| description | Decomposes a large Linear (MonElu) issue into ordered, solve-mon-sized sub-issues - explores the codebase to ground the plan, drafts sub-issues with Scope and Acceptance criteria, flags architectural decisions for the ADR first, and creates them in Linear under the parent. Use as /plan-epic <MON-id>, e.g. /plan-epic MON-91. |
Turn one epic-sized Linear issue into a sequence of sub-issues that each fit the /solve-mon cycle (one branch, one PR, reviewable in one sitting).
This skill only plans and writes to Linear - it never touches code, branches, or PRs.
ARGUMENTS: one MON-id of the epic to decompose.
Linear writes (mcp__linear-server__save_issue, save_comment) are allowlisted in .claude/settings.local.json.
If the Linear MCP is unavailable, say so and output the drafted sub-issues for manual creation instead.
Workflow
1. Read the epic
- Fetch the full issue with
mcp__linear-server__get_issue: title, description, priority, labels, milestone, comments.
- If the issue already has sub-issues (
parentId children), list them and reconcile: plan only the missing parts, never duplicate.
- If the issue is actually solve-mon-sized (clear scope, one surface, existing acceptance criteria), say so and recommend
/solve-mon directly instead of decomposing.
2. Ground the plan in the codebase
Before drafting anything, explore the code the epic touches:
- Which tables/marts exist vs. need creating (
data/migrations/, transform/models/).
- Which API endpoints exist vs. need adding (
api/routers/).
- Which frontend pages/components exist vs. need building (
frontend/src/).
- Whether ingestion needs new data the AN open data portal must provide (
scripts/ingest_*.py) - verify the source data actually exists before planning around it.
- Read
docs/decisions.md - the plan must not contradict an ADR.
A plan step that assumes code or data that does not exist is the main failure mode this step prevents.
3. Identify decisions before work
Separate two kinds of items:
- Architectural decisions (new table vs. new mart, client-side vs. server-side, third-party service adoption, anything with cost or lock-in): these become the first step of the plan, resolved via the
adr-skill, and block the dependent sub-issues.
- Implementation steps: everything else.
Never bury a decision inside an implementation sub-issue.
4. Draft the sub-issues
Slice by deliverable layer and dependency order - the proven pattern from MON-90 (backend PR #172, then frontend PR #173):
- Schema/migration or dbt mart changes (if any)
- API endpoint(s)
- Frontend page/component(s)
- Ingestion or RAG index changes (if any)
- Docs/SEO/polish
Each sub-issue must have:
- Title: concise, action-verb-first, suffixed with the epic reference (e.g. "Add follow-deputy API endpoints (MON-91 backend)").
- Description in the established format:
one-line context sentence, then a Scope bullet list, then an Acceptance criteria bullet list.
Acceptance criteria must be checkable by
/solve-mon step 11 without interpretation.
- Size check: if a sub-issue would touch more than ~2 layers or needs its own decomposition, split it again.
- Priority: inherit from the epic unless a step is clearly blocking (raise it) or polish (lower it).
- Dependencies: note "depends on " in the description body; also set
blockedBy relations where real.
5. Review with the user
Present the full plan as a numbered list (title, one-line scope, dependency) before creating anything.
Include: which steps are decision-first ADR items, the suggested order, and anything the epic asked for that is being deferred and why.
Proceed to create unless the user redirects.
6. Create in Linear
For each drafted sub-issue: save_issue with team MonElu, state Backlog, parentId set to the epic, labels carried over from the epic plus the layer label (api, frontend, database, rag, ingestion), and the epic's milestone.
Set blockedBy relations between sequential sub-issues where the dependency is real, not just preferred order.
Then comment on the epic (save_comment) with the plan summary and links, and move the epic to Todo (it is now planned; it goes In Progress when the first sub-issue does).
7. Report
Print the created sub-issue ids and URLs in execution order, marking which one /solve-mon should pick up first and which are blocked on an ADR.
Guard rails
- This skill never writes code, never branches, never opens PRs.
- Never create sub-issues for work whose data source or upstream dependency is unverified - flag it as a research step instead.
- Check for existing near-duplicate issues (backlog-wide title similarity) before creating; link relations instead of duplicating.
- Do not decompose into more than ~7 sub-issues in one pass; if the epic genuinely needs more, propose milestone-level phasing to the user first.
- Never touch Done/Canceled/Duplicate issues.