Database Migration
Overview
Write safe, reversible database migrations that won't take down production.
Every migration gets a rollback plan, data backup commands, lock impact
analysis, verification queries, and a deployment runbook. The core principle:
if you can't reverse it safely, don't ship it.
When to use
- The task changes an existing database schema, constraints, indexes, or stored data through a migration.
- The user needs forward and rollback steps, safety analysis, verification queries, or deployment guidance.
- The migration must be safe for shared, staging, or production environments.
- The request involves
ALTER TABLE, backfills tied to schema evolution, or zero-downtime rollout concerns.
Do NOT use when:
- The task is designing a schema from scratch with no migration path.
- The request is ad hoc application SQL rather than a migration artifact.
- The work is a pure data script or ETL job with no schema-change lifecycle.
Response format
Always structure the final response with these top-level sections, in this order:
- Summary — state the task, scope, and main conclusion in 1-3 sentences.
- Decision / Approach — state the key classification, assumptions, or chosen path.
- Artifacts — provide the primary deliverable(s) for this skill. Use clear subheadings for multiple files, commands, JSON payloads, queries, or documents.
- Validation — state checks performed, important risks, caveats, or unresolved questions.
- Next steps — list concrete follow-up actions, or write
None if nothing remains.
Rules:
- Do not omit a section; write
None when a section does not apply.
- If files are produced, list each file path under Artifacts before its contents.
- If commands, JSON, SQL, YAML, or code are produced, put each artifact in fenced code blocks with the correct language tag when possible.
- Keep section names exactly as written above so output stays predictable across skills.
Workflow
1. Analyze the Schema Change
Before writing any SQL, understand the full impact:
- What tables are affected? Check row counts — a 100-row config table and a
100M-row events table need completely different strategies.
- What columns are involved? Nullable vs NOT NULL, defaults, data types.
- Who reads/writes this table? Identify application code, background jobs,
and reporting queries that touch the affected columns.
- What database engine? PostgreSQL, MySQL, and SQLite have different locking
behaviors. Ask if not obvious.
Output: A brief impact summary stating table(s), estimated row count, and
affected consumers.
2. Assess Lock and Downtime Impact
Every ALTER TABLE acquires some form of lock. Classify the impact:
| Operation (PostgreSQL) | Lock Level | Downtime Risk |
|---|
| ADD COLUMN (nullable, no default) | ACCESS EXCLUSIVE | Instant |
| ADD COLUMN (with volatile default) | ACCESS EXCLUSIVE | Blocks all |
| ADD COLUMN (with constant default, 11+) | ACCESS EXCLUSIVE | Instant |
| DROP COLUMN | ACCESS EXCLUSIVE | Instant |
| RENAME COLUMN | ACCESS EXCLUSIVE | Instant |
| ALTER COLUMN TYPE | ACCESS EXCLUSIVE | Rewrites table |
| CREATE INDEX | SHARE lock | Blocks writes |
| CREATE INDEX CONCURRENTLY | SHARE UPDATE EXCL. | Non-blocking |
| ADD NOT NULL constraint | ACCESS EXCLUSIVE | Scans table |
| ADD CHECK constraint (NOT VALID) | ACCESS EXCLUSIVE | Instant |
| VALIDATE CONSTRAINT | SHARE UPDATE EXCL. | Non-blocking |
For MySQL, note that many ALTERs require a full table copy. Use
pt-online-schema-change or gh-ost for large tables.
Output: Lock classification and estimated duration for the table size.
3. Write the Up Migration
Write the forward migration SQL. Apply these safety rules:
-
Set a lock timeout to avoid blocking the entire application:
SET lock_timeout = '5s';
-
Use transactions for DDL that supports it (PostgreSQL does, MySQL doesn't
for most DDL).
-
Split large operations into safe steps. Never combine a schema change with
a large data backfill in the same transaction.
-
Add columns as nullable first, then backfill, then add the NOT NULL
constraint separately.
-
Create indexes concurrently on large tables (PostgreSQL: CONCURRENTLY,
MySQL: use online DDL or gh-ost).
Output: migration.sql — the up migration file.
4. Write the Down Migration (Rollback)
Every up migration MUST have a corresponding down migration. This is
non-negotiable.
- The rollback must undo the up migration completely.
- If the up migration added a column, the down drops it.
- If the up migration renamed a column, the down renames it back.
- If the up migration created an index, the down drops it.
- Data loss warning: If the rollback would lose data (e.g., dropping a
column that was populated), document this explicitly.
Output: rollback.sql — the down migration file.
5. Add Data Backup Commands
Before any destructive or risky migration, provide backup commands:
CREATE TABLE orders_backup_20260306 AS SELECT * FROM orders;
CREATE TABLE orders_email_backup_20260306 AS
SELECT id, email FROM orders;
SELECT
(SELECT count(*) FROM orders) AS original,
(SELECT count(*) FROM orders_backup_20260306) AS backup;
For very large tables, suggest pg_dump with table filtering instead of
CREATE TABLE AS.
Output: Backup commands included in the runbook.
6. Write Verification Queries
After the migration runs, how do you know it worked? Write queries that verify:
- Schema is correct: Column exists, has right type, right default, right
constraints.
- Data is intact: Row counts match, no unexpected NULLs, values in expected
range.
- Application works: Key queries still return expected results.
SELECT column_name, data_type, is_nullable, column_default
FROM information_schema.columns
WHERE table_name = 'orders' AND column_name = 'email';
SELECT count(*) FROM orders;
SELECT count(*) FROM orders WHERE email IS NULL;
Output: Verification queries included in the runbook.
7. Create Deployment Runbook
Compile everything into a runbook that an on-call engineer can follow:
## Migration Runbook: [description]
### Pre-flight
- [ ] Backup commands executed and verified
- [ ] Lock timeout set
- [ ] Off-peak deployment window confirmed
- [ ] Application code deployed (if dual-write needed)
### Execute
1. Run migration.sql
2. Verify with verification queries
3. Monitor error rates for 15 minutes
### Rollback (if needed)
1. Run rollback.sql
2. Verify rollback with verification queries
3. Restore from backup if data was lost
### Post-migration
- [ ] Remove old column/compatibility code (after soak period)
- [ ] Update documentation
- [ ] Close migration ticket
Output: runbook.md — the deployment runbook.
Safety Checklist
Before considering any migration complete, verify:
Common Migration Patterns
Adding a non-nullable column with default (large table)
Unsafe — blocks reads and writes while rewriting the entire table:
ALTER TABLE orders ADD COLUMN status varchar(50) NOT NULL DEFAULT 'pending';
Safe — three-step approach:
ALTER TABLE orders ADD COLUMN status varchar(50);
UPDATE orders SET status = 'pending' WHERE status IS NULL AND id BETWEEN 1 AND 100000;
UPDATE orders SET status = 'pending' WHERE status IS NULL AND id BETWEEN 100001 AND 200000;
ALTER TABLE orders ALTER COLUMN status SET NOT NULL;
ALTER TABLE orders ALTER COLUMN status SET DEFAULT 'pending';
Renaming a column
Unsafe — breaks all application code instantly:
ALTER TABLE users RENAME COLUMN email TO email_address;
Safe — dual-write strategy:
ALTER TABLE users ADD COLUMN email_address varchar(255);
UPDATE users SET email_address = email WHERE email_address IS NULL;
ALTER TABLE users DROP COLUMN email;
Adding an index on a large table
Unsafe — blocks all writes for the duration:
CREATE INDEX idx_orders_customer_id ON orders(customer_id);
Safe — non-blocking:
CREATE INDEX CONCURRENTLY idx_orders_customer_id ON orders(customer_id);
Note: CONCURRENTLY cannot run inside a transaction. It takes longer but
doesn't block writes. For a 100M row table, expect 10-30 minutes depending on
hardware.
Common Mistakes
| Mistake | Fix |
|---|
| No rollback migration | Every up migration MUST have a down migration. No exceptions. |
| No data backup commands | Include CREATE TABLE AS or pg_dump commands before destructive changes |
| Ignoring lock impact on large tables | Always check row count and classify lock level before writing SQL |
| Using CREATE INDEX without CONCURRENTLY | On tables > 1M rows, always use CONCURRENTLY (PostgreSQL) or online DDL |
| Adding NOT NULL column with default in one step | Split into: add nullable → backfill in batches → add constraint |
| Bare RENAME COLUMN in production | Use dual-write strategy: add new → backfill → migrate reads → drop old |
| No verification queries | Write queries that confirm schema correctness and data integrity post-migration |
| Missing deployment runbook | Create a step-by-step runbook with pre-flight, execute, rollback, and post-migration sections |
| Backfilling millions of rows in one UPDATE | Batch updates (10k-100k rows per batch) to avoid long-running transactions |
| Running migrations during peak traffic | Schedule for off-peak hours; set lock_timeout to fail fast if locks can't be acquired |
Key Principles
-
Every migration must be reversible — If you can't write a rollback that
undoes the change, the migration is too risky. Restructure it into smaller,
reversible steps. The only exception is dropping a column that was already
emptied — and even then, document the data loss.
-
Always include verification queries — "It ran without errors" is not
verification. Write queries that prove the schema is correct, data is intact,
and the application still works. Run these after every migration AND after
every rollback.
-
Respect table size — A migration that's instant on a 1,000-row dev table
can lock production for 30 minutes on a 100M-row table. Always ask about row
counts and adjust strategy accordingly. When in doubt, assume the table is
large.
-
Separate schema changes from data changes — Never combine ALTER TABLE
with a large UPDATE in the same transaction. Schema changes should be
instant; data backfills should be batched. This prevents long-held locks and
makes rollback simpler.
-
Fail fast, don't block — Set lock_timeout so migrations fail quickly if
they can't acquire locks, rather than blocking all application queries while
waiting. A failed migration you can retry is better than a blocked
application.
Optimization Notes
- Preserve the user's requested output shape exactly and do not substitute generic advice for concrete artifacts.
- Include exact commands, code structures, protocol fields, tags, parameters, file paths, or deliverable sections when the task asks for them.
- Make safety gates explicit before irreversible, destructive, externally visible, or compliance-sensitive actions.
- For multi-step work, present steps in execution order and include validation or rollback checks where relevant.
- Avoid overfitting to a single eval example: express lessons as reusable rules, not as task-specific answers.