critical-risk-manager

Use this skill when building or reviewing a bow tie risk assessment, defining a critical risk, assessing control (barrier) assurance, or scoring residual risk for NZ/AU workplace hazards. Triggers on "bow tie", "bowtie", "critical risk", "control assurance", "barrier", "top event", "barrier analysis", "threat", "consequence", "risk matrix", "residual risk", "escalation factor", "critical control". Builds the structured visual risk story for high-energy / fatal-risk hazards — crane lifts, confined space, working at height, chemical handling, traffic/mobile plant, electrical, dropped objects. Grounded in HSWA 2015 (NZ) and the WHS model law (AU). Use the bow tie structure here before starting any bow tie.

Ir a la instalación

Datos de origen

Repositorio
scottmss/hse-nz-au-skills
Última actividad en el origen
2 de julio de 2026 a las 02:05
Idioma detectado de SKILL.md
inglés
Estrellas
0
Forks
1

Opciones de instalación

De forma predeterminada está seleccionado el prompt que primero revisa el origen. Puedes cambiar a un comando directo o descargar una copia local.

Revisa los archivos de origen

Lee SKILL.md y los archivos complementarios que muestra SkillsMP antes de decidir si quieres instalarlo.