Skip to main content
periodicpoint
GitHub creator profile

periodicpoint

Repository-level view of 18 collected skills across 1 GitHub repositories.

skills collected
18
repositories
1
updated
2026-04-26
repository explorer

Repositories and representative skills

chaos
fine-artists-including-painters-sculptors-and-illustrators

Run the divergent, psychodelic, chaos protocol. A deliberate cognitive jolt that emits heterogeneous fragments (facts, poetry, multilingual shards, silence, non-sequiturs) to dissolve calcified thought patterns and surface genuinely new associations. Use when divergence has collapsed, the user is stuck, convergent thinking has locked the option space, all ideas sound alike, or the team is going in circles. Trigger phrases include "ich komme nicht weiter", "wir drehen uns im Kreis", "alle Ideen klingen gleich", "I am stuck", "break the pattern", "shake things up", "we need a jolt".

2026-04-26
innovate-phase
project-management-specialists

Run a specific phase (0 through 5) of the Vibe Innovation Framework. Reads the current ICD, executes the full phase prompt, writes the structured output back to the ICD. Use when the user wants to advance to the next phase, re-run a specific phase, or jump directly into Phase N because their starting TRL maps there. Trigger phrases include "Phase 2 starten", "weiter mit Phase 3", "run phase 1", "ideation phase", "do phase 4 build", "advance to validation".

2026-04-26
innovate
management-analysts-131111

Start the Vibe Innovation Framework. Runs entry diagnostic, session planning, ICD initialization, and phase dispatch from the user's current uncertainty level (TRL -2 to 4). Use when the user wants to begin a new innovation project, has only a vague idea or none at all, asks where to start, needs the framework's entry routing, or wants to resume from an existing ICD. Trigger phrases include "start innovation", "ich habe eine Idee", "wo fange ich an", "let us begin", "neues Projekt", "framework run starten", "I want to ideate".

2026-04-26
innovate-status
project-management-specialists

Show current innovation project status: TRL, active phase, open assumptions, loop-back budget, and recommended next step. Use when the user wants a quick situational read, asks where the project stands, needs a status report between sessions, or before deciding the next move. Trigger phrases include "status", "wo stehen wir", "was ist offen", "current TRL", "what is next", "Lagebild".

2026-04-26
chaos
market-research-analysts-and-marketing-specialists-131161

Run the divergent, psychodelic, chaos protocol. A deliberate cognitive jolt that emits heterogeneous fragments (facts, poetry, multilingual shards, silence, non-sequiturs) to dissolve calcified thought patterns and surface genuinely new associations. Use when divergence has collapsed, the user is stuck, convergent thinking has locked the option space, all ideas sound alike, or the team is going in circles. Trigger phrases include "ich komme nicht weiter", "wir drehen uns im Kreis", "alle Ideen klingen gleich", "I am stuck", "break the pattern", "shake things up", "we need a jolt".

2026-04-26
innovate-phase
project-management-specialists

Run a specific phase (0 through 5) of the Vibe Innovation Framework. Reads the current ICD, executes the full phase prompt, writes the structured output back to the ICD. Use when the user wants to advance to the next phase, re-run a specific phase, or jump directly into Phase N because their starting TRL maps there. Trigger phrases include "Phase 2 starten", "weiter mit Phase 3", "run phase 1", "ideation phase", "do phase 4 build", "advance to validation".

2026-04-26
innovate
market-research-analysts-and-marketing-specialists-131161

Start the Vibe Innovation Framework. Runs entry diagnostic, session planning, ICD initialization, and phase dispatch from the user's current uncertainty level (TRL -2 to 4). Use when the user wants to begin a new innovation project, has only a vague idea or none at all, asks where to start, needs the framework's entry routing, or wants to resume from an existing ICD. Trigger phrases include "start innovation", "ich habe eine Idee", "wo fange ich an", "let us begin", "neues Projekt", "framework run starten", "I want to ideate".

2026-04-26
innovate-status
natural-sciences-managers-119121

Show current innovation project status: TRL, active phase, open assumptions, loop-back budget, and recommended next step. Use when the user wants a quick situational read, asks where the project stands, needs a status report between sessions, or before deciding the next move. Trigger phrases include "status", "wo stehen wir", "was ist offen", "current TRL", "what is next", "Lagebild".

2026-04-26
Showing top 8 of 18 collected skills in this repository.
Showing 1 of 1 repositories
All repositories loaded