HERE only — the hook sites already say "the same ask/push carries…"; do NOT repeat the attribution line per hook.
Fallback (never a strict point) — two branches:
- Impersonation unavailable — handled GANDALF-side via the template line above (Ring never sees write outcomes — pushes are fire-and-forget — so the conditional must run where the outcome is known): the write proceeds under Gandalf's own identity, and comments alone gain the
_em nome de {name} <{email}>_ line, prepended ABOVE the template's first line (the comment cap becomes ~11 lines in fallback mode). Status / date / checklist writes proceed without attribution.
acting_user is null — handled RING-side (no line possible — the user is unknown): omit the attribution line entirely; all writes proceed under Gandalf's identity, with no em-nome-de line.
Neither branch is ever a strict point — NEVER blocks.
UPDATEs × attribution: UPDATEs preserve an existing em nome de first line verbatim and never add one to an attributed comment; instruct Gandalf to perform the UPDATE under the same identity that authored the comment (falling back to its own identity only if that fails — best-effort).
Graceful degradation + deferred reconciliation
Map sync never blocks gate execution. Each transition moves through three states:
pending → the dev-cycle wants this column but hasn't fired the hook yet (or the POST failed)
dispatched → the webhook POST succeeded; Gandalf has a task_id and is updating in background (NOT yet confirmed)
synced → confirmed applied on the board
State tracks, per matched unit, desired_status (what the dev-cycle wants) vs synced_status (last confirmed), the dispatch record (task_id, dispatched_at, state), plus an ordered pending queue (state.lerian_map_sync.pending) and a degraded flag.
Rules:
- Fire, don't wait: at a checkpoint, POST the transition → on a successful POST, mark
dispatched with the task_id and move on immediately (no polling).
- POST itself fails (Gandalf unreachable / off-Tailscale / timeout): keep the transition
pending, set degraded: true, log a warning, continue the cycle.
- Best-effort verification (non-blocking): opportunistically — at the next checkpoint, on
--resume, and at end of cycle — do ONE batched read of outstanding dispatched task_ids; any that completed flip to synced. Never blocks; if the read fails, items stay dispatched and are re-checked later.
- Drain pending: at the same triggers, retry
pending transitions (oldest → newest). A Gandalf that comes back mid- or post-cycle gets the board caught up automatically; when nothing is pending, clear degraded. Rules 3–4's triggers cover epic_matches[].body_dispatch records (macro-overview pushes) and task_matches[].done_dispatch records (checklist done flips) identically — see gates/state-schema.md — outstanding body and done pushes are verified and drained in the same batched pass.
- Idempotent pushes: each STATUS push sets an absolute column on the card (status = X), never a relative move — safe to replay even if a partial update landed. Each CHECKLIST
done push MERGES BY checklist_item_id (read-modify-write) and MUST NEVER replace the whole array — also safe to replay.
- End-of-cycle report: print outstanding items at Step 12.1, e.g.
⚠️ Lerian Map Sync: 2 dispatched (awaiting confirmation), 1 pending (Gandalf was down).
Checkpoint hooks (where the async push fires)
When state.lerian_map_sync.enabled, the orchestrator fires the async, fire-and-forget board push at these existing checkpoints (each is non-blocking and never gates execution):
| Cycle event | Hook location | Target + value pushed |
|---|
| Epic start (first task of the epic's Gate 0 begin) | gates/gate-0-implementation.md Pre-Dispatch checkpoint (fires ONCE per epic — guard against re-pushing per task) | epic card_id → in_progress |
| Epic validated, awaiting user test (Gate 9 pass → Step 11.1) | gates/gate-9-validation.md Step 11.1 | epic card_id → testing (stays here through approval) |
| User approved → PR opened | Step 11.1 advance (and end-of-cycle / PR-open path) | epic card_id → to_review (gated by testing_gate) |
Push to repo ≥ develop (PR merge) | gates/cycle-completion.md Step 12.1 (Final Commit / push) | epic card_id → done — ONLY trigger for done, NOT Gate 9 |
| Per-task done at push-to-develop | gates/cycle-completion.md Step 12.1 (rides the done push, per completed task) | each completed task's checklist_item_id → done=true (MERGE-BY-id, never array-replace) |
Task commit moment (per commit_timing) | gates/gate-0-implementation.md Gate 0 completion (per_task) / gates/gate-9-validation.md Step 11.1 epic commit (per_epic) / gates/cycle-completion.md done push (at_end) | — none (comment-only ask: the task evidence comment POST — see ### Evidence & enrichment) |
| Hard block at any gate | Blocker Handling | epic card_id → blocked |
The epic-in_progress and epic-done pushes also stamp start/end dates and carry the enrichment instructions — see ### Date stamping (start/end) and ### Evidence & enrichment below.
Date stamping (start/end)
The Map UI has INÍCIO (start) and FIM (end) date columns on task-cards. Since an Epic IS a task-card, dates are stamped on the epic card. Checklist items have NO date fields — there are no per-task dates. When sync is enabled (BOTH plan_file_synced and lerian_map — the hooks are shared), the existing epic-status pushes also stamp these dates so the board reflects real execution timing. Dates ride INSIDE the existing pushes — same Gandalf ask, same fire-and-forget posture, same degradation/reconciliation rules: no new push types, no new strict points, no impact on never-block. A failed push retries dates together with the status via the existing reconciliation. The date value is captured when the transition is first queued/dispatched and carried in the push payload — a retried push stamps the original event date, never "today at retry time" (a payload field on the queued transition, not a new dispatch record). Card fields are startDate / endDate (date YYYY-MM-DD, nullable — validated via live Gandalf probe).
| Date | Riding push | Rule |
|---|
Epic card startDate | epic in_progress (epic Gate 0 start, once per epic) | Set to the event date ONLY if currently null/empty. NEVER overwrite a manually set date. |
Epic card endDate | epic done (push-to-develop) | Set if empty or future; keep existing past dates. |
No new state: date stamping is idempotent by construction (set-if-empty), so it does NOT need its own dispatch record — do NOT invent one. The status dispatch and body_dispatch records (gates/state-schema.md) remain the only sync-state tracked.
Evidence & enrichment (comments, repositoryPath)
Beyond columns and dates, the pushes also fill everything else the Map API supports today. API facts (live Gandalf probe): task-card comments exist (POST /tasks/{id}/comments, markdown body ≤ 10,000 chars, CRUD) and cards carry a repositoryPath. Since an Epic IS a task-card, all evidence comments post on the EPIC card — there are no separate per-task cards (tasks are checklist items, which have no comments). Per-task evidence is therefore tagged inside the epic card's comments with a **Task N.M.T:** prefix. Everything below rides the existing pushes/asks (fire-and-forget, existing degradation; comments excepted from retry — see the rule below): no new STATUS push types — the single addition is one comment-only ask at each task's commit moment — no new strict points, no new state records.
Evidence comments — post on the EPIC card; max ONE comment per epic card per event (no spam):
| Event | Card | Comment content |
|---|
Task completed — POSTs ONCE, at the task's COMMIT moment per commit_timing: per_task → Gate 0 completion (after delivery verification + commit); per_epic → the Step 11.1 epic commit; at_end → the done push (full evidence posted then). Commit SHAs therefore always exist at POST time. | Epic card | ONE consolidated comment tagged **Task N.M.T:**: commit SHA(s), TDD evidence (tests added, coverage % vs threshold), verification command + outcome, PR link when available. A still-pending PR link is filled in at the to_review push (when the PR opens) via comment UPDATE; the done push re-asserts it idempotently — never a second comment. Template below. |
| Epic approved (Gate 9 pass → Step 11.1) | Epic card | ONE comment: review summary (reviewers passed, findings fixed), aggregated criteria PASS, PR link. The epic card always holds the per-task comments AND this epic-level approval comment — both on the same card. |
Task skipped by the Map Body Hard Gate (gates/gate-0-implementation.md Step 2.1.5 option b) | Epic card | ONE comment tagged **Task N.M.T:** alongside the existing epic blocked push (only if the whole epic is blocked): "skipped: no implementation contract (empty/insufficient plan task block)". |
Task-completed comment template (compact markdown, ~10 lines max — **Task N.M.T:** tag identifies which task on the shared epic card):
**Task 1.1.1 ✅ completed by dev-cycle**
- Commits: <sha1>, <sha2>
- Tests: <N added>, coverage <X%> (threshold <Y%>)
- Verification: `<command>` → <outcome>
- PR: <link | pending>
Idempotency/retry rule (comments only): comments are best-effort fire-and-forget and are NOT retried by the reconciliation — a retried push MUST NOT double-post a comment. Dates and status retry as already documented; comments don't.
UPDATE, never re-POST: after the initial POST, every later touch is a comment UPDATE — instruct Gandalf to locate the existing comment by its **Task N.M.T:** tag in the epic card's comment list. The lifecycle: POST once at the task's commit moment (table above) → a Gate 0 re-entry (Gate 9 criterion FAIL → rebuild) UPDATEs that task's existing evidence comment with the new evidence → the to_review push fills the pending PR link (into the per-task evidence comments AND the epic-approved comment) → the done push re-asserts the link idempotently. Max ONE comment per epic card per event (per task tag) holds in every path.
repositoryPath: during the discovery handshake persist step (step 5), instruct Gandalf to set the card/product repositoryPath to the repo URL — set-if-empty, best-effort, once per cycle (in lerian_map mode this rides the first ask after the init step 2 fetch).
Validated facts (live Gandalf test, 2026-06-11, br-slc)
-
Product discovery: GET /products exposes a native repositoryUrl field. https://github.com/LerianStudio/br-slc → productId=13 (SLC), teamId=5. Exact match, no ambiguity.
-
Feature + milestone resolution: GET /features for the product → resolve the Feature by name (AskUserQuestion if ambiguous) → featureId. The Feature is human-created and carries the fixed milestone template (Planejamento, Desenvolvimento, Documentação, Testes Internos, Teste Taura, Release). Resolve the Desenvolvimento milestone BY NAME within the feature → dev_milestone_id (e.g. id=433). The flow NEVER creates the Feature or milestones.
-
Epic (task-card) discovery + creation: GET /tasks?featureId&milestoneId=433 → existing task-cards (tipo: Task) matched by name + the [map:#<card_id>] tag → card ids 1222, 1223, …. The flow CREATEs the missing cards (POST /tasks under (featureId, dev_milestone_id), tipo: Task) after the one-time preview+confirm; statuses start todo.
-
Tasks (checklist items): each card carries a checklist array of {id, text, done} — tasks are matched to checklist items by id (or item text ↔ task name on first match). The checklist PATCH merges by item id.
-
Status enum (EXACT API slugs + ids):
| id | slug | label | terminal |
|---|
| 1 | backlog | Backlog | no |
| 2 | todo | To do | no |
| 3 | in_progress | In Progress | no |
| 8 | testing | Testing | no |
| 9 | to_review | To Review | no |
| 5 | on_hold | On Hold | no |
| 6 | blocked | Blocked | no |
| 4 | done | Done | yes |
| 7 | canceled | Canceled | yes |
-
Known frictions: no card slug (match by name — fragile → use [map:#<card_id>] tags at the epic level); the checklist PATCH must merge by item id (never array-replace); GET /teams currently returns 500 (use teamId from the tasks payload instead).
-
Discovery path: repo → /products(repositoryUrl) → /features (resolve the feature → featureId) → resolve "Desenvolvimento" milestone (by name → dev_milestone_id) → POST/GET /tasks?featureId&milestoneId (epic-cards, create-with-preview, by name + [map:#<card_id>]) → card.checklist (items).
Lerian Map as Task Source (optional)
OPTIONAL. Active only when state.task_source == "lerian_map" (cycle-init question 3 = Lerian Map (board is the source)). In this mode the Lerian Map board — not a local plan.md — is the source of truth for WHAT to build and for STATUS. The HUMAN has created the Feature and (optionally) some epic-cards under its Desenvolvimento milestone with checklists. Because a Task is now a checklist item (text + done only — no per-task body), the board CANNOT hold per-task dispatch-ready contracts. So the cycle materializes a derived plan SKELETON from the Desenvolvimento cards at init (epics ← task-cards + their macro body as epic context; tasks ← checklist item names), then the EXISTING rolling-wave elaboration produces the per-task dispatch-ready contracts INTO the derived plan (only the active wave is task-detailed; later phases elaborated at each phase boundary). ⛔ The board has NO phase concept — milestones are fixed template stages, NOT phases. MUST NOT materialize milestones as phases; materialize all Desenvolvimento cards under a single Phase 1 (later structure comes from rolling-wave elaboration). From there every existing gate runs unchanged against the derived plan. Reuses the discovery handshake, Gandalf transport, status mapping, checkpoint hooks, and degradation rules from ## Lerian Map Sync (optional) — none of that is duplicated here.
⛔ Invariant: a task with only a name is NOT executable. The dispatch-ready contract lives in the derived plan.md — no sufficient plan task block, no Gate 0. The board contributes the SKELETON (epic + task names + macro epic overview); the contract is elaborated into the derived plan by the rolling wave. Enforced at init (step 3 below — sufficiency validated against the derived-plan task block) and again as a ⛔ HARD BLOCK at every Gate 0 dispatch (gates/gate-0-implementation.md Step 2.1.5 — Map Body Hard Gate, which validates the plan task block, not the Map body).
Hierarchy mapping (Map → plan):
| Lerian Map | Plan (canonical ring:writing-plans format) |
|---|
task-card (tipo: Task, attached to (featureId, Desenvolvimento milestone)) | Epic (### Epic N.M:) |
checklist item ({id, text, done} inside the card) | Task (#### Task N.M.T:) |
card body / DESCRIÇÃO (markdown, macro overview) | Epic context: what the epic is + a short, direct summary of each task — NOT the full dispatch-ready contract |
checklist item.text | The task name (#### Task N.M.T: heading) |
⛔ Plan Phase is internal rolling-wave structure ONLY — NOT a Map entity. The board has no phase concept; milestones are fixed template stages (Planejamento, Desenvolvimento, Documentação, Testes Internos, Teste Taura, Release), NOT phases. The epic card attaches to a milestone chosen by epic NATURE (a backend/frontend dev epic → the feature's Desenvolvimento milestone, resolved BY NAME). MUST NOT map a Phase to a milestone.
⛔ The full dispatch-ready task block (Context with file:line refs, Implementation vision, Files, Verification, Done when) lives ONLY in the derived plan.md, NOT on the Map. The card body is ALWAYS a macro overview. The per-task contracts are produced by the existing rolling-wave elaboration into the derived plan (see Init flow step 3 and Step 11.5).
Init flow (source = lerian_map; runs once, instead of loading a local plan)
-
Discover the board — run the discovery handshake from ## Lerian Map Sync (optional) SCOPED for source mode: execute handshake step 0 (acting-user resolution — attribution applies in source mode too), step 1 (repo-driven product discovery + Feature resolution → featureId + Desenvolvimento milestone resolution BY NAME → dev_milestone_id), and step 5 (persist into state); SKIP handshake steps 2–4 (the card-create preview + tag auto-injection — in source mode the human already authored the cards, so the cycle MATCHES them, it does not create from a local plan). ⛔ MUST NOT resolve "lowest-order not-done" milestone (the board has no phase concept) — the source milestone is ALWAYS the feature's Desenvolvimento. If Desenvolvimento cannot be resolved on the feature → surface to user (do NOT create milestones). Persist the milestone identity into state.lerian_map_source (canonical — the Desenvolvimento milestone of the feature; see gates/state-schema.md).
-
Fetch the source data via Gandalf (action: ask, self-contained prompt): the Desenvolvimento milestone's task-cards → checklist items, requesting for each card: id, title, body (the macro overview), status, priority, checklist (the {id, text, done}[] array), milestone.{id,name}. After the fetch, populate state.lerian_map_sync.epic_matches[] (ONE per task-card) and state.lerian_map_sync.task_matches[] (ONE per checklist item, sharing the card's card_id) from the Desenvolvimento cards: every unit is board-born, so it is matched by construction.
-
⛔ Skeleton + contract validation (current milestone ONLY — MANDATORY): the board contributes the SKELETON (epic + checklist task names + macro card body); the dispatch-ready contract is elaborated INTO the derived plan, NOT read from the Map. A current-milestone epic whose derived-plan task blocks are not sufficient CANNOT enter the cycle — no exceptions; the context MUST be given. Sufficiency = the Step 11.5.5 validation bar (gates/phase-boundary.md): no "TBD"/vague deferrals; Context with file:line refs; Implementation vision; Files; Verification; Done when. For any current-milestone epic whose derived-plan task blocks are empty/insufficient → AskUserQuestion:
- (a) Elaborate now — dispatch ONE planning agent in ANALYSIS mode (same mechanism as Step 11.5.4 in
gates/phase-boundary.md), seeded by the card's macro body + checklist task names, to produce the dispatch-ready blocks and write them INTO the derived plan. The macro overview is (re-)pushed to the card body and a checklist item is ensured per task via Gandalf. This push is SYNCHRONOUS — init is the strict point and the skeleton must land before the source is trusted; mid-cycle macro-body/checklist pushes stay fire-and-forget — EXCEPT the Step 2.1.5 hard-gate remediation (gates/gate-0-implementation.md), which is synchronous when the Map is reachable (degraded fallback: queue + proceed).
- (b) Abort init — stop so the user fills the board first.
Future-milestone epics are EXPECTED to carry only the macro body + checklist names — that is the rolling wave; their task blocks get elaborated into the derived plan at phase boundaries (Step 11.5). The plan-block-sufficiency rule is enforced AGAIN as a ⛔ HARD BLOCK at every Gate 0 dispatch (gates/gate-0-implementation.md Step 2.1.5 — Map Body Hard Gate, which validates the derived-plan task block), catching drift after init.
-
Materialize the derived plan skeleton — write docs/ring:running-dev-cycle/plan-from-map.md in the canonical ring:writing-plans format, generated from the fetched board data. ⛔ The board has NO phase concept, so materialize ALL Desenvolvimento cards under a single Phase 1: a ## Phase Overview table with one row (Phase 1, Status Detailed), ### Epic N.M: sections from the task-cards (epic context = the card's macro body), #### Task N.M.T: headings from the card's checklist item names. MUST NOT derive phases from milestones. Later phase structure (Phase 2, 3, …) is NOT read from the board — it emerges from rolling-wave elaboration during execution. Tag EVERY epic heading with the [map:#<card_id>] convention (the deterministic matching key, at the EPIC level — see ## Lerian Map Sync (optional)); checklist items are tracked by checklist_item_id in task_matches[]. The active wave's epics (Phase 1) get their per-task dispatch-ready blocks written in (elaborated per step 3). Map each fetched checklist item done into the plan task checkbox and aggregate to the epic **Status:** word:
Fetched checklist item done | Plan task checkbox |
|---|
true | - [x] Done |
false | - [ ] Done |
In the canonical plan format the **Status:** line exists per-EPIC (task blocks carry - [ ] Done checkboxes, not Status lines). Apply it as follows:
- Epic aggregation: derive each epic's
**Status:** word from its checklist items:
Done — all items done=true
Doing — the card's board status is in {in_progress, testing, to_review} OR any item is done=true with others still pending
Pending — otherwise (card in backlog/todo, no items completed)
- Checkbox materialization: each checklist item with
done=true is materialized with its checkbox checked (- [x] Done) so completion is visible in the derived plan.
- Gate 0 implication: tasks materialized as
- [x] Done are already complete and are NOT re-executed at Gate 0 — skip them (same as a done=true checklist item on the board); a mid-flight milestone resumes from the first unchecked task.
Set state.source_file to this derived plan. From here on, ALL existing gates (0 / 8 / 9 / 11.5 / 12.x) run unchanged against it.
-
Source-of-truth rule: the derived plan is an internal, regenerable execution artifact; the board remains the source of truth for WHAT and STATUS. The board holds the SKELETON only (macro card body + checklist task names + status); the dispatch-ready contracts live ONLY in the derived plan. Manual edits to the derived plan that change a card's macro summary or the set of task names MUST be reflected back to the card body / checklist via Gandalf (epic matched via the [map:#<card_id>] tag — see write-back rules below); per-task contract edits stay local (the Map never holds them).
Resume rule: on --resume with task_source == "lerian_map" and the derived plan missing from disk, re-run init steps 2 + 4 (fetch + materialize) before resuming the gates — state indices stay authoritative. If the Map is unreachable during this regeneration → treat it as the INIT degradation case below (Retry / fall back / Abort).
During the cycle
- Status: the EPIC card status flows to the board via the existing checkpoint hooks (
## Lerian Map Sync (optional) → Checkpoint hooks); each completed task flips its checklist item done=true at push-to-develop. No changes — source mode implies status sync.
- Macro-body write-back: when Gate 8/9 outcomes change an epic's macro summary or its set of task names, push the updated macro overview to the epic's card
body and ensure the checklist items match (merge-by-checklist_item_id, never array-replace) — async fire-and-forget, same pending → dispatched → synced degradation rules as status pushes. NEVER blocks a gate. The per-task dispatch-ready contract stays in the derived plan and is NOT pushed to the Map.
Phase boundary (Step 11.5)
After the planning agent elaborates the next phase's epics into dispatch-ready task blocks in the derived plan, CREATE one new task-card per new epic under (featureId, dev_milestone_id) — the SAME Desenvolvimento milestone, NOT a "next milestone" — with a checklist of its task names, push each epic's macro overview to the card body, and tag the epic with the new [map:#<card_id>]. Cards already present are matched by [map:#<card_id>], not duplicated; ensure one checklist item exists per task (merge-by-checklist_item_id, create missing items, never array-replace). Same create path as init, but fire-and-forget (never blocks the gate). The dispatch-ready contracts stay in the derived plan; only the macro skeleton reaches the board. Reconciliation: the flow CREATEs the missing cards/items; DELETING cards stays user-only (never silent); the Feature is never created/edited/deleted by the flow. The full rule (and its best-effort board fetch) lives in gates/phase-boundary.md Step 11.5.5b. This is the rolling-wave behavior: later-phase epics get their cards created under Desenvolvimento as development reaches them.
Graceful degradation (source mode is stricter than sync mode at init)
- At INIT: Gandalf/Map unreachable = the task source itself is unavailable → AskUserQuestion: Retry / Fall back to a local plan (switch
state.task_source to "plan_file" AND set state.lerian_map_sync.enabled = false — or remove the lerian_map_sync object entirely, incl. testing_gate — so no sync hook ever fires; ask for the plan path; zero further Map calls) / Abort.
- DURING the cycle: the derived plan already holds everything the gates need, so Map outages degrade exactly like sync mode (
pending + degraded, fire-and-forget reconciliation — see ## Lerian Map Sync (optional)) and NEVER block gates.
Blocker Handling
| Blocker | Action |
|---|
| Gate failure (tests not passing, review failed) | STOP. Cannot proceed to next gate. |
| Missing PROJECT_RULES.md | STOP. Create using template. |
| Agent error | STOP. Diagnose and report. |
| Architectural decision needed | STOP. Present options to user. |
When state.lerian_map_sync.enabled and a gate hard-blocks (failure / external blocker), fire the async board push → absolute column blocked for the affected unit (non-blocking, fire-and-forget) before stopping. See ## Lerian Map Sync (optional).
Gate Completion Rules
A gate is complete ONLY when ALL components succeed:
- Gate 0 (per task): TDD RED + GREEN + coverage ≥ 85% + all acceptance criteria tested + docker-compose/local runtime verified + delivery verification (all requirements delivered, 0 dead code)
- Gate 8 (per epic): all 9 default reviewers pass, and any triggered conditional specialist also passes.
- Gate 9 (per epic): every task's acceptance criteria aggregated and marked PASS + explicit "APPROVED" from user
- Phase boundary (Step 11.5): phase closed (Phase Overview → Complete, deviations recorded) + next phase elaborated and validated (or no next phase) + checkpoint honored per
phase_checkpoint
Severity of Issues
- CRITICAL/HIGH/MEDIUM found in review → Fix NOW, re-run the selected review pool
- LOW → Keep in the review report if actionable; do not add source comments during review
- Cosmetic → Add
FIXME(nitpick): comment
Error Recovery
| Scenario | Recovery |
|---|
| Agent returns error | Retry with clearer instructions (max 3 attempts) |
| State file corrupted | Rebuild from git log + last known state |
| Gate stuck in loop | After 3 iterations, escalate to user |
| Context limit reached | Use /ring:creating-handoffs → resume in new session |
Input Sources
| Source | Path |
|---|
| Plan (pre-dev flow) | docs/pre-dev/{feature}/plan.md |
| Plan (standalone ring:writing-plans) | docs/plans/*.md |
| Derived plan (Lerian Map as task source) | docs/ring:running-dev-cycle/plan-from-map.md — materialized at init when task_source == "lerian_map"; see ## Lerian Map as Task Source (optional) |
| Legacy tasks (in-flight cycles ONLY) | docs/pre-dev/{feature}/tasks.md (old ## Summary table + E-/T- ids) — accepted only when current-cycle.json already exists (init is not re-run); new cycles MUST start from the canonical plan format |
| Phase tasks | inside the plan, under each epic (#### Task N.M.T: blocks) |
| Refactor tasks | docs/ring:planning-backend-refactor/*/tasks.md |
Frontend Handoff