retrospective
Sprint Retrospective — record improvements for the next cycle
Instalar con Codex o Claude Copia este prompt, pégalo en Codex, Claude u otro asistente, y deja que revise la página de la skill y la instale por ti.
Menú
Sprint Retrospective — record improvements for the next cycle
Instalar con Codex o Claude Copia este prompt, pégalo en Codex, Claude u otro asistente, y deja que revise la página de la skill y la instale por ti.
Basado en la clasificación ocupacional SOC
Whole-repo, multi-agent audit that IS the Sprint-end cross-review ceremony (product-wide integrity): 4 axes — spec-conformance, logic/defect hunt, redundancy, and product-security — over the ACCUMULATED codebase at HEAD, not the Sprint diff. Findings are swept to zero per defect class — one class = one PBI covering every occurrence, documentation drift batched into a single DOCS PBI — and non-blocking: Critical/High become draft PBIs for the NEXT Sprint, Medium/Low at PO discretion. At Integration-Sprint entry a thin re-check confirms the latest audit is fresh and no open Critical/High audit PBIs remain before testing proceeds.
Sprint-end product-wide integrity gate. The five per-aspect reviews (requirement conformance, functional quality, security, maintainability, docs consistency) now run PER-PBI inside the pipeline before a PBI reaches awaiting_cross_review. Sprint-end cross-review is the whole-repo codebase-audit ONLY: static analysis + 4 audit axes (spec-conformance, logic-defect, redundancy, product-security) over the accumulated codebase at HEAD. The audit is non-blocking — Critical/High findings become draft PBIs for the next Sprint; it never reverts a PBI.
Handles PBI pipeline escalation notifications from Developer. Reads escalation context, applies response matrix (retry / split / hold / human), and routes to user when human intervention is needed.
SM-side merge orchestration for a single PBI. Triggered when the Developer notifies `[<pbi-id>] PBI_READY_TO_MERGE`. Drives `.scrum/scripts/merge-pbi.sh` and handles the failure / retry cycle through SendMessage to the assigned Developer.
PBI development pipeline — orchestrates design, impl+UT, PBI review, and UT-run stages with sub-agent fan-out, file-based handoff, and deterministic termination gates (Anthropic + Ralph + GAN-derived). Used by Developer per assigned PBI. Replaces former design + implementation skills.
PO acceptance verification — launches and operates the app to verify acceptance criteria by command execution. Used in Sprint Review (demo mode) and Integration Sprint (UAT mode) when .scrum/config.json po_mode is "agent".
| name | retrospective |
| description | Sprint Retrospective — record improvements for the next cycle |
| disable-model-invocation | false |
When .scrum/config.json.po_mode == "agent", every PO-approval prompt
below re-targets to the product-owner teammate per
../../rules/scrum-context.md § PO seat resolution; the ceremony shape is
unchanged. Skill-specific: with no human at the keyboard, the Step 7
"recommend /clear or session restart to the user" line cannot be
acted on by anyone in-session (human mode keeps that recommendation
bit-for-bit).
Overrides in agent mode:
/clear recommendation. The retrospective is not
the end of the workflow — leaving state.json.phase at
retrospective is a dead end: nothing advances it, and the
autonomy watchdog reads an unchanged phase as no_progress and
trips the failure circuit breaker. After the retrospective Exit
Criteria are met, the SM must obtain a Product-Owner
sprint_continuation decision and advance the phase itself
(Step 8 below). The PO — not the SM and not the watchdog — owns
the call of whether another Sprint is warranted, because it turns
on Product-Goal completion. Only once the phase has advanced to
backlog_created, integration_sprint, or complete does the
SM end the turn.[sprint-<N>] PO_DECISION_REQUEST kind=change_request options=[adopt,defer,reject] recommendation=<sm-preferred> to
the product-owner teammate before recording the improvement,
so the improvements.json entry carries the matching dec_id. If
no such "ask the user" prompt exists in your current reflection,
this rule is a no-op.PO_DECISION from the current Sprint whose rationale begins
with ASSUMPTION: (or which sets the wrapper's assumption=true
flag — see ../../agents/product-owner.md § Anti-loop rules) is a
candidate improvement: record an entry pointing to the dec_id
so the next refinement / planning cycle revisits the unverified
premise..scrum/scripts/update-state-phase.sh retrospective
.scrum/scripts/append-improvement.sh --sprint <sprint-id> --description "<what to improve>" for each item. The wrapper auto-assigns id (imp-NNNN), stamps created_at, sets status: "active", and validates against improvements.schema.json. In po_mode=agent, when the entry derives from a PO_DECISION_REQUEST round-trip, pass --dec-id dec-NNNN to link the entry to the decision record. Direct edits to .scrum/improvements.json are blocked by pre-tool-use-scrum-state-guard.sh.improvements.json.last_consolidation_sprint. Consolidation is
DUE when it is null and entries span ≥3 Sprints, or when the
current Sprint number is ≥3 ahead of it. When due:
status: "active" entry and decide which are
stale — addressed (the improvement landed), obsolete (the
process/tool it targets no longer exists), or superseded by a
newer entry. Left unconsolidated, the active list grows
unbounded and stops being readable (a target project reached
150+ entries with consolidation 20+ Sprints overdue)..scrum/scripts/consolidate-improvements.sh --sprint <sprint-id> \
--archive imp-NNNN --archive imp-NNNN
Zero --archive flags is valid ("reviewed, nothing stale") and
still bumps last_consolidation_sprint. Direct edits to
.scrum/improvements.json remain blocked by
pre-tool-use-scrum-state-guard.sh — the wrapper is the only
sanctioned path..scrum/scripts/update-sprint-status.sh complete
Ref: FR-012
After Sprint deliverables are committed and Retrospective is complete, recommend session reset to the user:
"Sprint N complete. All state persisted to .scrum/ JSON files. Recommend
/clearor session restart to free context for next Sprint. Session-context hook will restore phase automatically on restart."
Rationale: Scrum Master context accumulates across phases (requirements, design discussions, review findings). By Sprint end, context is near capacity. All durable state lives in .scrum/ files — session-context.sh restores phase on restart.
Human mode skips this step (Step 7's /clear recommendation
applies instead; the user drives the next Sprint manually, and
sprint-planning accepts phase: retrospective as its entry).
In agent mode, once Steps 1–6 are complete, the SM asks the PO what comes next and advances the workflow:
Send the Product Owner teammate:
[sprint-<N>] PO_DECISION_REQUEST kind=sprint_continuation
options=[next_sprint,integration_sprint,complete]
recommendation=<sm-preferred>
payload: product_goal_status=<met|not_met>,
refined_pbis_remaining=<count>,
sprints_this_launch=<history_len - sprint_baseline>/<max_sprints>
The recommendation follows the same precedence the PO uses
(see ../../agents/product-owner.md § Sprint continuation): default
next_sprint while feature PBIs remain and Sprints are left.
On PO_DECISION ... decision=choice:<label> dec_id=dec-NNNN,
advance state.json.phase to match — this is the step that
unblocks the autonomy watchdog:
| PO decision | Phase transition |
|---|---|
choice:next_sprint | .scrum/scripts/update-state-phase.sh backlog_created |
choice:integration_sprint | .scrum/scripts/update-state-phase.sh integration_sprint |
choice:complete | .scrum/scripts/update-state-phase.sh complete |
The decision is already audit-logged by the PO via
append-po-decision.sh; the SM only performs the phase write.
End the turn. The watchdog's completion-gate treats a
backlog_created phase that follows a recorded Sprint
(sprint-history non-empty) as a recycle checkpoint, so the next
session starts fresh on Sprint Planning. integration_sprint
and complete are likewise clean stop points.
Do not end the turn while phase is still retrospective in
agent mode — that is the dead end this step exists to prevent.
sprint_continuation
PO decision is recorded and state.json phase has advanced to
backlog_created, integration_sprint, or complete (never left
at retrospective).