| description | Creates and audits GitHub Issues + Project board items for Stack-and-Flow following the canonical board fields and issue template. Trigger: create task, start work, assign issue, move to In progress, end work, close task, move to Done, add component to board, audit GitHub Project issues, delegated from sdd-tasks.
|
| license | Apache-2.0 |
| metadata | {"author":"stack-and-flow","version":"2.0"} |
Activation Contract
Use this skill for Stack-and-Flow GitHub issue + Project board work. It has four modes:
- CREATE — create issue(s), add to Project, set fields.
- START WORK — after the linked issue has label
status:approved, verify the assignee is empty or already the contributor/user, assign the issue, move the Project item to In progress, and record the branch/worktree plan before implementation starts. If the issue is assigned to someone else, stop before any mutation and require explicit permission to reassign it.
- END WORK — comment validation/PR evidence and move the Project item to
Done only after the task is genuinely complete.
- AUDIT — detect malformed existing issues or board items.
When delegated from sdd-tasks, run CREATE for each implementation task and return the SDD task-created envelope requested by the orchestrator.
Required Reference
Before writing an issue body, read:
skills/github-project-tasks/references/issue-body-template.md
That template is the single source of truth for the issue body. Do not duplicate it in this skill.
Project Board Reference Data
| Field | Value |
|---|
| Owner | Stack-and-Flow |
| Project number | 1 |
| Project node ID | PVT_kwDOEHd14s4BUsw- |
| Status values | Todo, In progress, Done |
| Team values | Squad 1, Squad 2, Squad 3 |
| Category values | component, fix, infra, a11y, docs, tokens |
| Milestone values | Query open repo milestones at creation time; current values are Core, MVP, V1 |
Field IDs:
| Field | ID |
|---|
| Status | PVTSSF_lADOEHd14s4BUsw-zhCIcdo |
| Team | PVTSSF_lADOEHd14s4BUsw-zhCIcqA |
| Category | PVTSSF_lADOEHd14s4BUsw-zhDyHaQ |
Option IDs:
| Field | Value | Option ID |
|---|
| Category | component | c68ff6ff |
| Category | fix | 90c78b01 |
| Category | infra | 78447643 |
| Category | a11y | d8f02829 |
| Category | docs | 30905538 |
| Category | tokens | 33054117 |
| Status | Todo | f75ad846 |
| Status | In progress | 47fc9ee4 |
| Status | Done | 98236657 |
| Team | Squad 1 | 9282166a |
| Team | Squad 2 | 8a5d08e5 |
| Team | Squad 3 | 478d0b17 |
Hard Rules
- Never use emojis in issue body markdown; Windows/PowerShell +
gh can corrupt them.
- Avoid accent marks in section headings; body text may use accents.
- Always write multi-line issue bodies to a temp file and pass
--body-file.
- Confirm task name, tier/type, reference URL when applicable, assignee, team, category, and milestone before CREATE.
- Milestone is mandatory for CREATE. If it is missing, ask interactively before creating the issue; do not invent it.
- Before implementation starts from a GitHub issue, require the exact issue label
status:approved, then run START WORK: verify current assignees, assign the issue to the contributor/user, and move the Project item to In progress.
- If a linked issue is already assigned to someone other than the contributor/user, stop before assignment, Project status changes, branch/worktree actions, planning, or implementation. Notify the user:
Issue #{number} is already assigned to @{assignee}; ask for explicit permission before reassigning it. Continue only after explicit permission is provided in the current task context.
- Before marking a task done, run END WORK: add validation/PR evidence and move the Project item to
Done only when merged or explicitly approved by the maintainer/user.
- Do not invent a missing reference URL; ask or research.
Issue Titles
[ATOMS] ComponentName
[MOLECULES] ComponentName
[ORGANISMS] ComponentName
[FIX] description-of-bug
[UPDATE] description-of-change
[ADD] description-of-addition
[INFRA] description-of-infra-task
[DOCS] description-of-docs-task
Mode 1 — CREATE
- Read the issue body template reference.
- Collect required fields interactively when missing: task name, tier/type, reference URL when applicable, assignee, Team, Category, and Milestone.
- List available open milestones before asking for Milestone:
gh api repos/Stack-and-Flow/design-system/milestones --jq '.[].title'
When running inside Pi, present the open milestone titles as an interactive single-select question, the same way Team/Squad is selected. If the user picks a milestone that is not open in GitHub, stop and ask for a valid milestone or maintainer action to create it.
- Fill placeholders into a temp file.
- Create issue with the selected milestone:
$issueUrl = gh issue create `
--repo Stack-and-Flow/design-system `
--title "[ATOMS] {ComponentName}" `
--milestone "{milestone}" `
--body-file "$env:TEMP\issue-body.md"
If the issue already exists or was created without milestone, set it explicitly:
gh issue edit {issue_number} `
--repo Stack-and-Flow/design-system `
--milestone "{milestone}"
- Add issue to board:
$itemId = gh project item-add 1 `
--owner Stack-and-Flow `
--url $issueUrl `
--format json | ConvertFrom-Json | Select-Object -ExpandProperty id
- Set Status, Team, and Category with
gh project item-edit using the field/option IDs above. The Project Milestone field is derived from the linked issue milestone; do not try to fake it as a single-select field.
- Report issue number, URL, board item ID, milestone, and fields set.
Mode 2 — START WORK
Run this before implementation starts from an existing GitHub issue or board card, after the linked issue has label status:approved. Offline/no-network mode may skip GitHub mutations only after evidence confirms the label is present and the assignee gate is satisfied; it does not permit implementation without status:approved or against an issue assigned to someone else without explicit reassignment permission.
Inputs required:
- Issue URL or issue number.
- Evidence that the linked issue has label
status:approved.
- GitHub username of the contributor/user doing the work.
- Planned branch name.
- Planned worktree path when a worktree will be used.
- Explicit maintainer/user permission to reassign, only when the issue is already assigned to someone else.
Steps:
- Confirm the issue is the right task and the contributor/user is correct.
- Verify the exact issue label
status:approved is present. If it is missing, stop; do not assign the issue or move the Project item to In progress.
$approvalLabel = gh issue view {issue_number} `
--repo Stack-and-Flow/design-system `
--json labels `
--jq '.labels[].name' | Select-String -SimpleMatch 'status:approved'
If $approvalLabel is empty, the approval gate is not satisfied. Stop; implementation must not start under any circumstance.
- Verify assignee ownership before any mutation, branch/worktree action, planning, or implementation:
$assignees = gh issue view {issue_number} `
--repo Stack-and-Flow/design-system `
--json assignees `
--jq '.assignees[].login'
$ownedByContributor = $assignees | Select-String -SimpleMatch '{username}'
$assignedToOther = $assignees | Where-Object { $_ -and $_ -ne '{username}' }
If $assignedToOther is not empty and explicit maintainer/user permission to reassign is not present in the current task context, stop before mutating GitHub or starting work. Notify the user: Issue #{number} is already assigned to @{assignee}; ask for explicit permission before reassigning it.
- Assign the issue when it is unassigned, already assigned to
{username}, or explicit reassignment permission was provided:
gh issue edit {issue_number} `
--repo Stack-and-Flow/design-system `
--add-assignee {username}
- Ensure the issue is on Project
1. If not, add it with gh project item-add.
- Resolve the Project item ID for existing cards:
$issueUrl = "https://github.com/Stack-and-Flow/design-system/issues/{issue_number}"
$itemId = gh project item-list 1 `
--owner Stack-and-Flow `
--format json `
--limit 200 `
--jq ".items[] | select(.content.url == \"$issueUrl\") | .id"
If $itemId is empty after adding/checking the Project item, stop and report the blocker.
- Move Project Status to
In progress:
gh project item-edit `
--project-id PVT_kwDOEHd14s4BUsw- `
--id $itemId `
--field-id PVTSSF_lADOEHd14s4BUsw-zhCIcdo `
--single-select-option-id 47fc9ee4
- Confirm Team and Category are set. If missing, set them using the option IDs above.
- Report the work-start state:
## Work Started
**Issue**: #{number} — {title}
**Assignee**: @{username}
**Approval gate**: issue label `status:approved` verified
**Assignee gate**: issue was unassigned, already assigned to @{username}, or explicit reassignment permission was recorded
**Project status**: In progress
**Team**: {team}
**Category**: {category}
**Branch**: `{branch}`
**Worktree**: `{path or "not used"}`
Do not start implementation if the status:approved label is missing or unverified. Do not start implementation if the assignee gate fails, assignment fails, item lookup fails, or In progress status fails, unless the user explicitly asks to continue offline/no-network after both the approval label and assignee gate have been verified.
Branch and Worktree Naming
Use this convention when START WORK records or creates a branch/worktree:
branch: {type}/{issue-number}-{slug}
worktree: ../design-system-{type}-{issue-number}-{slug}
Examples:
feat/123-button
fix/128-modal-focus-trap
docs/142-contributor-flow
../design-system-feat-123-button
Choose {type} from the Conventional Commit type that best matches the task (feat, fix, docs, chore, refactor, test, etc.). Build {slug} from the issue title without the [ATOMS] / [FIX] prefix, lowercased and dash-separated.
If the user provides a different branch name, keep it only when it still follows Conventional Commit branch prefixes or the user explicitly approves the exception.
Mode 3 — END WORK
Run this when implementation is verified and the task is ready to close. Move the Project item to Done only after the PR is merged or the maintainer/user explicitly says the task should be closed.
Inputs required:
- Issue URL or issue number.
- Merged PR URL, or an explicit maintainer/user closure approval when there is no PR.
- Validation evidence: tests/build/storybook/manual checks run.
- Known follow-up issues, if any.
Steps:
- Verify closure eligibility before any mutation:
- If using a PR, confirm it is merged with
gh pr view {pr_url_or_number} --repo Stack-and-Flow/design-system --json mergedAt,url and require mergedAt to be non-null.
- If there is no PR, require explicit maintainer/user approval in the current task context and record that approval in the completion comment.
- Resolve the Project item ID using the START WORK item lookup pattern.
- Write a concise completion comment to the issue:
$body = @'
## Work completed
Validation:
- {command}: {result}
- {manual check}: {result}
Landing evidence: {merged_pr_url_or_explicit_approval}
Follow-up: {follow_up_or_none}
'@
$body | Out-File -FilePath "$env:TEMP\work-completed.md" -Encoding utf8
gh issue comment {issue_number} `
--repo Stack-and-Flow/design-system `
--body-file "$env:TEMP\work-completed.md"
- Move Project Status to
Done:
gh project item-edit `
--project-id PVT_kwDOEHd14s4BUsw- `
--id $itemId `
--field-id PVTSSF_lADOEHd14s4BUsw-zhCIcdo `
--single-select-option-id 98236657
- Return:
## Work Ended
**Issue**: #{number} — {title}
**Project status**: Done
**Landing evidence**: {merged PR URL or explicit approval}
**Validation**: {summary}
**Follow-up**: {list or "None"}
If the PR is not merged, closure approval is missing, validation evidence is missing, or the user requests offline/no-network work, return ## Work End Skipped with the required follow-up instead of mutating GitHub.
Mode 4 — AUDIT
Fetch board items:
gh project item-list 1 `
--owner Stack-and-Flow `
--format json | ConvertFrom-Json | Select-Object -ExpandProperty items
Check each item:
| Check | Pass condition |
|---|
| Title format | Starts with an approved prefix. |
| Body not empty | content.body is not empty/null. |
| Has workflow checklist | Body contains ### Current workflow and START WORK / END WORK checklist items. |
| No emoji corruption | Body does not contain ���. |
| Has reference section | Body contains ### Reference. |
| Has spec or plan section | Body contains ### Specification or plan. |
| Has accessibility impact section | Body contains ### Accessibility impact. |
| Has validation plan | Body contains ### Validation plan. |
| Has work start section | Body contains ### Work start state. |
| Has PR/completion section | Body contains ### PR and completion evidence. |
| Has notes section | Body contains ### Notes. |
| Has resources section | Body contains ### Resources. |
| Board fields set | status, team, category are present. |
| Milestone set | Issue has a GitHub milestone assigned. |
| In progress has assignee | Items in In progress have at least one assignee. |
| Assigned Todo is intentional | Assigned issues still in Todo are flagged for confirmation. |
| Done has closure evidence | Items in Done have a merged PR link or explicit maintainer/user closure note plus validation evidence. |
Auto-fix only board fields and obvious title prefix/casing. Ask before rewriting bodies, missing references, missing assignees, or corrupted content.
Output Contract
For CREATE or AUDIT:
## GitHub Project Tasks Result
**Mode**: CREATE / AUDIT
**Issues touched**: {list}
**Board fields set**: {status/team/category or "n/a"}
**Milestone**: {milestone or "missing"}
**Violations**: {list or "None"}
**Needs human input**: {list or "None"}
For START WORK, return the ## Work Started report shown in Mode 2, or:
## Work Start Skipped
**Issue**: #{number} — {title}
**Reason**: offline/no-network requested, issue already assigned to someone else without explicit reassignment permission, or GitHub mutation failed after `status:approved` was verified
**Approval gate**: issue label `status:approved` verified; if not verified, implementation remains blocked
**Assignee gate**: {unassigned / already assigned to @{username} / assigned to @{assignee}; explicit reassignment permission required}
**Required follow-up**: get explicit permission before reassigning when assigned to someone else; then assign issue, move Project status to `In progress`, confirm team/category
**Branch**: `{branch}`
**Worktree**: `{path or "not used"}`
For END WORK, return the ## Work Ended report shown in Mode 3, or:
## Work End Skipped
**Issue**: #{number} — {title}
**Reason**: offline/no-network requested, PR not merged, missing explicit closure approval, missing validation evidence, or GitHub mutation failed
**Required follow-up**: comment validation and merged PR/approval evidence, then move Project status to `Done` when approved
**Landing evidence**: {merged PR URL, explicit approval, or "missing"}
**Validation**: {summary or "missing"}