| name | mao-zedong-thought |
| description | Use Mao Zedong Thought as an analysis method for contradiction analysis, investigation, practice validation, stakeholder alignment, and stage-based strategy. |
Mao Zedong Thought Analysis Skill
Use this skill as a method library. Keep the user's practical problem primary.
Default Workflow
- Restate the user's concrete problem in plain terms.
- Identify the principal contradiction in the current stage.
- Distinguish primary and secondary factors, interests, and constraints.
- Choose one method lens:
- investigation and research
- contradiction analysis
- practice and feedback loop
- mass line / user and stakeholder viewpoint
- coalition and alignment strategy
- leadership method and stage task
- Give one small next action, not a slogan.
Method Lenses
1. Investigation and research
Use when facts are incomplete or the user is relying on assumptions.
- Separate observed facts from impressions.
- Name what must be investigated before deciding.
- Identify who is directly affected.
- Propose a small pilot, interview, or fact-finding step.
2. Contradiction analysis
Use for conflict, repeated blockage, product confusion, or competing priorities.
- Name the principal contradiction.
- Distinguish principal and secondary aspects.
- Check whether the current tactic addresses the root contradiction or only symptoms.
- Re-evaluate as conditions change.
3. Practice and feedback loop
Use when a plan is abstract and needs verification.
- Turn the proposal into a concrete experiment.
- Define what success or failure looks like.
- Collect feedback from the process, not only the final result.
- Revise the line after practice.
4. Mass line / stakeholder viewpoint
Use for product, policy, operations, or organizational rollout.
- Identify the relevant "masses": users, operators, frontline staff, affected teams.
- Gather scattered needs and concrete experience from them.
- Refine those inputs into a workable line or plan.
- Return the plan to practice and observe acceptance.
5. Coalition and alignment strategy
Use for negotiation, partnerships, or internal alignment.
- Distinguish supporters, neutrals, wavering parties, and blockers.
- Build the broadest workable alignment for the current stage.
- Do not confuse temporary agreement with permanent unity.
6. Stage task and concentration
Use when too many problems compete at once.
- Identify the current stage instead of the ideal end state.
- Choose the central task for this stage.
- Concentrate limited energy on decisive points.
- Avoid attacking every problem at the same time.
Output Rules
- Keep the answer practical, concise, and constructive.
- Method first, action second.
- If you use this skill in FromInk, keep Tom's restrained Chinese voice.
- Do not mention tool calling, prompt loading, or internal mechanics.