sprint-manager
Agile is for teams. You need the planning, not the ceremony.
Capsule: SoloSprint
Invariant
A sprint for one person is a commitment device, not a process artifact. It answers: "what will I build this week?"
Example
Monday: pick 3-5 tickets sized S or M. Friday: review what got done. No standup, no retro, no velocity tracking. Just: did the things I planned get built?
//BOUNDARY: If a sprint becomes a source of guilt rather than focus, shorten it or simplify it. The sprint serves you, not the other way around.
Depth
- One week sprints. Two weeks is too long for ADHD — the deadline doesn't feel real until day 13.
- Sprint planning takes 15-30 minutes maximum. If it takes longer, the backlog needs grooming, not the plan.
- Never plan more than 70% capacity. ADHD brains need slack for the unexpected hyperfocus session or the unexpected energy drought.
- A sprint with 1 completed ticket beats a sprint with 5 planned and 0 completed.
Capsule: TaskSizing
Invariant
If a task can't be completed in a single work session, it's too big. Break it down.
Example
Too big: "Implement player movement." Right size: "Player moves left/right with arrow keys." Even smaller: "Player sprite renders on screen."
//BOUNDARY: Some tasks genuinely span sessions (art creation, complex systems). Mark these explicitly as multi-session and define session-sized checkpoints.
Depth
- Use T-shirt sizes, not hours. ADHD makes time estimation unreliable.
- S: One focused session (1-2 hours). Clear start and end.
- M: Half a day. May need one break. Still clear done criteria.
- L: Full day or multi-session. Must be breakable into S/M subtasks.
- XL: Too big. Break it down before it enters a sprint.
- The definition of "done" must be concrete. Not "player movement works" but "player moves left/right, stops at screen edges, animation plays."
- When breaking down an L, the first subtask should be the one that proves the approach works. Build confidence early.
Plane Setup
Recommended Project Structure
Workspace: Game Dev
├── Project: [Game Name] ← the game itself
├── Project: Learning ← boot.dev courses, tutorials
└── Project: Infrastructure ← k8s, tools, pipeline
Workflow States
Keep it simple. More states = more overhead.
| State | Meaning |
|---|
| Backlog | Captured but not committed to |
| Sprint | Committed for this sprint |
| In Progress | Actively working on it |
| Done | Meets the definition of done |
That's four states. Resist adding more. "Blocked," "In Review," and "QA" are team concepts. If you're blocked, add a comment and move on. If it needs review, review it yourself and mark done.
Labels
Labels serve two purposes: filtering and energy matching.
| Label Category | Values | Purpose |
|---|
| Size | S, M, L | Sprint planning capacity |
| Energy | high-energy, low-energy | Match to session type (see adhd-coach) |
| Domain | gameplay, art, audio, engine, tools, learning | Filter by what you're working on |
Modules
Use modules to group related issues that span multiple sprints:
- "Core Movement System" — all tickets related to player movement
- "Main Menu" — all UI/UX tickets for the menu
- "Chapter 1" — all content for the first chapter
Modules give you a cross-sprint view of feature progress.
Sprint Cadence
Pick a consistent day to plan and a consistent day to review. Monday/Friday works for a standard week; adjust to match your actual schedule. The rhythm matters more than the specific days.
Start of Week: Plan (15-30 min)
- Review last sprint: what got done? What didn't? (No guilt — just data.)
- Move incomplete tickets: back to backlog or into new sprint.
- Pick 3-5 tickets from the backlog. Mix of sizes and energy levels.
- Ensure at least one "quick win" (S-sized, low-energy) for momentum.
- Total planned work should feel slightly easy, not ambitious. Under-commit.
During the Week: Build
- Pick tickets based on current energy (see adhd-coach session patterns)
- Move tickets to "In Progress" when starting, "Done" when done
- New ideas → backlog ticket, not sprint addition
- If you finish everything early: pull ONE more ticket, or enjoy the slack
End of Week: Review (10 min)
- What got done? Celebrate it. Literally. ADHD brains need the reward signal.
- What didn't? Why? (Too big? Wrong energy? Life happened? No judgment.)
- Any tickets that have been in backlog for 4+ weeks? Either commit or delete.
- Write a breadcrumb for next-week-you: "The game is at [state]. Next week focus on [area]."
Backlog Health
A healthy backlog is small and current. An unhealthy backlog is a graveyard of good intentions.
Grooming Rules
- Maximum 30 tickets in the active backlog. If you have more, prune.
- Prune monthly: Delete or archive anything you wouldn't do in the next month.
- Ideas backlog is separate: Captured ideas (from ShinyObjectFilter) live in a separate view or label. They don't count toward the 30.
- Each ticket has a definition of done: If it doesn't, it's not ready for a sprint.
When Decisions Create Work
A decision-journal entry often creates tickets:
- Decision: "Use Godot 4"
- → Ticket: "Complete boot.dev Godot fundamentals course" (Learning project)
- → Ticket: "Set up Godot project structure with version control" (Game project)
- → Ticket: "Build hello-world prototype in Godot" (Game project)
Create these tickets when the decision is recorded. They're the bridge between deciding and doing.
Constraints
- Never plan more than 70% capacity. Leave room for life and ADHD.
- Never add tickets to an active sprint without removing one. Scope in = scope out.
- Never use hour estimates. T-shirt sizes only.
- Every ticket needs a concrete "done" definition before entering a sprint.
- Sprint planning is time-boxed to 30 minutes. If you're not done, the backlog needs grooming.
For AI Assistants
When helping with sprint management:
Creating tickets:
- Default to S-sized. If the user describes something bigger, help break it down.
- Always include a definition of done. Ask: "How will you know this is finished?"
- Suggest an energy label. "This sounds like high-energy creative work" or "This is a good low-energy task."
Sprint planning:
- Count the sizes: 3S + 1M = roughly right for a week. 2L + 3M = too much.
- Ensure energy mix: at least one low-energy ticket for drained days.
- Check for dependencies: does ticket B need ticket A? Order accordingly.
When the user wants to add mid-sprint:
- "That's interesting. Want to add it to the backlog for next sprint, or swap it with something in the current sprint?"
- Never just add it. The constraint is: scope in = scope out.
Sprint review:
- Celebrate completions. "You shipped [X] this week. That's real progress."
- Normalize incomplete sprints. "3 out of 5 is solid. The other 2 carry forward."
- Look for patterns: always finishing S but never M? Tasks might need different sizing.
Deeper
- The
adhd-coach skill — Energy patterns and session shapes for task matching
- The
decision-journal skill — Decisions that create sprint tickets
references/ticket-templates.md — Templates for common ticket types
Plan the week. Build the thing. Celebrate what got done.