Finalization
Use this skill when preparing the final work-item update after implementation and validation. Review evidence is required when the execution chain includes review, and optional otherwise.
Purpose
This composite skill exists for the post-execution step where a prompt must translate evidence into a tracker update.
Primary references
Read these sibling skills for deeper detail when needed:
../resolve/SKILL.md
../validation/SKILL.md
../review-suite/SKILL.md when review evidence is present
Primary objective
Add an accurate work-item note and close it only when the evidence supports closure.
Non-editing boundary
Finalization is a tracker and git bookkeeping step, not an implementation or repair step.
Allowed mutations are limited to:
- staging and committing already-existing related work-item changes on strict
PASS
- adding one final tracker note/comment
- closing the tracker item on strict
PASS
Do not edit source files, tests, docs, prompts, generated files, configs, or tracker work-item content except for the final note/close commands listed below. Do not run formatters, code generators, auto-fix commands, or any command whose purpose is to change repository files. Do not fix review findings during finalization. If review findings were created as follow-up work items, treat those follow-ups as closure evidence for the original item, not as tasks to perform here. If material findings were not captured as follow-ups, return REVISE and leave the original item open.
Finalization policy
- Be conservative: do not close on assumptions.
- Close only when the latest validation evidence contains the exact line
Gate: PASS, the acceptance criteria are met, required review evidence either is clean or has converted every material finding into tracker follow-ups, and the git dirty tree can be separated safely.
- Accept two validation sources:
/validation-fix evidence from the TDD path.
/ef-work evidence from the quick path.
- For branch-ref remediation or merge-ready branch work, require evidence for the published review target when the ticket mentions publishing, a remote branch, a PR/review branch, or merge readiness. Local-only branch pointer changes with
Pushed: no, missing origin/<branch> checks, or validation that only inspects a local branch are insufficient for closure unless the work item explicitly says local refs are enough.
- If evidence is partial, missing, stale, ambiguous, negative,
Gate: REVISE, or Gate: BLOCKED, add a note and leave the ticket open.
- Prefer
Gate: PASS, Gate: REVISE, and Gate: BLOCKED notes for compatibility with this repository's existing workflow.
- Include only claims supported by actual execution or explicit evidence in context.
- Do not imply review happened. Use "Review not run" when finalizing from
/ef-work or /ef-work-tdd without a consolidated review verdict.
- Never create new follow-up tickets/issues in finalization. Follow-up creation belongs to
/ef-review-with-followups; if required follow-ups are missing or failed, report REVISE.
- Treat an ambiguous dirty tree as
REVISE, not as a reason to stage broadly or close without a commit.
Review handoff requirements
When the latest review output contains a # Finalization Handoff section, prefer it over inference:
Original item may close: yes supports closure only when validation and dirty-tree requirements also pass.
Original item may close: no, missing follow-up coverage, or failed original-item commenting requires REVISE.
- If a ship chain includes review but no handoff section is present, fall back to the review verdict and follow-up evidence, but mention
Finalization handoff: missing in the final output.
Closure evidence requirements
For the TDD path, closure requires:
Gate: PASS from /validation-fix
- acceptance-criteria evidence
- published branch/PR evidence for branch-ref remediation or merge-ready branch work, unless explicitly local-only
- RED/GREEN proof when required by the spec or ticket, or an explicit RED exemption
- regression validation status, even if broader validation was not run
For the quick path, closure requires:
Gate: PASS from /ef-work
- acceptance-criteria evidence
- quick validation command output or explicit inspection evidence
- the quick-path RED exemption
- a self-review with no material scope, regression, or cleanup concern
Review evidence is optional only when the user directly runs /finalize after /ef-work or /ef-work-tdd. When a chain includes review, such as /ef-ship or /ef-ship-tdd, closure also requires the latest review evidence to support one of these outcomes:
- clean review: merge-ready/pass with no unresolved material findings
- follow-up review: findings were found,
--create-followups was enabled, every material finding was converted into a created follow-up or explicitly skipped as a duplicate of an existing follow-up, and a note/comment was added to the original work item
Do not close on failed, blocked, missing required review evidence, or review findings that were not captured as follow-up work. If review found issues but follow-up creation or original-item commenting failed, add a REVISE note and leave the item open. Do not attempt to resolve those findings here.
Tracker-specific guidance
For .tickets/ / tk work in this repository:
- use
tk show <item> to inspect the current state
- use
tk add-note <item> "..." to append the final note
- use
tk close <item> only on a true pass outcome
For .beads/ / br work:
- use
RUST_LOG=error br show <item> --json to inspect the current state
- use
ACTOR="${BR_ACTOR:-assistant}" and then RUST_LOG=error br comments add --actor "$ACTOR" <item> --message "..." --json to append the final note
- use
RUST_LOG=error br close --actor "$ACTOR" <item> --reason "..." --json only on a true pass outcome
Important: the br comment/note equivalent is br comments add (there is no br notes subcommand in the installed CLI).
For other tracker systems, do not invent a close command. Instead, report the recommended manual follow-up.
Note-writing rules
A final note or close reason should concisely capture:
- the outcome (
PASS, REVISE, or BLOCKED)
- the core change
- validation status
- quick-path exemption or TDD RED/GREEN evidence when available
- regression validation status
- review status, explicitly
not run when absent
- created or duplicate follow-up IDs when review findings were delegated
- any remaining follow-up, if the ticket stays open
Git commit policy
On a strict Gate: PASS outcome, commit already-existing related changes before closing the tracker item. Do not modify files before staging; if files need changes, output REVISE instead of making them.
- Run
git status --short and git diff --stat to confirm what changed.
- Classify every dirty path before staging:
related: directly implements, validates, or documents the selected work item.
unrelated: clearly belongs to other work and must not be staged.
- known execflow workflow-state paths (
.pi/execflow-autoship-loop-marker.json, .pi/execflow-validation-gate.json, legacy .execflow/validation-gate.json, .execflow/autoship-progress.json, and .execflow/lessons-learned.md) are unrelated by default; never stage them and do not treat them as ambiguous solely because they are dirty.
ambiguous: cannot be proven related or unrelated from the work item/spec/evidence.
- Stage only
related files. Do not stage unrelated or ambiguous changes.
- If any dirty path is ambiguous, return
REVISE and leave the item open.
- If there are no related code changes, skip the commit only when this is expected and all remaining dirty paths are clearly unrelated. For branch-ref remediation, do not treat a local-only branch pointer update as complete when the work item requires a published or merge-ready branch;
Pushed: no plus missing remote validation is a closure blocker.
- Commit with a Conventional Commits message:
<type>(<scope>): <summary> where summary is ≤ 72 chars, imperative mood, no trailing period.
- Derive
type from the work (feat, fix, refactor, test, chore, docs, perf).
- Derive
scope from the area/module if clear, otherwise omit.
- If the work-item title is short enough, it can be adapted into the subject line.
- If there are no changes to commit (e.g., the work was tracker-only), skip the commit and report "No code changes to commit."
- Close the tracker item only after the commit succeeds or is skipped because there are no related code changes.
- Do not push.
- Do not add sign-offs.
- On REVISE or BLOCKED, do not commit. Leave changes in the working tree for the next iteration.
- Do not edit files, run auto-fix commands, or repair review findings as part of committing.
Completion checklist
Before finalizing, verify:
- the work-item identity is correct
- the outcome is supported by evidence
- the note text is concise and truthful
- close only happens on strict
Gate: PASS
- close only happens with valid quick-path evidence or valid TDD validation evidence
- branch-ref remediation has published target evidence when required, not just local ref evidence
- when review is part of the chain, review evidence is clean or all material findings were captured as follow-ups with an original-item note/comment
- review follow-ups are treated as delegated future work, not work to perform during finalization
- no repository files were modified during finalization
- on PASS: already-existing related changes are committed; on REVISE/BLOCKED: nothing is committed