Skip to main content
Run any Skill in Manus
with one click
nesquena
GitHub creator profile

nesquena

Repository-level view of 13 collected skills across 1 GitHub repositories.

skills collected
13
repositories
1
updated
2026-07-20
repository map

Where the skills live

Top repositories by collected skill count, with their share of this creator catalog and occupation spread.

repository explorer

Repositories and representative skills

issue-capture
software-developers

Capture issue-shaped reports that have not reached the tracker yet. Divert suspected vulnerabilities, dedupe across every surface, and stage genuinely new actionable items in the pre-tracker queue. Never files or replies on the public tracker. Watcher role, Band A.

2026-07-20
action-watchdog
software-developers

Independently fact-check the autonomous actions the system took (issue closes, labels, capture marks, etc.) against live ground truth, and alarm on any mismatch. Run on a schedule. This is what makes Band-A public actions safe.

2026-07-20
issue-triage
software-developers

Triage tracker issues — initial reply under a confidence gate, label, milestone, sprint-candidate, and the dropped-ball "reporter waiting on us" surfacer. Use for ongoing issue-tracker hygiene.

2026-07-20
pr-deep-review
software-quality-assurance-analysts-and-testers

Deep-review a routed PR and run the authoritative quality gate before merge. Reads the whole diff, reproduces, runs the layered gates fresh, bounces with a fix-spec or fixes mechanical blockers. Stages 3-4 of the PR lifecycle.

2026-07-19
pr-triage
software-quality-assurance-analysts-and-testers

Screen and route an open pull request — fit/scope screen, marginal-benefit screen, and lane routing. Use at the front of the PR pipeline before any deep review. Stages 0-2 of the PR lifecycle.

2026-07-19
contributor-trust
software-developers

Aggregate the contributor trust ledger into a shrunk-and-decayed reliability score that weights review priority and gate intensity — never a reason to skip a gate. Band A, no LLM: classification happens upstream at close, this is arithmetic over an existing event log.

2026-07-19
release-pipeline
software-developers

Merge an all-clear PR and ship it — rebase, merge preserving attribution, tag, deploy, verify it's actually live, close PR/issues with credit, update the trust ledger. Stages 5-6 of the PR lifecycle. Runs only after pr-deep-review's gate is all-clear.

2026-07-19
triage-scoreboard
software-developers

Compute and render the living, ranked triage board of open work — mechanical + judgment dimensions into a composite rank, with evidence-readiness tags. Run on a schedule so the board is always current.

2026-07-19
Showing top 8 of 13 collected skills in this repository.
Showing 1 of 1 repositories
All repositories loaded