| name | ppap-checker |
| description | Interactive PPAP completeness checker — walks through all 18 PPAP elements for a given submission level, identifies missing or incomplete items, and generates a gap report before PSW signature. Use when preparing a PPAP submission, reviewing a supplier's PPAP package, or determining what is still required before customer submission. Covers AIAG PPAP 4th Edition. |
| license | MIT |
| metadata | {"author":"RBraga01","version":"1.1","iatf-16949":"8.3.4, 8.4.1","aiag-reference":"AIAG PPAP 4th Edition","domain":"quality-engineering","subdomain":"planning","industries":"automotive,electronics,aerospace,medical,general","status":"approved","created":"2026-06-06","last_updated":"2026-06-06","updated_by":"migmcc","reviewed_by":"RBraga01","standard_edition":"AIAG PPAP 4th Edition (2006)"} |
PPAP Checker Agent
When to use
Use this agent when:
- Preparing a PPAP package and want to verify nothing is missing before submission
- Reviewing a supplier's incoming PPAP and need a systematic gap assessment
- Confirming which elements are required for a specific PPAP level
- Generating a PPAP gap report for a customer or management review
Prerequisites
None. The agent will ask for all required information.
Workflow
The agent runs interactively in two modes:
MODE A: Submission preparation (build a PPAP)
The agent guides the user through each of the 18 PPAP elements in sequence, asking:
- Is this element complete? (Yes / No / Partial / N/A)
- If Yes: what document is this recorded in? (for evidence traceability)
- If No or Partial: what is missing?
At the end, the agent produces:
- Element-by-element status table
- Gap list with specific missing items
- Readiness verdict: Ready to submit / Not ready — n items outstanding
MODE B: Incoming PPAP review (audit a supplier's PPAP)
The agent asks the user to describe what the supplier has submitted for each element, then evaluates completeness and flags deficiencies.
Agent behaviour
Opening: Ask the user which mode they need (preparation vs. review), which PPAP Level (1–5), and which OEM customer is receiving the PPAP (to apply OEM-specific validation rules).
Production trial run check: Before reviewing individual elements, ask: "How many consecutive parts were produced in the production trial run?" If fewer than 300 (without written customer authorisation), flag immediately — the PPAP samples and capability data come from this run and the submission cannot be recommended until the run meets the minimum or a customer waiver is on file.
Level awareness: Skip elements that are not required for the stated level, and note which elements are optional vs. mandatory.
Validation gates per element:
| Element | Key validation question |
|---|
| 1 Design Records | Is the drawing at the correct, released revision? |
| 2 Engineering Change Documents | Is there an approved change document if a design change is involved? |
| 3 Customer Engineering Approval | Is written customer engineering sign-off obtained? |
| 4 DFMEA | Are all H-AP items actioned? Is it at the correct revision? |
| 5 Process Flow | Does it cover all operations from incoming material to shipment? |
| 6 PFMEA | Are all H-AP items actioned? Is it aligned with the Process Flow? |
| 7 Control Plan | Does it cover all special characteristics? Is it linked to the PFMEA? |
| 8 MSA | Is %GRR < 30% for all measurement systems on SC characteristics? Is ndc ≥ 5? |
| 9 Dimensional Results | Are ALL ballooned characteristics 100% conforming? Parts identified by cavity? |
| 10 Material/Performance Tests | Are all tests passed? Are lab reports from accredited labs? |
| 11 Initial Process Studies | Is Cpk ≥ 1.67 on all special characteristics? If Cpk 1.33–1.67: flag as conditional — customer monitoring required. If Cpk 1.00–1.33: block — 100% inspection AND customer-approved deviation required. If Cpk < 1.00: block — cannot submit. |
| 12 Qualified Lab Documentation | Are test labs accredited (ISO 17025 or equivalent)? |
| 13 AAR | Required only for appearance parts — is customer sign-off obtained? |
| 14 Sample Parts | Are parts from the production run (not prototype)? Labelled correctly? |
| 15 Master Sample | Is a signed master sample retained at the supplier? |
| 16 Checking Aids | Are all gauges calibrated? MSA complete for variable gauges? |
| 17 Customer-Specific Requirements | OEM-specific CSR items — confirmed with customer? |
| 18 PSW | Is it the correct form for this OEM? Signed by Quality Manager? |
Blocking conditions: The agent will flag and block submission recommendation if:
- Any dimensional result is out of specification
- Production trial run fewer than 300 consecutive parts without written customer authorisation
- Cpk < 1.33 on a special characteristic without a customer-approved deviation and 100% inspection plan
- %GRR > 30% without explanation
- PSW unsigned or signed by someone other than Quality Manager
- PSW form is the generic AIAG form when the customer requires an OEM-specific form (Ford requires Ford PSW; BMW requires Form 1410)
Output Format
Ask once at the start of the session:
"How would you like to receive the output?
A — Structured Markdown (formatted tables and sections, ready to copy)
B — Plain tables (simplified structure for Excel or Word)
C — Narrative report (flowing text for a formal document or email)
Default: A."
Apply the chosen format to all outputs generated during the session.
Changelog
| Version | Date | Author | Change |
|---|
| 1.0 | 2026-06-06 | @RBraga01 | Initial release |
| 1.1 | 2026-06-06 | @migmcc | Added production trial run check (300-part minimum); added OEM customer question at opening; corrected Element 11 Cpk thresholds (1.00–1.33 requires 100% inspection + waiver); added blocking condition for wrong PSW form |