| name | ralph-loop-plan |
| description | Write Markdown implementation plans and checklists optimized for Ralph loops — one checkbox per agent run, autonomous ordering, integration tasks, verification criteria, and human-only gates at the end. Use when the user wants a Ralph loop plan, autonomous agent todo list, or says "use a ralph loop to build/create X" and needs the plan before running the loop. |
Ralph Loop Plan
When to use
- User wants to build something with a Ralph loop but has no plan yet
- User asks for an agent-suitable todo list or implementation checklist
- User wants to review or improve an existing Ralph loop plan
After creating the plan, use the ralph-loop skill to generate scripts/ralph-loop.sh and run the loop.
What makes a Ralph-ready plan
A Ralph loop plan is not a generic todo list. It is a state file on disk that fresh agents read each run to decide what to do next.
Each - [ ] checkbox = exactly one agent invocation. The loop script counts unchecked boxes and stops when they are all [x].
Human work belongs in a separate section without checkboxes at the end so the script does not spawn agents for it.
Quick workflow
When the user says "use a Ralph loop to build/create X":
- Clarify goal, stack, constraints (only if missing — do not block on perfection).
- Write architecture/spec section or link to a separate spec file for stable design reference.
- Break work into numbered checklist items sized for one agent run each.
- Order for autonomy — everything agents can do without humans first; manual validation last.
- Add integration, scenario, and cleanup items — not only isolated features.
- Save as
docs/<feature>-plan.md (or user-chosen path).
- Offer to generate the loop script via ralph-loop skill.
Plan document structure
Use plan-template.md. Required sections:
| Section | Purpose |
|---|
| Title + goal | One paragraph: what and why |
| How Ralph loops work here | 3–5 lines so each agent understands its role |
| Architecture/spec link | Stable design; agents read before coding |
| Contracts / invariants | Rules that must not be violated across items |
| Implementation Checklist | Numbered - [ ] items — only section with checkboxes |
| Manual validation | Human-only; no checkboxes |
Optional: file format contract, migration rules, glossary — keep long specs out of checklist items; link instead.
Task sizing (one checkbox = one agent run)
Right size
One item should be completable in a single fresh-context run (~15–45 min of agent work):
- Add one module or cohesive layer with tests
- Wire one integration point (e.g. service → API, library → CLI, module → UI)
- One scenario test covering a user flow slice
- One refactor/cleanup pass with verification
Each item includes:
- Bold numbered title —
- [ ] **N. Short title.**
- Implementation scope — what to build/change (2–6 sentences)
- Verification — exact command, test target, or pass/fail criteria (use the repo's existing test/lint/build tooling — do not assume a specific stack)
Too large (split)
- "Build the entire backend"
- "Add full UI" (split per screen or flow)
- "Implement entire data pipeline" (split: schema → ingest → transform → API → UI → scenarios)
Split along natural seams where each piece still builds and verifies independently.
Too small (merge)
- "Add import statement"
- "Rename one variable"
- "Fix typo in comment"
Merging reduces loop overhead and leaves room for meaningful verification.
Sizing heuristic
Ask: Can an agent read the spec, implement this, run verification, update the plan with notes, and exit — without needing another item immediately?
If yes → one item. If it needs a follow-up in the same breath → merge or split differently.
Ordering for autonomous runs
Foundation → Core features → Integration wiring → Scenario tests → Hardening/cleanup → Docs
↓
Manual validation (human)
Rules:
- Dependencies first — data/types before logic before interface before e2e.
- Vertical slices when possible — a thin end-to-end path early proves architecture (often items 2–4).
- Integration explicit — dedicated items to connect layers; never assume "it will wire itself."
- Scenario tests — at least one item near the end exercises real user flows across components.
- Cleanup pass — dedupe, remove temp artifacts, consolidate orchestration, optimize hot paths.
- Human gates last — staging deploys, hardware-specific testing, design sign-off, production release.
Checkbox format
Use numbered bold titles so scripts can parse reliably:
- [ ] **7. Add settings page for notification preferences.**
Wire form state to existing user settings API. Handle save errors and loading states.
Verification: `npm test -- SettingsPage.test.tsx` — pass.
Completed:
- [x] **6. Add input parser for config files.**
...
Verification: `cargo test parser::` — pass.
**Notes for later items:** Call `parse_config()` from loader (item 8). Unknown keys must be preserved, not dropped.
See examples.md for more patterns. Examples use varied stacks only to show shape — always match the target project's tools and conventions.
Notes for later items (required habit)
When an agent completes an item, it should leave Notes for later items if it learned:
- Exact verification commands that work
- File paths and types to use
- Gotchas, flags, or ordering constraints
- Decisions that affect downstream items
Write notes under the completed item and/or on specific future items. This is how the plan improves without restructuring.
Integration and "actually works"
Plans fail when items build isolated pieces that never connect. Prevent this:
| Phase | Example items |
|---|
| Early slice | Minimal schema/model + one read path + one test |
| Wire-up | Connect service to existing HTTP handler, CLI, or UI shell |
| Cross-cutting | Error handling, logging, config |
| Scenario | One end-to-end test mirroring a user story |
| Hardening | Performance, edge cases, parallel test stability |
Every feature plan should include at least:
- One integration checkbox (layers connected)
- One scenario / e2e checkbox (proves cohesive behavior)
- One cleanup/consolidation checkbox if the feature touched 5+ areas
Verification must be machine-runnable where possible — not "manual test" inside checkbox items.
Human-only section (no checkboxes)
## Manual Validation After The Checklist
This section intentionally has no checkboxes — the Ralph loop script only drives checkbox items.
- Deploy to staging and smoke-test critical flows manually
- Design or product review (copy, layout, accessibility)
- Production release approval per team process
The Ralph loop script must not treat these as agent tasks.
Cleanup and quality items
Include explicit late-plan items when the feature likely leaves debris:
- Consolidate duplicate orchestration into one coordinator
- Remove debug hooks, temp files, feature flags
- Optimize known hot paths discovered during implementation
- Fix flaky tests exposed by parallel runs
- Update user-facing docs and help copy
Label clearly: "Perform final integration hardening", "Consolidate X", "Remove temporary Y".
Architecture spec handling
- Small features — inline
## Architecture section in the plan (≤80 lines).
- Large features — separate
docs/<feature>-architecture.md; plan links to it.
- Checklist items say what to build; spec says how and invariants.
- Do not duplicate the whole spec in every item — reference sections.
Anti-patterns
| Bad | Good |
|---|
| Checkbox for "get user approval" | Note in Manual Validation |
| Item with no verification | Always state command or criteria |
| 50 tiny checkboxes | Merge related work |
| 3 mega checkboxes | Split by layer or flow |
[ ] in code examples inside spec | Use fenced examples without task-list syntax |
| Reordering items during loop | Plan amendment note at bottom instead |