Project Status
Scan the current project's CPM artifacts and git history to produce a structured status report. Print the report to stdout โ nothing scanned is modified, and on the default path nothing is written at all.
This is a read-only reconnaissance skill. It gathers information and reports it. All scan operations are read-only โ source files and git state remain untouched.
Optional full-picture artifact. On request, status can additionally publish a hosted page presenting the comprehensive project picture the one-screen narrative deliberately omits โ full epic/story completion grid, in-progress + blocked panel, RAG indicators, recent git activity, and recommended next steps. This is an opt-in extra, never the default: the stdout narrative below is always produced and unchanged. See Phase 4 for the mechanics.
Input
If $ARGUMENTS is provided, use it as focus context:
- If it's a file path (e.g.
docs/epics/02-epic-auth.md), focus the report on that specific artifact and its related context.
- If that path is a spec (under
docs/specifications/), the report additionally carries the spec coverage roll-up โ see Phase 3b. That is the only trigger: the roll-up is spec-scoped, and no other focus produces it.
- If it's a description (e.g. "what's the state of authentication work?"), use it to guide which parts of the report to emphasise.
- If it requests the full picture (e.g. contains
dashboard, artifact, "full picture", "share it", or "open it in a browser"), produce the stdout narrative as usual and offer the full-picture artifact (Phase 4). A focus path/description still applies โ it shapes both outputs. html is no longer a trigger word: status produces no HTML file, so a request phrased that way is asking about a capability that no longer exists โ say what is produced instead rather than silently treating it as an artifact request.
- When both apply โ a spec path and a page request โ there are two different pages, so ask which is wanted rather than choosing: the spec coverage page (Phase 3b) or the project-wide full picture (Phase 4). Offering one is not offering the other, and publishing one is never confirmation for the other.
If no arguments are given, produce a full project status report covering all CPM artifacts and recent activity. Do not offer either artifact unless it is requested.
State Management
This skill is stateless and ephemeral. No progress file is created or maintained. The stdout report is printed and the skill is done. If the user needs to discuss or act on the status, they can invoke other CPM skills (e.g. /cpm:do, /cpm:retro, /cpm:archive).
The optional artifact does not change that. The page is regenerated from a live scan on each request; it is a view, not stored state.
- Default status run (no artifact requested): nothing is written at all โ stdout only.
- Artifact requested (Phase 4): publishing composes a body fragment at the shared convention's scratch path,
docs/plans/status-artifact-full-picture.html. That file is a build intermediate, not an output โ overwritten on each publish and safe to delete. The project-wide picture carries no {nn}, having no numbered artifact behind it; the slug is fixed so re-publishing redeploys to the same URL rather than minting a second one.
- Spec coverage page requested (Phase 3b): the same mechanics at
docs/plans/status-artifact-{nn}-{slug}.html, numbered and slugged from the spec in focus. This one does carry an {nn}, because it is scoped to a numbered artifact โ which is what keeps two specs' roll-ups on two URLs instead of overwriting each other. It is a separate page from the full-picture artifact, requested and confirmed separately; neither implies the other.
- The register row is the exception, and it is deliberate. Publishing writes a row to
docs/artifacts/index.md as part of the same step. It is the one durable thing a status run leaves behind, and it is what makes a published URL findable later. This does not make status stateful in the sense the read-only guarantee protects: it appends to the register, and touches no scanned artifact.
The user must ask for the artifact at all โ it never appears on the default path โ and publishing is separately confirmed on top of that.
Stale-Progress Check
Follow the shared Stale-Progress Check procedure (from the CPM Shared Skill Conventions loaded at session start).
Process
Work through Phases 1โ3 sequentially: each gathers data, and Phase 3 synthesises everything into the report. Phase 3b runs only when the focus argument is a spec path. Phase 4 is optional and runs only on request.
Phase 1: Artifact Inventory Scan
Scan CPM documentation directories for artifacts. For each directory, use the Glob tool. If the directory doesn't exist or contains no matching files, skip it silently โ always degrade gracefully on missing data.
Directories to scan:
| Directory | Glob pattern |
|---|
| Briefs | docs/briefs/[0-9]*-brief-*.md |
| Specifications | docs/specifications/[0-9]*-spec-*.md |
| Epics | docs/epics/[0-9]*-epic-*.md (exclude coverage matrices) |
| Discussions | docs/discussions/[0-9]*-discussion-*.md |
| Retros | docs/retros/[0-9]*-retro-*.md |
| Architecture | docs/architecture/[0-9]*-adr-*.md |
For each directory, count the files found. Report only the count, not individual files.
Epic deep-read: For each epic file, use the Read tool to extract the **Status**: field and story completion counts. Read each file individually with the Read tool directly (Bash loops with shell variables lose context). Read each status by its leading token โ the text up to the first delimiter (โ / โ, -, (, ;); normalise that against the vocabulary and treat any tail as a human note (see cpm/shared/status-model.md, Status parsing). So Complete โ folded into Story 10 reads as Complete. Only report epics that have remaining work โ Status is not Complete/Done (readers treat Done as a synonym for Complete) and not retired (Superseded / Withdrawn, the terminal user-set statuses for work no longer needed). A retired epic has no remaining work: its stories still count as done in progress counts (the work is closed out), and it never appears as something needing attention. Completed epics are summarised as a single count (e.g. "17 epics complete"); retired epics are likewise summarised as a count (e.g. "2 epics superseded/withdrawn"), with /cpm:archive suggested to sweep them. Epics with remaining work get individual lines: "{Epic name}: {completed}/{total} stories โ {status}".
Retro waiver: when deciding whether a completed epic needs a retro, honour an epic-level **Retro waived**: marker (a header-block field, distinct from the story-level **Retro**: observation fields; set by /cpm:retro triage on a clean epic โ see cpm/shared/status-model.md, Retro waiver). A waived completed epic is retro-satisfied: do not flag it as needing a retro, exactly as if a docs/retros/ retro existed for it.
Unrecognised statuses: a status whose leading token is not in the recognised vocabulary (story: Pending/In Progress/Complete/Done; epic: those plus Superseded/Withdrawn โ story-level Superseded/Withdrawn is unrecognised, those being epic-level only) is flagged, never guessed. Do not infer intent from free prose; record the raw text and its location. Such a status counts as not-done (conservative). Collect these for a callout in the report โ do not silently drop them.
Progress files: Glob docs/plans/.cpm-progress-*.md. If any exist, read the first few lines to extract **Skill**: and **Current task**:/**Phase**: fields. Report which skills have active sessions.
Collect the data โ save it for Phase 3, which handles formatting.
Phase 2: Git Activity Scan
Gather recent git activity using Bash commands. All git commands must be read-only.
Step 2a: Branch and working tree status
Run git status --short and git branch --show-current using the Bash tool. Capture:
- Current branch name
- Whether there are uncommitted changes (staged or unstaged)
- Whether there are untracked files
If on a non-main branch, also run git diff --stat main...HEAD to summarise the in-flight changes on this branch relative to main. If the main branch doesn't exist, try master. If neither exists, skip the branch diff.
Step 2b: Recent commit history
Use an adaptive time window to determine how far back to look:
- Run
git log --oneline -1 --format=%ct to get the timestamp of the most recent commit.
- Calculate the gap between now and the last commit:
- Gap < 1 day: Look at the last 3 days
- Gap 1-7 days: Look at the last 2 weeks
- Gap > 7 days: Look at the last 20 commits regardless of date
Run git log --oneline with the appropriate filter to get the commit list. Also run git log --format="%s" with the same filter to get the full subject lines โ these are the raw material for the narrative synthesis in Phase 3.
Collect the data โ save it for Phase 3, which handles formatting.
Phase 3: Synthesis and Report
Combine data from Phase 1 and Phase 2 into a narrative summary that tells the user what's been happening and where things stand. The goal is contextual understanding, not raw data. Print directly to stdout.
Section 1 โ Summary: Write a narrative briefing that would orient someone picking up this project for the first time. It should answer the questions a new developer would ask: "What is this? What's been done? What's in flight? What needs attention?" Write it as 2-4 short paragraphs:
-
What this project is: Infer the project's purpose from artifact names, epic titles, commit messages, and any README or CLAUDE.md. One or two sentences that describe the project to someone who has never seen it.
-
What's been built: Summarise the body of completed work. Group epics into themes rather than listing individually (e.g. "Core planning pipeline (discover โ spec โ epics โ do), facilitation skills (party, consult), quality infrastructure (TDD, coverage matrices, review)"). This gives a sense of the project's maturity and scope.
-
What happened recently: Read the commit subjects from Phase 2 and identify the themes of recent work. Group related commits into a narrative thread (e.g. "Recent work focused on coverage matrix improvements and adding the consult skill"). Mention the time since last commit if there's been a notable gap.
-
What needs attention now (if anything): In-progress epics or stories, active CPM sessions, uncommitted changes, feature branches with in-flight work, stale progress files. If everything is clean and complete, say so โ that's useful information too.
Unrecognised-status callout: if the Phase 1 scan collected any unrecognised statuses, add a distinct callout here โ e.g. "โ Unrecognised statuses: docs/epics/05-โฆ, Story 3 โ Folded into Story 10. These count as not-done; rewrite to Complete โ note (or the correct status) to resolve." Name each offending epic/story and show its raw status verbatim. This is the only place the report exposes off-vocabulary statuses; keep it separate from the normal progress narrative so it reads as an anomaly to fix, not a state to accept.
If no CPM artifacts exist, say: "No CPM planning artifacts found. This project hasn't started the CPM planning pipeline yet."
If the project has active work (in-progress epics or sessions), lead with that โ it's the most urgent context.
Section 2 โ Recommended Next Steps: Based on everything gathered, suggest 1-3 concrete next actions. Use this decision logic:
| Project state | Recommendation |
|---|
| No CPM artifacts at all | "Start planning with /cpm:discover or /cpm:brief" |
| Briefs exist but no specs | "Turn your brief into a spec with /cpm:spec {brief path}" |
| Specs exist but no epics | "Break your spec into epics with /cpm:epics {spec path}" |
| Epics with pending/in-progress stories | "Continue work with /cpm:do {epic path}" (show the specific epic with remaining work) |
| All epic stories complete, no retro and not waived | "Run a retrospective with /cpm:retro {epic path}" |
Completed epic carries a **Retro waived**: marker | Retro-satisfied โ do not suggest a retro (waived clean epics; see below) |
| Retros exist, completed epics | "Archive completed work with /cpm:archive" |
| Active progress files | "Resume active session โ {skill name} is in progress" |
| Uncommitted changes | "You have uncommitted changes โ consider committing before starting new work" |
Multiple recommendations can apply simultaneously. List them in priority order โ the most impactful action first.
Phase 3b: Spec Coverage Roll-Up (only when the focus is a spec)
This phase runs only when $ARGUMENTS resolves to a path under docs/specifications/. On every other run โ no arguments, an epic path, a description โ skip it entirely. It adds a section to the report; it changes nothing about Phases 1โ3, whose project-wide view is produced and printed exactly as before.
It answers a question the project-wide view cannot: is this spec fully delivered? Coverage lives per-epic โ cpm:epics writes one matrix per epic and cpm:do fills its โ marks โ and no artefact spans a spec's epics. Answering it by hand means opening every matrix and diffing them by eye.
Run the script. Never compute this yourself.
bash "${CLAUDE_PLUGIN_ROOT}/hooks/lib/coverage-rollup.sh" --spec "${SPEC_PATH}"
where ${SPEC_PATH} is the spec the focus argument resolved to. Do not glob for matrices, read **Source spec** fields, match labels, or derive states in this skill. The union, the matching and the state derivation live in one place, and a second implementation here would be free to disagree with the one cpm:ralph uses. cpm:clean enumerated files itself and reported an empty inventory on every run for months; the fix was a script plus a skill that never enumerates.
The script resolves the project root itself. CLAUDE_PROJECT_DIR is set for hooks but not for the Bash calls a skill issues, so pass no $CLAUDE_PROJECT_DIR-derived path โ the invocation above is written to work as it stands.
On a non-zero exit, report what failed and stop. The message on stderr names the file that could not be read. A non-zero exit means the computation did not complete, so there is nothing to render and nothing to conclude: say the roll-up could not be produced and why. Never fall back to a partial reading of the matrices by hand โ that is the reimplementation this phase exists to avoid.
It emits tab-separated records, one per line, with the record type in field 1:
| Type | Fields |
|---|
MATRIX | path, source-spec |
REQ | label, MoSCoW heading, verbatim requirement text |
STATE | label, MoSCoW heading, delivered | in-progress | untraced |
EXCLUDED | label, MoSCoW heading โ a requirement the spec ruled out, rather than one that is missing |
SUMMARY | scope, requirements, untraced, delivered, in-progress |
ROW | matrix path, base label, label, covered by, verified | unverified, test approach tag, criterion tag |
CRITERION | matrix path, label, covered by, verified | unverified, test approach tag, criterion tag โ a story-originated row, with no requirement behind it |
UNRESOLVED | matrix path, label, covered by โ a row whose label names no single requirement, such as ENV1โENV5. It carries no verified field: the row resolves to nothing, so a tick on it verifies nothing |
Render it like this:
- Untraced requirements first, before anything else in the section โ including before the summary counts. This is the load-bearing measurement and the reader's real question is "what did I ask for that isn't there". A requirement is untraced when no matrix row mentions it, which means the breakdown missed it: it is a gap in the plan, not slow progress. If there are none, say so in one line.
- Then the remaining requirements, grouped under the spec's own MoSCoW headings โ Must Have, Should Have, Could Have, then Non-Functional โ in the order the spec lists them. Take each heading from the
REQ record's second field; do not invent an ordering or collapse the groups.
- Quote each requirement's verbatim text, the third field of its
REQ record, exactly as the spec wrote it. That text is what a stakeholder actually asked for, and paraphrasing it here is how the thing that was asked for stops matching the thing that was built.
- Show each requirement's state โ delivered, in progress, or untraced. Never a proportion: a requirement with four of five rows verified is in progress, not 80% delivered.
- List ruled-out requirements separately, from the
EXCLUDED records, as ruled out rather than outstanding. A requirement reaches that record by either of the two ways a spec says "not this iteration" โ a Won't Have heading, or a ### Deferred / ### Out of Scope bullet naming it under ## Scope. The record does not say which route it took; when that matters, the spec is the place to look.
- Name any
UNRESOLVED rows, and say the requirements they claim are not covered by them. Such a row names more than one requirement in a cell that holds one โ ENV1โENV5, FR8, FR5 โ so its single tick would mark several requirements verified on one piece of evidence. It is a defect in the matrix rather than in the work, and it is worth surfacing precisely because the document looks complete: the row reads as coverage while every requirement it names is counted untraced. Say which matrix, and that the fix is one row per requirement.
- Close with the
SUMMARY counts.
Say what the โ marks mean, wherever this section shows them. They are aggregation, not verification. Every โ was placed by cpm:do on its own work; unioning them reports what do claimed, more conveniently, and adds no independent evidence. A wall of green must not be read as confirmation that anything works. The untraced count is the part of this section that discriminates โ the spec's requirement list is written by a human and the matrices are generated later from it, so a gap between them is a real finding rather than a foregone one.
And separate the marks a test produced from the ones nothing could. Each ROW and CRITERION carries the test approach the spec assigned. [target] and [manual] are the two whose ticks rest on something other than a test having run โ one on an environment nobody here has, the other on a human's judgement โ so a section reporting "every row verified" over a set that is largely those two is reporting agreement, not evidence. Where any verified row carries either tag, say how many and which requirements, in the same breath as the counts. Do not reweight or discount anything: a tick is a tick, and this is a statement about what the ticks rest on.
Read both tag fields, and report a disagreement as its own finding. The seventh field is the tag the spec assigned to the requirement; the eighth is the tag on the criterion cpm:epics actually wrote, and they need not match. The disagreement worth naming is a spec tag of [target] over an automated criterion: it means the spec withheld a requirement from verification that the breakdown found a way to check anyway โ almost always a mis-tagged requirement rather than a deliberate one, and it is easiest to create by tagging a collapsed range such as ENV6โENV8 in one cell. Report those rows separately from the genuinely unverifiable ones. Read as [target] they look permanently out of reach; read as what they are, they are ordinary outstanding work.
The stakeholder page (on request only)
An artifact can be published from this output on request โ follow the shared Artifact Publishing procedure. It is always separately confirmed, and never the default.
For status the artifact is here the one page that spans a spec's epics: every requirement a stakeholder asked for, with its state and the matrix rows behind it, in a form that can be handed to someone who has no repository and no way to open twenty coverage matrices. The requirement text a stakeholder used survives to a โ only inside each matrix's verbatim column, and no single document currently spans them. That justification is also the test for anything else the page might carry โ as with companion assets, if you cannot write the one-line justification for what the visual carries that the prose cannot, it has not earned its place.
Render it from the same records, by the same rules. The page shows the output of the one invocation above โ the same MATRIX, REQ, STATE, EXCLUDED, SUMMARY, ROW, CRITERION and UNRESOLVED records the section renders โ and follows rendering rules 1โ7 above, read from there rather than repeated here. The two the reader will notice first are rules 1 and 2: untraced requirements before anything else, then the spec's own MoSCoW headings in the spec's order. Do not re-run the script for the page and do not restate the rules alongside it โ a second run could disagree with the section the reader just read, and a second statement of a rule is the thing that drifts from it. If the section was not produced โ the phase skipped, or the script exited non-zero โ there is no page to publish either.
Carry the aggregation statement onto the page. The โ marks mean the same thing there as they do in the section, and a page is the artefact most likely to be read by someone who was not in the session and did not see it said.
Mechanics follow the shared procedure. Two points are specific here:
- The scratch path is
docs/plans/status-artifact-{nn}-{slug}.html, where {nn} and {slug} come from the spec โ the page is spec-scoped, so re-publishing the roll-up for one spec redeploys to that spec's URL rather than colliding with another's. This is a different page from Phase 4's full-picture artifact, which is project-wide and carries no {nn}.
- The register row is written; no
**Artifacts**: backlink is. Publishing records the URL in docs/artifacts/index.md per the shared convention, naming the spec as the source artifact โ so the association is recorded, from the register's end. The convention also asks for a backlink on the source artifact, and this skill does not write one: the spec is a file status scanned, and writing to a scanned artifact would break the read-only guarantee stated in Guidelines and State Management. The cost is that the relationship reads from one end only, which is why the register row is not optional.
Phase 4: Optional Full-Picture Artifact (on request only)
This phase runs only when the full picture was requested (see Input). If it was not requested, skip Phase 4 entirely โ the skill ends after the stdout report. Phase 4 never alters Phases 1โ3: the stdout narrative is produced and printed exactly as before, then the artifact is offered in addition. Offered, not published โ publishing is confirmed separately, and a declined offer still leaves a complete status run behind it.
The page is synthesised directly from the Phase 1 + Phase 2 scan data already gathered, with no Markdown intermediate. There is no stored status document to render from; the same read-only scan that fed the narrative feeds the page. Because both draw from one scan, their numbers must agree โ the page's completion counts, in-progress/blocked lists, and git activity are the same data the narrative reports, just shown in full rather than synthesised to a screenful.
An artifact can be published from this output on request โ follow the shared Artifact Publishing procedure. It is always separately confirmed, and never the default.
For status the artifact is the full project picture the one-screen narrative deliberately omits: the completion grid, the blocked panel, and the RAG view, all at a size stdout cannot carry. That justification is also the test for anything else the page might carry โ as with companion assets, if you cannot write the one-line justification for what the visual carries that the prose cannot, it has not earned its place.
- Sections (give each an
id so in-page anchors resolve):
- At a glance (RAG) โ green = complete, amber = in progress, red = blocked/partial. State the headline figure as "{complete} of {total} epics complete" โ the canonical agreement statement that must match the count the stdout narrative reports.
- In progress & blocked โ the active and blocked stories/epics.
- Epic / story completion grid โ every epic with its complete/total story count and a status indicator, in a table. Apply the graceful schema tolerance rule: where an epic doc's structure varies (missing status, partial counts), render what parsed and visibly flag the gap rather than omitting the row or erroring.
- Recent git activity โ the Phase 2 commit list.
- Recommended next steps โ the same actions as the stdout report's Section 2.
- Optional export affordances. The page may include inline vanilla JS for copy-as-prompt / copy-as-JSON export โ follow the shared Artifact Publishing โ Export affordances convention for the canonical pattern and rules. Useful here: copy-as-prompt on each recommended next step (e.g.
/cpm:do docs/epics/05-โฆ) and copy-as-JSON of the status summary (the completion counts + in-progress/blocked lists). Interactivity is an enhancement, not the point โ a purely static page is a valid deliverable.
- Register the URL. Publishing writes the register row in
docs/artifacts/index.md as part of the same step, per the shared convention. status writes no **Artifacts**: backlink: it has no single source artifact โ the scan covers every epic and spec in the project โ and writing one into those files would break the read-only guarantee stated in Guidelines. The register row is therefore the only durable trace this skill leaves, which is why it is not optional.
When the Artifact tool is absent, say so plainly and stop after Phase 3 โ the stdout narrative from Phases 1โ3 is the degradation path, and it is complete on its own. Never hard-fail: the tool's absence removes an extra, not the skill's output. There is no local-HTML fallback โ nothing is written to disk in its place, and the narrative is not downgraded to compensate.
Report Format
Print the report to stdout using this structure:
# Project Status
## Summary
{Narrative paragraph โ what the project is, what's been happening, where things stand}
## Recommended Next Steps
{1-3 concrete actions with copy-pasteable commands}
Brevity is paramount. The entire report should fit in one screenful. The summary is a narrative, not a data dump โ synthesise into themes and patterns.
Guidelines
- Read-only. Use only read-only operations:
git log, git status, git diff, git branch. Every file the scan reads โ epic docs, specs, retros โ is left untouched, as is git state. The sole write is the register row an explicitly-confirmed publish appends to docs/artifacts/index.md (see State Management).
- Graceful degradation. If a directory doesn't exist, skip it silently. If no artifacts are found, say so and suggest where to start. Always degrade gracefully on missing data.
- Scannable output. Use clear section headers, concise summaries, and bullet points. The entire report should be digestible in under a minute.
- Actionable recommendations. Every recommended next step should include a copy-pasteable command (e.g.
`/cpm:do docs/epics/02-epic-auth.md`).
- Adaptive detail. Match report depth to what's found. An empty project gets a short "getting started" report. A project with 5 epics gets a detailed inventory.