| description | Generate ticket-ready right-sizing actions for a service, workload, or team. Triggers on phrases like "right-size", "rightsizing", "are we over-provisioned", "what can we shrink", "utilization opportunities". Pulls utilization data, generates concrete recommendations with dollar impact estimates, formatted so the practitioner can paste each one into a ticket and assign it. |
Right-Sizing Recommendations
When invoked, turn utilization data into a list of concrete actions an engineering team can act on. The output is not "your fleet is over-provisioned" — it's "shrink this specific instance from N1 to N2, save $X/month, here's the ticket text."
Inputs to confirm before starting
- Scope: service, workload, team, project, or specific resource list
- Utilization window (default: trailing 30 days)
- Resource types in scope (default: VMs, managed databases, persistent disks; expand on request)
- Constraints: anything that must NOT be touched (production-critical workloads, customer-impacting services, anything inside a change freeze)
Steps
-
Pull utilization. For each in-scope resource, get CPU, memory, network, and (where relevant) disk IOPS over the window. Also pull the current size/tier/SKU and its monthly cost.
-
Apply right-sizing logic. A resource is a candidate for right-sizing if:
- Down-size: P95 utilization on the binding dimension is below 40%, sustained across the window
- Up-size: P95 utilization on any dimension is above 85%, with throttling or evictions observed
- Schedule: utilization shows clear daily/weekly patterns (e.g., near-zero on weekends) and the resource isn't required 24/7
- Eliminate: <5% utilization across the window, no recent connections or queries
-
Skip the ones you shouldn't touch. Filter out anything matching the user's constraints. Also auto-skip:
- Resources with creation time within the last 14 days (too new to judge)
- Resources tagged with
do-not-rightsize or equivalent
- Resources whose owning team is in a change freeze
-
Estimate dollar impact. For each recommendation:
- Current monthly cost
- Projected cost after the change
- Monthly savings ($)
- Annualized savings ($)
- Confidence: high / medium / low (based on how stable the utilization pattern is)
-
Generate the ticket text. One ticket per recommendation. See template below.
Ticket template
Each ticket follows this format so the receiving engineer has everything they need without having to ask:
**Right-size [resource_id] from [current size] to [recommended size]**
**Why:** Trailing 30-day P95 utilization is [X]% on [CPU/memory/etc.],
well below the [threshold]% we use as the rightsize trigger.
**Action:** Change the instance type / tier / SKU.
**Impact:**
- Current monthly cost: $[A]
- Projected monthly cost: $[B]
- Monthly savings: $[A-B]
- Annualized: $[12*(A-B)]
**Risk:** [low / medium / high — name the specific risk if not low]
**Validation:** After deploying, monitor [metric] for [N] days. If
utilization climbs above [threshold]%, revert.
**Confidence:** [high / medium / low]
House rules
- Never recommend a change without an estimated dollar impact. A right-sizing recommendation without numbers is a chore, not an action.
- Round dollar figures to the nearest dollar for monthly, nearest hundred for annualized. False precision (
$47.32/month) makes the recommendation feel computed by a script and ignored.
- If confidence is low, say so — don't bury it. Engineering teams will tune you out fast if they get burned by a confident-sounding bad recommendation.
- For each batch of recommendations, include a one-line "if you do all of these" total at the top. That's the number leadership cares about.
Output format
## Headline
[Total recommendations: N | Total monthly savings if all applied: $X | Annualized: $Y]
## Recommendations (sorted by impact)
[One ticket per recommendation, in the format above]
## Skipped (and why)
[Any resources that would have been candidates but were excluded by constraints — useful for the practitioner to verify the skip reasons are still valid]
Customization notes
- The 40% / 85% / 5% thresholds are starting defaults. Tune them to your org's risk tolerance — production-heavy fleets might use 50% as the down-size trigger.
- If your org uses commitment-based discounts, factor that in: a right-size that drops a resource below a committed tier may not save what the on-demand math suggests.
- Add your specific change-management process to the ticket template (e.g., "this needs SRE review before merging") so the recommendations match how work actually gets done.