| description | Cut a Claffeinate release for a given version — bump the version/build, build & notarize the app, create/close the GitHub milestone and its issues, and publish the GitHub Release. Use when the user says "release Claffeinate", "cut a release", "Claffeinate のリリース", "リリースして", or names a version to ship (e.g. "release 0.3.0"). A version argument (X.Y.Z) is REQUIRED. |
| argument-hint | <X.Y.Z> |
Claffeinate release
Ship a notarized Claffeinate release end to end. This skill orchestrates the
existing scripts/release.sh (archive → Developer ID sign → notarize → staple →
package) and the GitHub side (milestone, issues, Release).
Required input
A target marketing version X.Y.Z (semver). If the user did not give one,
stop and ask — never guess. Everything below uses $VERSION for it.
The build number is bumped automatically (current app build + 1). The git
tag and Release are named X.Y.Z (no v prefix — matches the existing 0.1.0
tag).
Why this order (optimized from the rough draft)
The user's draft was: bump+commit → build → milestone → issues → done → release.
Re-ordered for safety and good notes:
- Preflight & confirm first — validate everything and get one explicit
go-ahead before any mutation (commits, notarization, closing issues, and a
public Release are all consequential / outward-facing).
- Build is the gate for tag & Release — bump and commit, then build; only
tag/push/publish after a successful notarized build, so a broken or
un-notarizable build never produces a dangling tag or a half-published
Release.
- Milestone + issues before the Release — so the Release notes can be
generated from the milestone's issues, and the milestone is closed as part of
shipping.
Prerequisites (fail early if missing)
gh auth status is logged in (account matwu), remote is matwu/Claffeinate.
- A "Developer ID Application" cert for team
9VMM83M3Y6 in the keychain, and a
stored notarytool profile named Claffeinate (see the header of
scripts/release.sh). Without these, release.sh cannot notarize.
- On branch
main with the intended changes present (they will be committed).
Procedure
0. Preflight (no side effects)
cd "$(git rev-parse --show-toplevel)"
gh auth status
git branch --show-current
git status --short
CUR_VERSION=$(grep -m1 'MARKETING_VERSION = [0-9]' Claffeinate.xcodeproj/project.pbxproj | grep -oE '[0-9]+\.[0-9]+\.[0-9]+')
CUR_BUILD=$(grep -m1 'CURRENT_PROJECT_VERSION = ' Claffeinate.xcodeproj/project.pbxproj | grep -oE '[0-9]+')
LAST_TAG=$(git tag --sort=-v:refname | head -1)
echo "current: $CUR_VERSION (build $CUR_BUILD) · last tag: $LAST_TAG · new: $VERSION (build $((CUR_BUILD+1)))"
Validate:
$VERSION matches ^[0-9]+\.[0-9]+\.[0-9]+$.
- A tag / Release named
$VERSION does not already exist
(git tag | grep -qx "$VERSION" and gh release view "$VERSION"); if it does,
stop and tell the user.
Determine the milestone & candidate issues. Milestone title = $VERSION.
Gather issues this release should cover from commit references since the last
tag, then confirm with the user (don't assume "relevant"):
git log "${LAST_TAG}..HEAD" --pretty=%B | grep -oiE '#[0-9]+' | tr -d '#' | sort -un
gh issue list --repo matwu/Claffeinate --state all --limit 50
Present a plan summary and get explicit confirmation before proceeding:
- version
$CUR_VERSION → $VERSION, build $CUR_BUILD → $((CUR_BUILD+1))
- files that will be committed (
git status)
- milestone to create/use, and the exact issue numbers that will be assigned to
it and closed
- that a notarized build, a
git push, and a public GitHub Release will happen
If the user named specific issues, use those instead of the commit-derived list.
1. Bump version & build number
Edit Claffeinate.xcodeproj/project.pbxproj:
- Set the app
MARKETING_VERSION to $VERSION (both Debug & Release configs
— they currently read the old $CUR_VERSION; the Helper's 1.0 must stay).
- Bump every
CURRENT_PROJECT_VERSION to $((CUR_BUILD+1)) (unifies the app
and Helper build numbers; bumping the Helper too makes SMAppService
re-register the updated daemon).
NEW_BUILD=$((CUR_BUILD+1))
sed -i '' "s/MARKETING_VERSION = ${CUR_VERSION};/MARKETING_VERSION = ${VERSION};/g" Claffeinate.xcodeproj/project.pbxproj
sed -i '' "s/CURRENT_PROJECT_VERSION = [0-9]*;/CURRENT_PROJECT_VERSION = ${NEW_BUILD};/g" Claffeinate.xcodeproj/project.pbxproj
Verify with grep -nE 'MARKETING_VERSION|CURRENT_PROJECT_VERSION' — expect the
app at $VERSION, the Helper still 1.0, all build numbers $NEW_BUILD.
2. Commit everything
git add -A
git commit -m "Release ${VERSION} (build ${NEW_BUILD})"
(Use the project's commit trailer convention.)
3. Build, sign, notarize, package — the gate
scripts/release.sh
This archives, exports with Developer ID, notarizes (waits), staples,
verifies with spctl, and writes build/release/Claffeinate-${VERSION}.zip.
If this fails, stop — fix forward; the commit from step 2 is local-only and
no tag/Release exists yet. Confirm the artifact:
ls -la "build/release/Claffeinate-${VERSION}.zip"
4. Tag & push
git tag "${VERSION}"
git push origin main
git push origin "${VERSION}"
5. Milestone & issues
gh api repos/matwu/Claffeinate/milestones --jq '.[].title' | grep -qx "${VERSION}" \
|| gh api repos/matwu/Claffeinate/milestones -f title="${VERSION}" -f state=open >/dev/null
MS_NUM=$(gh api repos/matwu/Claffeinate/milestones --jq ".[] | select(.title==\"${VERSION}\") | .number")
For each confirmed issue number N: assign the milestone and close it.
gh issue edit N --repo matwu/Claffeinate --milestone "${VERSION}"
gh issue close N --repo matwu/Claffeinate
Then close the milestone (it's shipped):
gh api -X PATCH "repos/matwu/Claffeinate/milestones/${MS_NUM}" -f state=closed >/dev/null
If there were no relevant issues, skip issue assignment but still create (and
close) the milestone, and say so.
6. Create the GitHub Release
Write user-facing notes from the milestone's closed issues (their titles), with
a short summary line; fall back to a brief summary if there were none. Then:
gh release create "${VERSION}" "build/release/Claffeinate-${VERSION}.zip" \
--title "Claffeinate ${VERSION}" \
--notes "<curated notes>"
gh release view "${VERSION}" --json url -q .url
The asset is the notarized zip; mention in the notes that it's Developer
ID-signed and notarized (users can unzip → move to /Applications → launch
without a Gatekeeper prompt).
7. Report
Summarize: new version/build, commit, tag, milestone (closed), issues closed,
and the Release URL.
Notes & guardrails
- Confirm before mutating (step 0). Re-running for an existing version must
not silently re-tag or duplicate a Release.
- The README has no hardcoded version (it links
/releases/latest and uses a
<version> placeholder), so it needs no edit.
- Notarization takes a few minutes (
notarytool --wait); that's expected.
- If
release.sh lacks the signing cert / notary profile, surface that as the
blocker rather than attempting an unsigned release (the Helper won't register
without a notarized bundle).