linear-backlog-manager

Estrellas2
Forks0
Actualizado11 de julio de 2026 a las 15:57

Publish an approved feature spec (tasks.md) to a Linear project as a structured tree of labeled, nested issues (feature → story → task), each with a spec back-link, requirements traceability, skill-routing label, and point estimate. Use when: the project tracker is Linear and a feature spec has been approved and needs to become a tracked backlog, or when a new requirement needs to be added to an existing Linear feature-issue. Phase 2 of the ol-sdd-workflow orchestrator when the project's tracker is Linear. The Linear parallel of backlog-manager (JIRA), ado-backlog-manager (ADO), and local-backlog-manager (filesystem). Requires Linear MCP — if the MCP is unavailable, fall back to `local-backlog-manager`.