When to Use
- User runs
/mvp with an idea, description, or PRD
- Speed is the priority over thoroughness
MVP Mindset: Cut everything that isn't the core loop. Ship ugly. Fix later. Every minute planning is a minute not shipping.
Phase 1: 60-Second Intake
Read what the user provided. Ask at most 3 clarifying questions — only true blockers that would break the entire scope. Assume everything else. Document assumptions in state.json.
Safe assumptions (make without asking):
- Auth → email/password or OAuth (pick based on context)
- DB → SQLite for local, Postgres for hosted
- Styling → Tailwind or ShadCN, no custom design
- Tests → smoke tests only, not full coverage
- Deployment → default for detected stack (Vercel for Next.js, Railway for Node, etc.)
Phase 2: MVP Scope Razor
For every feature, apply: Does the product BREAK without this?
- YES → MVP
- NO → Defer to v2
## MVP Scope
| Feature | Decision | Reason |
|----------|----------|---------------------------------------------|
| [feature] | ✅ MVP | Core loop — product doesn't work without it |
| [feature] | 🚫 v2 | Nice-to-have, doesn't block first users |
State the MVP in one sentence: "A user can [do the one core thing]."
Phase 3: Parallel Task Breakdown
Break MVP into tasks that run simultaneously. Goal: maximum parallelization.
Rules:
- Each task must be self-contained (no waiting on another)
- Shared data models go first (foundation)
- Target: 2–4 parallel streams after foundation
## Parallel Execution Plan
### Foundation (sequential — do first)
TASK-001: [Project setup, DB schema, auth scaffold] — ~[time]
### Stream A (start after TASK-001)
TASK-002: [Feature A] — ~[time]
### Stream B (start after TASK-001)
TASK-003: [Feature B] — ~[time]
### Stream C (start after TASK-001)
TASK-004: [Feature C] — ~[time]
### Integration (after all streams)
TASK-005: [Wire together, smoke test, deploy] — ~[time]
Phase 4: Set MVP Mode
Write state.json with mode: "mvp":
{
"mode": "mvp",
"mvp_settings": {
"vibe_mode": true,
"skip_designer": true,
"skip_tdd": true,
"skip_full_security_audit": true,
"defer_sbom": true,
"parallelization": "aggressive",
"scope_locked": true
}
}
What changes in MVP mode:
| Gate / Process | Normal | MVP Mode |
|---|
| Clarifying questions | Unlimited | Max 3 |
| Designer review | Required | Skipped |
| TDD | Encouraged | Skipped — ship first |
| Security audit | Pre-push | Deferred — run post-MVP |
| SBOM | On dep change | Deferred |
| Quality gate | Full 4-stage | Lite — lint + basic test only |
| Consultant escalation | On blockers | Haiku fallback first |
| Scope changes | Normal | Locked — no creep |
Non-negotiable even in MVP mode:
- No hardcoded secrets
- No dependency added without supply chain Gate 1 approval
- All work committed (no uncommitted changes)
npm audit / pip-audit quick scan before deploy
Phase 5: Scaffold
- Delete
.gitignore, rename .gitignore.project → .gitignore
- Write
.agents/state.json with mode: "mvp", all tasks, parallel plan
- Update
.agents/state.md with MVP scope and parallel map
- Update
.agents/workspace-map.md with planned structure
- Write minimal
CLAUDE.md addition: stack + commands only (no lengthy conventions)
- Create GitHub Issues for each task (optional — skip if user wants to move immediately)
Phase 6: Launch Plan
Tell the user exactly how to execute:
╔══════════════════════════════════════════════════════════════════╗
║ 🚀 MVP MODE ACTIVE — PARALLEL EXECUTION READY ║
╚══════════════════════════════════════════════════════════════════╝
Foundation first:
→ Manager spawns Engineer subagent → TASK-001
→ Wait for TASK-001 to complete
Then launch all streams simultaneously:
→ Manager spawns Engineer subagents for TASK-002, TASK-003, TASK-004 in parallel
→ All 3 run at the same time
While streams run:
→ Manager monitors / answers blockers
When streams complete:
→ Engineer TASK-005: wire together, smoke test, deploy
→ Lite quality gate: lint + basic tests
→ Ship
Total parallel sessions: [n]
Estimated wall time: [foundation + longest stream + integration]
Manager then spawns Engineer for TASK-001 immediately.
Post-MVP Hardening Checklist
Share this when the MVP ships:
## Post-MVP Hardening (run before real users)
- [ ] /security-audit — OWASP review on auth + API
- [ ] supply-chain skill — full 4-gate dependency review
- [ ] sbom skill — generate SBOM, scan CVEs
- [ ] quality-gate — full 4-stage (lint + type + test + security)
- [ ] Add Designer: review UX flows before marketing push
- [ ] Migrate smoke tests to proper coverage
- [ ] Set mode: "production" in state.json