| description | Phase 7 of the build lifecycle. Stakeholder sign-off, generate FR-by-FR UAT script, demo prep, capture written approvals, build the post-launch deferral backlog. Hard-blocks if phase 6 test-results.md is missing or contains unresolved Critical issues. Usage: /phase7-user-acceptance [--module moduleName] [--phase generate|capture] |
| user-invocable | true |
/phase7-user-acceptance: Phase 7: User Acceptance Testing
Convert the validated build into formal stakeholder sign-off. Two phases:
- Phase A (generate): produce
uat-script.md: an FR-by-FR pass/fail checklist + demo notes + a "what's deferred" deferral backlog (carrying forward majors from /phase6-user-testing and any agreed cuts).
- Phase B (capture): once stakeholders run UAT and drop their results under
./phases/phase7-user-acceptance/inputs/, capture their pass/fail per FR and signed approval into sign-off.md. Advance to /phase8-deployment only on full sign-off; otherwise stop and report.
Auto-detects phase based on existing artifacts. Force with --phase generate or --phase capture.
Output: ./phases/phase7-user-acceptance/output/uat-script.md (Phase A)
and ./phases/phase7-user-acceptance/output/sign-off.md (Phase B).
Arguments
--module moduleName: (optional) Scope to a single module.
--phase generate|capture: (optional) Force the phase.
Hard-blocks
This skill refuses to proceed when:
./phases/phase6-user-testing/output/test-results.md is missing.
test-results.md §3.10 Decision says send-back (means phase 6 didn't pass, UAT pointless).
test-results.md has any unresolved Critical issues.
For Phase B specifically:
./phases/phase7-user-acceptance/output/uat-script.md from Phase A must exist.
- At least one stakeholder UAT result must be present under
./phases/phase7-user-acceptance/inputs/.
Execution Steps
Step 0: Load context
- Load methodology:
.claude/skills/phase7-user-acceptance/methodology.md
- Load testing standard:
.claude/standards/04-testing.md
- Create the directories if they do not exist:
mkdir -p ./phases/phase7-user-acceptance/inputs ./phases/phase7-user-acceptance/output
Step 1: Verify upstream deliverable + content checks
if [ ! -f ./phases/phase6-user-testing/output/test-results.md ]; then
echo "/phase7-user-acceptance hard-block: ./phases/phase6-user-testing/output/test-results.md missing. Phase 6 Phase B must complete before UAT." >&2
exit 1
fi
if grep -qE 'Decision[^|]*\|[^|]*send.back' ./phases/phase6-user-testing/output/test-results.md \
|| grep -qiE '^[-*]?\s*Decision:\s*send.back' ./phases/phase6-user-testing/output/test-results.md; then
echo "/phase7-user-acceptance hard-block: test-results.md decision is send-back, not advance. UAT cannot start." >&2
exit 1
fi
if grep -qE 'Critical[^|]*\|[^|]*\|[^|]*\|[^|]*\|' ./phases/phase6-user-testing/output/test-results.md \
&& ! grep -qE 'Critical.*resolved' ./phases/phase6-user-testing/output/test-results.md; then
echo "/phase7-user-acceptance hard-block: test-results.md appears to contain unresolved Critical issues. Fix in /phase5-development and re-run /phase6-user-testing." >&2
exit 1
fi
Also read (for context):
./phases/phase1-requirements/output/requirements.md: for the FR list.
./phases/phase3-architecture/output/architecture.md: for component context.
Step 2: Resolve phase
PHASE="${PHASE:-auto}"
if [ "$PHASE" = "auto" ]; then
if [ -f ./phases/phase7-user-acceptance/output/uat-script.md ] \
&& [ -n "$(ls -A ./phases/phase7-user-acceptance/inputs 2>/dev/null)" ]; then
PHASE="capture"
else
PHASE="generate"
fi
fi
echo "Operating in phase: $PHASE"
Phase A: Generate (PHASE=generate)
Step 3A: Build the UAT script (per methodology.md §2)
- Read every must-have and should-have FR from
./phases/phase1-requirements/output/requirements.md.
- Build the FR-by-FR checklist: one row per FR, with the AC text restated, a "demonstrate by doing" step, and pass/fail/conditional columns the stakeholder will fill.
- Build the deferral backlog: carry forward every Major from
/phase6-user-testing (must-fix-before-/phase8-deployment) AND every Minor (post-launch) AND any agreed scope cuts from prior phases. Stakeholder reviews and confirms the deferral list.
- Write the demo prep notes: a 30-60 minute walkthrough script that exercises the 5-7 most stakeholder-relevant flows. Time-box each segment.
- Build the sign-off table skeleton: rows for each stakeholder who needs to sign, with name, role, decision (approve / approve-with-conditions / reject), date, and note column.
Step 4A: Produce uat-script.md
Write to ./phases/phase7-user-acceptance/output/uat-script.md per
output-template.md.
Step 5A: Gate check
node .claude/scripts/check-step-gates.mjs phase7-user-acceptance
Tell the human: run the UAT session, drop signed results under
./phases/phase7-user-acceptance/inputs/, then re-invoke
/phase7-user-acceptance (Phase B).
Phase B: Capture (PHASE=capture)
Step 3B: Read stakeholder UAT results
Read every file under ./phases/phase7-user-acceptance/inputs/:
- Filled-in / marked-up copies of
uat-script.md
- Signed approval PDFs or screenshots
- Stakeholder note files (one per signer is common)
Step 4B: Compute outcome
For each FR row in uat-script.md:
- Pass / Fail / Conditional-pass
Aggregate to overall decision:
- All pass → advance to
/phase8-deployment.
- Any fail OR any conditional-pass with non-trivial condition → either:
- Send-back to
/phase5-development if the failure is implementation-level (must rebuild)
- Send-back to
/phase6-user-testing if the failure is testing-coverage-level (need more validation)
- Advance to
/phase8-deployment with documented exception if stakeholder explicitly accepted the risk
Step 5B: Produce sign-off.md
Write to ./phases/phase7-user-acceptance/output/sign-off.md per
output-template-signoff.md. Capture:
- Per-FR outcome
- Per-stakeholder signature (name, role, decision, date)
- Conditional-pass conditions (each one becomes a phase 8 prerequisite, listed in §3.5 phase 8 Prerequisites with a satisfaction reference)
- Updated deferral backlog (anything stakeholders moved between buckets)
Step 6B: Gate check
node .claude/scripts/check-step-gates.mjs phase7-user-acceptance
Step 7: Report to user
Summarize:
- Phase executed
- FRs covered, demo flows, stakeholder count
- Outcomes: passes, fails, conditional-passes
- Deferral backlog size (must-fix-before-
/phase8-deployment vs post-launch)
- Decision: advance, send-back-to-
/phase5-development, or send-back-to-/phase6-user-testing
What this skill should NOT do
- Don't UAT a build with unresolved Critical issues from
/phase6-user-testing. Hard-block first.
- Don't fabricate stakeholder approval. If a sign-off cell is empty, the FR is not signed off.
- Don't reinterpret a "conditional-pass" as a "pass" to keep schedule. Conditions become
/phase8-deployment prerequisites or post-launch backlog entries.
- Don't advance to
/phase8-deployment if any required signer's row is incomplete.
- Don't deploy or scaffold, that's
/phase8-deployment and /build respectively.