Effort Estimation
Analyze spec artifacts and produce a structured effort estimate — breaking down work by phase, requirement, and complexity. Gives product managers and tech leads a data-driven answer to "how long will this take?" based on what's actually in the spec, not gut feelings.
User Input
$ARGUMENTS
You MUST consider the user input before proceeding (if not empty). The user may specify:
- Team size (e.g., "solo developer", "team of 3")
- Experience level (e.g., "senior", "junior", "mixed")
- Time unit preference (e.g., "hours", "days", "story points")
- Confidence level (e.g., "optimistic", "realistic", "pessimistic")
- Specific phase or requirement to estimate
Prerequisites
- Confirm you are inside a git repository.
- Verify
.specify/ directory exists with at least spec.md.
- Read
spec.md to extract all requirements, scenarios, and success criteria.
- If
plan.md exists, read it for technical complexity signals (new tech, integrations, migrations).
- If
tasks.md exists, read it for phase structure and task granularity.
Outline
-
Calculate Complexity Score: Analyze spec artifacts to produce a complexity rating.
- Requirement count: Number of distinct requirements in spec.md
- Scenario count: Number of user scenarios
- Integration count: External services, APIs, databases mentioned
- Decision count: Technical decisions in plan.md
- Task count: Total tasks in tasks.md
- Phase count: Number of implementation phases
## Complexity Analysis
| Factor | Count | Weight | Score |
|--------|-------|--------|-------|
| Requirements | 8 | x2 | 16 |
| User Scenarios | 3 | x3 | 9 |
| External Integrations | 2 | x5 | 10 |
| Technical Decisions | 4 | x2 | 8 |
| Task Items | 14 | x1 | 14 |
| Implementation Phases | 3 | x3 | 9 |
| **Total Complexity** | | | **66** |
| Range | Level |
|-------|-------|
| 0-30 | 🟢 Simple |
| 31-60 | 🟡 Moderate |
| 61-100 | 🟠 Complex |
| 100+ | 🔴 Very Complex |
**This spec: 🟠 Complex (66)**
-
Estimate by Phase: Break down effort per implementation phase.
## Phase Estimates
| Phase | Tasks | Estimate | Includes |
|-------|-------|----------|----------|
| Phase 1: Setup | 4 | 4-6 hours | Project scaffold, dependencies, config |
| Phase 2: Core Auth | 6 | 12-18 hours | Signup, login, JWT, middleware |
| Phase 3: Admin | 4 | 8-12 hours | Dashboard, user management |
| Testing & QA | — | 6-10 hours | Unit, integration, E2E tests |
| Code Review & Polish | — | 3-5 hours | PR prep, documentation |
| **Total** | **14** | **33-51 hours** | |
-
Estimate by Requirement: Show effort per individual requirement.
## Requirement Estimates
| Requirement | Complexity | Estimate | Risk |
|-------------|-----------|----------|------|
| REQ-001: User signup | Medium | 4-6h | Low |
| REQ-002: User login | Medium | 3-5h | Low |
| REQ-003: JWT tokens | High | 5-8h | Medium (security-critical) |
| REQ-004: Rate limiting | High | 4-6h | Medium (perf testing needed) |
| REQ-005: Email verification | High | 6-8h | High (external SMTP dependency) |
-
Risk Buffer Calculation: Add buffer based on uncertainty.
## Risk Buffer
| Risk Factor | Buffer |
|-------------|--------|
| External integrations (2) | +15% |
| Security-critical features | +10% |
| First time with this tech stack | +20% |
| **Total Buffer** | **+25%** (compound, capped) |
| Estimate | Hours |
|----------|-------|
| Base estimate | 33-51h |
| With risk buffer (+25%) | 41-64h |
| **Recommended** | **~50 hours** (midpoint with buffer) |
-
Three-Point Estimate: Provide optimistic, realistic, and pessimistic.
## Three-Point Estimate
| Scenario | Hours | Days (8h/day) | Weeks |
|----------|-------|---------------|-------|
| 🟢 Optimistic | 33h | 4.1 days | ~1 week |
| 🟡 Realistic | 50h | 6.3 days | ~1.5 weeks |
| 🔴 Pessimistic | 72h | 9.0 days | ~2 weeks |
-
Output: Deliver the complete estimate report.
Rules
- Read-only — never modify any files, only analyze and report
- Data-driven — every estimate must trace to specific spec content (requirement count, task count, integration count), never arbitrary
- Range-based — always give ranges, never single-point estimates
- Three-point — always include optimistic, realistic, and pessimistic scenarios
- Buffer-explicit — clearly show what risk buffer is added and why
- No false precision — don't estimate to the minute; use hour ranges for small specs, day ranges for large ones
- Transparent methodology — show the complexity scoring formula so estimates can be challenged and refined
- Team-aware — adjust estimates if user specifies team size or experience level