QA Test-Authoring Task (Stage 6 authoring phase)
Use this skill when you are the QA Developer writing tests during the Stage 6
authoring phase. This phase produces the test code; running the suite is a
separate execution phase (see skills/qa-test-execution/SKILL.md).
Procedure
- Read
pipeline/context.md — check for PM-ANSWER: items and
## Brief Changes that affect acceptance criteria.
- Read
pipeline/brief.md carefully. For each acceptance criterion in §3,
plan at least one test that exercises it. Map one-to-one where possible —
§3.1 → test "…ac1…", §3.2 → test "…ac2…". This mapping enables the
sign-off auto-fold.
2a. If pipeline/spec.feature exists (stage-03b ran), it is the canonical
list of behaviours to test. Every Scenario: in the file must have at
least one test mapped to it. The Scenario name + @AC-N tag are how the
test-report mapping table cross-references back to the brief. Run
devteam spec verify after writing test-report.md to catch drift between
brief / spec / report.
- Append an
## Assumptions block to pipeline/context.md for non-obvious
test choices (e.g. "assuming deterministic clock via clock-injection;
otherwise flaky on CI"). Per coding-principles §1.
- Write tests in
src/tests/ organised by type:
src/tests/unit/ — isolated logic
src/tests/integration/ — service interactions
src/tests/e2e/ — at least one E2E per acceptance criterion
- Match existing test conventions. If a convention is missing, read the
code-conventions skill and note in
pipeline/pr-qa.md under
## Conventions applied.
- Do not mock away real business logic. Test real behaviour. If a test
requires a mock (network, clock, random), justify it inline with a
one-line comment.